GENERATED2026-07-15 03:44
FORTRESS REPAIRHP Roll-Down Analysis
Payback gate: 12mo (1.0yr)
SS = Max(LC+ND, (LC+SP+ND)/2)
TOTAL HEDGE (CURRENT)
$20,124/yr
TOTAL HEDGE (CHEAPEST)
$24,964/yr
Δ HEDGE (CHEAPEST vs CURRENT)
+$4,840/yr
ROLL DEBIT (CHEAPEST)
-$5,655
MAX LOSS REDUCTION (PROTECTIVE)
-$43,250
PORTFOLIO ACTION SUMMARY · 41 positions
3 · ROLL NOW4 · LEAPS-ONLY34 · OK
Click any ticker row below to jump to its analysis section.
What do these actions mean? (legend)
NO HEDGE — No HP leg at all — naked synthetic long, no catastrophic protection.
ROLL IMMEDIATELY — Healthy fortress, HP expires ≤14d — roll the hedge out NOW (theta cliff).
REPAIR NOW — Structurally bad (HP ITM/tight or costly) AND ≤14d — roll HP DOWN today.
REPAIR SOON — Structurally bad AND ≤35d — roll HP DOWN this week.
ROLL NOW — Healthy fortress, HP ≤45d — roll the hedge OUT (maintain/raise strike).
REPAIR PLAN — Structurally bad but >35d runway — plan the roll-down, no rush.
LEAPS-ONLY — CSV-declared SP=0/HP=0 — intentional LC-only structure, no hedge to roll.
OK — Healthy structure with ample HP runway — no action.
REPAIR = roll HP down to a cheaper OTM strike (structure is hurting). ROLL = roll HP out/up to a later expiry (structure is healthy, hedge just expiring).

