GENERATED2026-08-04 21:50
FORTRESS REPAIRHP Roll-Down Analysis
Payback gate: 12mo (1.0yr)
SS = Max(LC+ND, (LC+SP+ND)/2)
TOTAL HEDGE (CURRENT)
$21,968/yr
TOTAL HEDGE (REPAIRED)
$8,027/yr
ANNUAL SAVINGS
$13,941/yr
ROLL CREDITS
$3,500
ADDITIONAL MAX LOSS
$6,250
PORTFOLIO ACTION SUMMARY · 46 positions
11 · ROLL NOW1 · REPAIR PLAN6 · LEAPS-ONLY28 · OK
Click any ticker row below to jump to its analysis section.
What do these actions mean? (legend)
NO HEDGE — No HP leg at all — naked synthetic long, no catastrophic protection.
ROLL IMMEDIATELY — Healthy fortress, HP expires ≤14d — roll the hedge out NOW (theta cliff).
REPAIR NOW — Structurally bad (HP ITM/tight or costly) AND ≤14d — roll HP DOWN today.
REPAIR SOON — Structurally bad AND ≤35d — roll HP DOWN this week.
ROLL NOW — Healthy fortress, HP ≤45d — roll the hedge OUT (maintain/raise strike).
REPAIR PLAN — Structurally bad but >35d runway — plan the roll-down, no rush.
LEAPS-ONLY — CSV-declared SP=0/HP=0 — intentional LC-only structure, no hedge to roll.
OK — Healthy structure with ample HP runway — no action.
REPAIR = roll HP down to a cheaper OTM strike (structure is hurting). ROLL = roll HP out/up to a later expiry (structure is healthy, hedge just expiring).