Fortress Position Overview

FORTRESSSTOCKLCSPHPSC BE‑SS CC‑SS GAPRMHP OTM%STATUSCTRSICNOTIONALURGENCY
BMNR →
+10C −18P +10P
$16.18 1018 100 $17.13 $19.55 82.28x 38.2% SAFE 50 $31,250$80,925 ROLL NOW (37d)
INTC →
+85C −100P +35P −121C
$108.34 85100 35121 $114.00 $117.16 653.24x 67.7% SAFE 5 $14,500$54,170 ROLL NOW (37d)
IREN (Neville) →
+45C −65P +21P
$38.41 4565 210 $56.50 $59.23 4415.67x 45.3% SAFE 20 $6,000$76,820 ROLL NOW (37d)
GOOG (Joint)
+310C −370C
$357.55 3100 0370 $392.50 $339.78 01.00x 0.0% N/A 5 $41,250$178,775 LEAPS-ONLY
GOOG (Main)
+310C −360C
$357.55 3100 0360 $392.50 $339.78 01.00x 0.0% N/A 10 $82,500$357,550 LEAPS-ONLY
IGV
+70C −100C
$93.39 700 0100 $96.50 $86.68 01.00x 0.0% N/A 12 $31,800$112,068 LEAPS-ONLY
SPY
+640C
$752.04 6400 00 $764.00 $693.47 01.00x 0.0% N/A 12 $148,800$902,448 LEAPS-ONLY
AMZN
+215C −260P +230P −258C
$247.80 215260 230258 $256.25 $239.75 301.80x 7.2% OK 10 $37,500$247,800 OK
APP
+460C −540P +185P −490C
$448.24 460540 185490 $588.00 $602.77 3553.77x 58.7% SAFE 1 $12,800$44,824 OK
CLSK
+17C −17P +10P
$13.39 1717 100 $20.74 $17.04 72.87x 25.3% SAFE 25 $9,350$33,475 OK
COIN (Main)
+165C −240P +85P −175C
$159.51 165240 85175 $210.90 $214.80 15510.23x 46.7% SAFE 8 $13,440$127,608 OK
COIN (RetireInc)
+145C −200P +75P −175C
$159.51 145200 75175 $182.40 $185.18 1257.31x 53.0% SAFE 3 $5,940$47,853 OK
COPX
+65C −90P +68P −82C
$78.50 6590 6882 $93.40 $94.38 221.77x 13.4% SAFE 20 $56,800$157,000 OK
CRWV
+105C −120P +40P
$79.81 105120 400 $125.45 $128.99 804.91x 49.9% SAFE 5 $10,225$39,905 OK
DELL
+340C −390P +150P −465C
$452.28 340390 150465 $398.00 $409.60 2405.14x 66.8% SAFE 3 $17,400$135,684 OK
ENPH
+45C −60P +20P
$44.79 4560 200 $56.15 $58.61 406.48x 55.3% SAFE 10 $7,300$44,790 OK
ETHA
+13C −16P +10P
$14.16 1316 100 $17.33 $17.94 62.39x 29.4% SAFE 50 $21,650$70,825 OK
GLD
+320C −450P +330P −379C
$371.63 320450 330379 $456.00 $472.25 1201.88x 11.2% SAFE 10 $136,000$371,630 OK
GLXY
+38C −38P +18P
$24.05 3838 180 $39.71 $33.86 2010.05x 27.2% SAFE 125 $27,625$300,562 OK
GOOG (Neville)
+300C −345P +310P −360C
$357.55 300345 310360 $373.00 $338.87 351.48x 13.3% SAFE 15 $109,500$536,325 OK
GOOG (Neville)
+340C −405P +360P −360C
$357.55 340405 360360 $398.00 $376.10 451.88x -0.7% ITM 5 $25,500$178,775 OK
HIMS
+10C −20P +5P −40C
$34.52 1020 540 $17.47 $18.74 154.04x 85.5% SAFE 15 $7,395$51,780 OK
IREN (Joint)
+25C −47P +35P
$38.41 2547 350 $44.00 $48.74 121.75x 8.9% OK 20 $32,000$76,820 OK
IREN (Main)
+25C −47P +35P
$38.41 2547 350 $44.00 $48.74 121.75x 8.9% OK 20 $32,000$76,820 OK
IREN (RetireInc)
+50C −70P +23P
$38.41 5070 230 $63.43 $67.85 477.86x 40.1% SAFE 20 $13,700$76,820 OK
MARA (Joint)
+20C −17P +10P
$12.05 2017 100 $24.33 $18.96 72.62x 17.0% SAFE 50 $21,650$60,275 OK
MARA (Main)
+20C −25P +15P
$12.05 2025 150 $22.69 $18.09 1027.32x -24.4% ITM 200 $7,600$241,100 OK
MARA (Neville)
+25C −15P +13P
$12.05 2515 130 $26.40 $14.62 22.43x -7.8% ITM 250 $35,000$301,375 OK
MDB
+270C −340P +150P
$340.70 270340 1500 $362.90 $372.68 1903.05x 56.0% SAFE 1 $9,290$34,070 OK
META
+480C −650P +330P −630C
$658.94 480650 330630 $601.50 $602.99 3205.38x 49.9% SAFE 3 $21,900$197,682 OK
MSTR
+125C −185P +55P −122C
$96.51 125185 55122 $161.00 $168.18 13011.83x 43.0% SAFE 4 $4,800$38,604 OK
MU (Main)
+880C −1010P +320P −1075C
$981.54 8801010 3201075 $1028.60 $1055.47 6905.64x 67.4% SAFE 5 $74,300$490,770 OK
MU (Neville)
+970C −1110P +370P −1060C
$981.54 9701110 3701060 $1220.00 $1247.06 7403.96x 62.3% SAFE 2 $50,000$196,308 OK
NEM
+88C −105P +75P −100C
$94.33 88105 75100 $114.54 $116.70 302.11x 20.5% SAFE 5 $13,520$47,165 OK
NOW
+80C −110P +90P −115C
$104.58 80110 90115 $108.93 $112.34 201.72x 13.9% SAFE 10 $27,850$104,585 OK
NVDA
+140C −175P +70P −225C
$211.59 140175 70225 $199.60 $202.82 1052.76x 66.9% SAFE 5 $29,800$105,792 OK
QCOM
+190C −210P +90P −190C
$178.80 190210 90190 $224.00 $227.23 1204.53x 49.7% SAFE 5 $17,000$89,400 OK
RIOT
+17C −40P +17P
$20.03 1740 170 $23.65 $30.60 238.59x 15.1% SAFE 50 $15,150$100,150 OK
RKLB
+115C −135P +45P
$79.15 115135 450 $141.55 $147.58 904.39x 43.1% SAFE 6 $15,930$47,490 OK
SOFI
+10C −13P +5P −23C
$18.45 1013 523 $15.75 $16.14 82.39x 72.9% SAFE 35 $20,125$64,575 OK
SPCX
+150C −195P +135P −155C
$136.94 150195 135155 $186.00 $182.72 603.22x 1.4% TIGHT 5 $13,500$68,472 OK

BMNR: HP 10P Maintenance Roll-Out · exp Aug 21 '26, 37d

Stock: $16.18 Current HP: 10P (37d, 38.2% OTM) Current hedge: $5,919/yr Current ML: $71,250 CC income: $83,119/yr Cost cap: 25% of CC = $20,780/yr IV: HIGH 5 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 10 → 10P (Nov 20 '26, 128d, 38.2% OTM) | Cost: $9,410/yr (11% of CC) | New ML: $71,250 = ML | Roll DEBIT $2,900 | Margin (TIMS): $920
PROTECTIVE PICK (lowest ML within cost cap): HP 10 → 12P (Jan 15 '27, 184d, 25.9% OTM) | Cost: $16,762/yr (20% of CC) | New ML: $61,250 ↓ $10,000 | Roll DEBIT $8,050 | Margin (TIMS): $820
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 10 CHEAP Nov 20 128d 38.2% $0.60 $0.66 $9,410 11% $71,250 = D $2,900
2 10 Jan 15 184d 38.2% $0.97 $1.01 $10,018 12% $71,250 = D $4,650
3 11 Nov 20 128d 32.0% $0.73 $0.97 $13,830 17% $66,250 -$5,000 D $4,450
4 12 PROT Jan 15 184d 25.9% $1.62 $1.69 $16,762 20% $61,250 -$10,000 D $8,050
5 12 Nov 20 128d 25.9% $1.08 $1.29 $18,393 22% $61,250 -$10,000 D $6,050
POST-REPAIR SUSTAINABILITY CC chain Aug 14 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $20, B $0.34 $20,400/yr $9,410/yr SELF-FUNDING
CC at MID $19 0.6σ, B $0.59 $35,400/yr $9,410/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($20, bid $0.34). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

IREN (Neville): HP 21P Maintenance Roll-Out · exp Aug 21 '26, 37d

Stock: $38.41 Current HP: 21P (37d, 45.3% OTM) Current hedge: $13,811/yr Current ML: $94,000 CC income: $117,969/yr Cost cap: 25% of CC = $29,492/yr IV: HIGH 13 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 21 → 21P (Oct 16 '26, 93d, 45.3% OTM) | Cost: $14,992/yr (13% of CC) | New ML: $94,000 = ML | Roll DEBIT $2,660 | Margin (TIMS): $1,749
PROTECTIVE PICK (lowest ML within cost cap): HP 21 → 27P (Oct 16 '26, 93d, 29.7% OTM) | Cost: $27,866/yr (24% of CC) | New ML: $82,000 ↓ $12,000 | Roll DEBIT $5,940 | Margin (TIMS): $1,599
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 21 CHEAP Oct 16 93d 45.3% $1.18 $1.91 $14,992 13% $94,000 = D $2,660
2 21 Sep 18 65d 45.3% $0.92 $1.34 $15,049 13% $94,000 = D $1,520
3 22 Oct 16 93d 42.7% $1.43 $2.00 $15,699 13% $92,000 -$2,000 D $2,840
4 22 Sep 18 65d 42.7% $1.33 $1.49 $16,734 14% $92,000 -$2,000 D $1,820
5 23 Sep 18 65d 40.1% $1.17 $1.69 $18,980 16% $90,000 -$4,000 D $2,220
6 23 Oct 16 93d 40.1% $1.65 $2.54 $19,938 17% $90,000 -$4,000 D $3,920
7 24 Oct 16 93d 37.5% $1.93 $2.86 $22,449 19% $88,000 -$6,000 D $4,560
8 25 Oct 16 93d 34.9% $2.67 $2.91 $22,842 19% $86,000 -$8,000 D $4,660
9 24 Sep 18 65d 37.5% $1.40 $2.14 $24,034 20% $88,000 -$6,000 D $3,120
10 26 Oct 16 93d 32.3% $2.80 $3.20 $25,118 21% $84,000 -$10,000 D $5,240
11 25 Sep 18 65d 34.9% $2.03 $2.36 $26,505 22% $86,000 -$8,000 D $3,560
12 27 PROT Oct 16 93d 29.7% $3.30 $3.55 $27,866 24% $82,000 -$12,000 D $5,940
POST-REPAIR SUSTAINABILITY CC chain Aug 14 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $60, B $0.70 $16,800/yr $14,992/yr SELF-FUNDING
CC at MID $49 0.7σ, B $1.90 $45,600/yr $14,992/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($60, bid $0.70). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