Fortress Position Overview

FORTRESSSTOCKLCSPHPSC BE‑SS CC‑SS GAPRMHP OTM%STATUSCTRSICNOTIONALURGENCY
APP →
+460C −540P +185P
$414.81 460540 1850 $588.00 $603.64 3553.77x 55.4% SAFE 1 $12,800$41,480 ROLL NOW (45d)
COIN (RetireInc) →
+145C −200P +75P −160C
$149.77 145200 75160 $182.40 $188.51 1257.31x 49.9% SAFE 3 $5,940$44,931 ROLL NOW (45d)
CRWV →
+105C −120P +40P
$91.32 105120 400 $125.45 $130.27 804.91x 56.2% SAFE 5 $10,225$45,660 ROLL NOW (45d)
ENPH →
+45C −60P +20P −41C
$40.61 4560 2041 $56.15 $59.39 406.48x 50.8% SAFE 10 $7,300$40,610 ROLL NOW (45d)
IREN (RetireInc) →
+50C −70P +23P
$41.06 5070 230 $63.43 $67.73 477.86x 44.0% SAFE 20 $13,700$82,120 ROLL NOW (45d)
MDB →
+270C −340P +150P −410C
$372.06 270340 150410 $362.90 $382.40 1903.05x 59.7% SAFE 1 $9,290$37,206 ROLL NOW (45d)
MSTR (RetireInc) →
+125C −185P +55P −110C
$95.16 125185 55110 $161.00 $167.39 13011.83x 42.2% SAFE 4 $4,800$38,064 ROLL NOW (45d)
MU (Main) →
+880C −1010P +320P −930C
$885.79 8801010 320930 $1028.60 $1058.11 6905.64x 63.9% SAFE 5 $74,300$442,896 ROLL NOW (45d)
NEM →
+88C −105P +75P −100C
$97.81 88105 75100 $114.54 $117.69 302.11x 23.3% SAFE 5 $13,520$48,905 ROLL NOW (45d)
QCOM →
+190C −210P +90P −165C
$157.63 190210 90165 $224.00 $229.91 1204.53x 42.9% SAFE 5 $17,000$78,815 ROLL NOW (45d)
RKLB →
+115C −135P +45P
$74.09 115135 450 $141.55 $148.37 904.39x 39.3% SAFE 6 $15,930$44,451 ROLL NOW (45d)
UAMY →
+10C −12P +8P −7C
$5.88 1012 87 $12.45 $13.11 53.08x -27.6% ITM 25 $6,000$14,700 REPAIR PLAN (108d)
GOOG (Joint)
+310C −355C
$369.17 3100 0355 $392.50 $340.58 01.00x 0.0% N/A 5 $41,250$184,585 LEAPS-ONLY
IBIT
+75C
$36.26 750 00 $70.58 $49.07 01.00x 0.0% N/A 50 $22,328$181,300 LEAPS-ONLY
IGV
+70C −105C
$100.15 700 0105 $96.50 $88.12 01.00x 0.0% N/A 12 $31,800$120,180 LEAPS-ONLY
MARA (Main)
+40C
$11.87 400 00 $40.55 $15.54 01.00x 0.0% N/A 200 $11,000$237,300 LEAPS-ONLY
MSTR (Joint)
+180C −110C
$95.16 1800 0110 $233.00 $156.09 01.00x 0.0% N/A 10 $53,000$95,160 LEAPS-ONLY
SPY
+640C
$762.18 6400 00 $764.00 $697.38 01.00x 0.0% N/A 12 $148,800$914,616 LEAPS-ONLY
BMNR (Joint)
+23C −65P +25P −19C
$17.93 2365 2519 $30.29 $8.96 400.00x -39.5% ITM 150 $0$268,875 OK
BMNR (Main)
+25C −45P +15P −19C
$17.93 2545 1519 $44.46 $52.25 302.59x 16.3% SAFE 50 $94,550$89,625 OK
BMNR (Main)
+23C −65P +25P −19C
$17.93 2365 2519 $39.13 $8.96 400.00x -39.5% ITM 75 $0$134,438 OK
BMNR (RetireInc)
+10C −18P +10P −19C
$17.93 1018 1019 $17.13 $19.48 82.28x 44.2% SAFE 50 $31,250$89,625 OK
CLSK
+17C −17P +10P
$14.76 1717 100 $20.74 $17.16 72.87x 32.2% SAFE 25 $9,350$36,900 OK
COIN (Main)
+165C −240P +85P −160C
$149.77 165240 85160 $210.90 $218.39 15510.23x 43.2% SAFE 8 $13,440$119,816 OK
COIN (Main)
+500C −330P +300P −160C
$149.77 500330 300160 $563.00 $340.56 301.48x -100.3% ITM 25 $157,500$374,425 OK
COPX
+65C −90P +68P −85C
$83.42 6590 6885 $93.40 $94.98 221.77x 18.5% SAFE 20 $56,800$166,840 OK
DELL
+340C −390P +150P −475C
$459.96 340390 150475 $398.00 $409.76 2405.14x 67.4% SAFE 3 $17,400$137,986 OK
ETHA
+13C −16P +10P
$14.14 1316 100 $17.33 $17.95 62.39x 29.3% SAFE 50 $21,650$70,700 OK
GLD
+320C −450P +330P −386C
$374.96 320450 330386 $456.00 $471.52 1201.88x 12.0% SAFE 10 $136,000$374,960 OK
GLXY
+38C −38P +18P
$22.39 3838 180 $39.71 $34.17 2010.05x 21.8% SAFE 125 $27,625$279,875 OK
GOOG (Neville)
+300C −345P +310P −355C
$369.17 300345 310355 $373.00 $338.78 351.48x 16.0% SAFE 15 $109,500$553,755 OK
GOOG (Neville)
+340C −405P +360P −355C
$369.17 340405 360355 $398.00 $375.59 451.88x 2.5% TIGHT 5 $25,500$184,585 OK
HIMS
+10C −20P +5P
$31.03 1020 50 $17.47 $19.54 154.04x 83.9% SAFE 15 $7,395$46,545 OK
INTC
+85C −100P +35P −108C
$97.95 85100 35108 $114.00 $118.27 653.24x 64.3% SAFE 5 $14,500$48,975 OK
IREN (Joint)
+25C −47P +35P
$41.06 2547 350 $44.00 $49.65 121.75x 14.8% SAFE 20 $32,000$82,120 OK
IREN (Main)
+25C −47P +35P
$41.06 2547 350 $44.00 $49.65 121.75x 14.8% SAFE 20 $32,000$82,120 OK
IREN (Neville)
+45C −65P +21P
$41.06 4565 210 $56.50 $58.62 4415.67x 48.9% SAFE 20 $6,000$82,120 OK
MARA (Joint)
+20C −17P +10P
$11.87 2017 100 $24.33 $19.51 72.62x 15.7% SAFE 50 $21,650$59,325 OK
MARA (Main)
+20C −25P +15P
$11.87 2025 150 $22.69 $18.47 1027.32x -26.4% ITM 200 $7,600$237,300 OK
MARA (Neville)
+25C −15P +13P
$11.87 2515 130 $26.40 $13.79 22.43x -9.6% ITM 250 $35,000$296,625 OK
META
+480C −650P +330P −610C
$584.80 480650 330610 $601.50 $607.26 3205.38x 43.6% SAFE 3 $21,900$175,440 OK
MU (Joint)
+670C −800P +420P −915C
$885.79 670800 420915 $792.36 $811.93 3804.31x 52.6% SAFE 1 $11,472$88,579 OK
MU (Neville)
+970C −1110P +370P −985C
$885.79 9701110 370985 $1220.00 $1251.02 7403.96x 58.2% SAFE 2 $50,000$177,158 OK
NOW
+80C −110P +90P −120C
$114.35 80110 90120 $108.93 $114.29 201.72x 21.3% SAFE 10 $27,850$114,350 OK
NVDA
+140C −175P +70P −215C
$211.33 140175 70215 $199.60 $203.36 1052.76x 66.9% SAFE 5 $29,800$105,665 OK
SPCX
+150C −195P +135P
$119.55 150195 1350 $186.00 $183.15 603.22x -12.9% ITM 5 $13,500$59,772 OK

UAMY: HP 8P Roll-Down · exp Nov 20 '26, 108d

Stock: $5.88 HP: ITM Current hedge: $21,968/yr SS: $12.45 (unchanged) Shares: 2,500 CC income: $11,603/yr IV: HIGH OTM floor: 8% Stress: 20% DD Payback gate: 12mo (1.0yr) 1 PASS
RECOMMENDED: Roll HP 8 → 5 (Nov 20, 108d) | Save $13,941/yr | Payback 5mo (0.45yr) hedge only, 3mo (0.24yr) w/income (gate: 12mo (1.0yr)) | HP moves to 15.0% OTM | RM 3.08x → 4.12x | Margin (TIMS): $203
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 5 Nov 20 108d 15.0% $0.95 $1.40 $3,500 $8,027 $8,027 $13,941 8 $6,250 5mo 3mo 4.12x PASS
POST-REPAIR SUSTAINABILITY CC chain Sep 04 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $10, B $0.05 $1,452/yr $8,027/yr DEFICIT $548/mo
CC at MID $7 0.6σ, B $0.25 $7,258/yr $8,027/yr DEFICIT $64/mo
AT 20% DRAWDOWN (stock $5.88 → $4.70, hedge $8,027/yr)
CC at SS vs stressed $1,452/yr $8,027/yr DEFICIT $548/mo
CC at MID vs stressed $7,258/yr $8,027/yr DEFICIT $64/mo
NOT SELF-FUNDING Requires ongoing capital even at MID
CC WRITING STRATEGY
NO SAFE CC STRATEGY at the current chain. Hedge bleeds even at MID strike. Either restructure (deeper-OTM HP, smaller position) or commit to ongoing capital subsidy.

NEM: HP 75P Maintenance Roll-Out · exp Sep 18 '26, 45d

Stock: $97.81 Current HP: 75P (45d, 23.3% OTM) Current hedge: $1,379/yr Current ML: $28,520 CC income: $14,130/yr Cost cap: 25% of CC = $3,533/yr IV: HIGH 1 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 75 → 75P (Oct 16 '26, 73d, 23.3% OTM) | Cost: $2,300/yr (16% of CC) | New ML: $28,520 = ML | Roll DEBIT $385 | Margin (TIMS): $1,740
PROTECTIVE PICK: same as CHEAPEST (no higher-strike candidate clears the cost cap).
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 75 CHEAP PROT Oct 16 73d 23.3% $0.32 $0.92 $2,300 16% $28,520 = D $385
POST-REPAIR SUSTAINABILITY CC chain Sep 04 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $120, B $2.21 $12,839/yr $2,300/yr SELF-FUNDING
CC at MID $106 0.6σ, B $0.70 $4,065/yr $2,300/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($120, bid $2.21). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