INTC: HP 35P Maintenance Roll-Out · exp Aug 21 '26, 37d

Stock: $108.34 Current HP: 35P (37d, 67.7% OTM) Current hedge: $395/yr Current ML: $47,000 CC income: $46,299/yr Cost cap: 25% of CC = $11,575/yr IV: HIGH 51 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 35 → 35P (Sep 18 '26, 65d, 67.7% OTM) | Cost: $562/yr (1% of CC) | New ML: $47,000 = ML | Roll DEBIT $95 | Margin (TIMS): $2,756
PROTECTIVE PICK (lowest ML within cost cap): HP 35 → 78P (Oct 16 '26, 93d, 28.5% OTM) | Cost: $10,302/yr (22% of CC) | New ML: $25,750 ↓ $21,250 | Roll DEBIT $2,620 | Margin (TIMS): $1,700
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 35 CHEAP Sep 18 65d 67.7% $0.10 $0.20 $562 1% $47,000 = D $95
2 36 Sep 18 65d 66.8% $0.05 $0.21 $590 1% $46,500 -$500 D $100
3 37 Sep 18 65d 65.8% $0.07 $0.22 $618 1% $46,000 -$1,000 D $105
4 40 Sep 18 65d 63.1% $0.15 $0.22 $618 1% $44,500 -$2,500 D $105
5 35 Oct 16 93d 67.7% $0.11 $0.32 $628 1% $47,000 = D $155
6 40 Oct 16 93d 63.1% $0.24 $0.35 $687 1% $44,500 -$2,500 D $170
7 38 Sep 18 65d 64.9% $0.07 $0.25 $702 2% $45,500 -$1,500 D $120
8 43 Sep 18 65d 60.3% $0.17 $0.28 $786 2% $43,000 -$4,000 D $135
9 41 Sep 18 65d 62.2% $0.13 $0.30 $842 2% $44,000 -$3,000 D $145
10 39 Oct 16 93d 64.0% $0.21 $0.44 $863 2% $45,000 -$2,000 D $215
11 42 Sep 18 65d 61.2% $0.14 $0.33 $927 2% $43,500 -$3,500 D $160
12 45 Sep 18 65d 58.5% $0.26 $0.33 $927 2% $42,000 -$5,000 D $160
13 78 PROT Oct 16 93d 28.5% $4.95 $5.25 $10,302 22% $25,750 -$21,250 D $2,620
POST-REPAIR SUSTAINABILITY CC chain Aug 14 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $118, B $8.20 $49,200/yr $562/yr SELF-FUNDING
CC at MID $126 0.4σ, B $5.95 $35,700/yr $562/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($118, bid $8.20). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

HP roll-downs do not change Safe Strike. SS = Max(LC+ND, (LC+SP+ND)/2). HP is not in the formula.

Monthly hedge cost prorated: (30/DTE) × (Ask × Shares). Payback = ML increase / Annual savings.

EST = ask price estimated as mid × 1.10 (10% safety buffer). Verify with live prices before executing.

Always prefer longest viable DTE for repair rolls (fewer rolls/yr = lower annual cost).