MSTR (RetireInc): HP 55P Maintenance Roll-Out · exp Sep 18 '26, 45d

Stock: $95.16 Current HP: 55P (45d, 42.2% OTM) Current hedge: $2,693/yr Current ML: $56,800 CC income: $29,636/yr Cost cap: 25% of CC = $7,409/yr IV: HIGH 7 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 55 → 55P (Oct 16 '26, 73d, 42.2% OTM) | Cost: $3,060/yr (10% of CC) | New ML: $56,800 = ML | Roll DEBIT $432 | Margin (TIMS): $5,215
PROTECTIVE PICK (lowest ML within cost cap): HP 55 → 70P (Oct 16 '26, 73d, 26.4% OTM) | Cost: $7,400/yr (25% of CC) | New ML: $50,800 ↓ $6,000 | Roll DEBIT $1,300 | Margin (TIMS): $4,275
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 55 CHEAP Oct 16 73d 42.2% $1.12 $1.53 $3,060 10% $56,800 = D $432
2 55 Nov 20 108d 42.2% $2.22 $2.69 $3,636 12% $56,800 = D $896
3 60 Oct 16 73d 36.9% $1.75 $2.05 $4,100 14% $54,800 -$2,000 D $640
4 60 Nov 20 108d 36.9% $3.05 $3.50 $4,731 16% $54,800 -$2,000 D $1,220
5 65 Oct 16 73d 31.7% $2.36 $2.76 $5,520 19% $52,800 -$4,000 D $924
6 65 Nov 20 108d 31.7% $4.00 $4.50 $6,083 21% $52,800 -$4,000 D $1,620
7 70 PROT Oct 16 73d 26.4% $3.20 $3.70 $7,400 25% $50,800 -$6,000 D $1,300
POST-REPAIR SUSTAINABILITY CC chain Sep 04 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $113, B $2.32 $10,777/yr $3,060/yr SELF-FUNDING
CC at MID $113 0.7σ, B $2.32 $10,777/yr $3,060/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($113, bid $2.32). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

COIN (RetireInc): HP 75P Maintenance Roll-Out · exp Sep 18 '26, 45d

Stock: $149.77 Current HP: 75P (45d, 49.9% OTM) Current hedge: $1,265/yr Current ML: $43,440 CC income: $27,676/yr Cost cap: 25% of CC = $6,919/yr IV: HIGH 14 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 75 → 75P (Oct 16 '26, 73d, 49.9% OTM) | Cost: $1,320/yr (5% of CC) | New ML: $43,440 = ML | Roll DEBIT $264 | Margin (TIMS): $4,775
PROTECTIVE PICK (lowest ML within cost cap): HP 75 → 110P (Oct 16 '26, 73d, 26.6% OTM) | Cost: $6,450/yr (23% of CC) | New ML: $32,940 ↓ $10,500 | Roll DEBIT $1,290 | Margin (TIMS): $4,412
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 75 CHEAP Oct 16 73d 49.9% $0.20 $0.88 $1,320 5% $43,440 = D $264
2 80 Oct 16 73d 46.6% $0.42 $1.09 $1,635 6% $41,940 -$1,500 D $327
3 80 Nov 20 108d 46.6% $1.34 $2.01 $2,038 7% $41,940 -$1,500 D $603
4 85 Oct 16 73d 43.2% $0.70 $1.36 $2,040 7% $40,440 -$3,000 D $408
5 85 Nov 20 108d 43.2% $1.81 $2.56 $2,596 9% $40,440 -$3,000 D $768
6 90 Oct 16 73d 39.9% $1.02 $1.75 $2,625 9% $38,940 -$4,500 D $525
7 90 Nov 20 108d 39.9% $2.37 $3.25 $3,295 12% $38,940 -$4,500 D $975
8 95 Oct 16 73d 36.6% $1.44 $2.27 $3,405 12% $37,440 -$6,000 D $681
9 95 Nov 20 108d 36.6% $2.90 $4.05 $4,106 15% $37,440 -$6,000 D $1,215
10 100 Oct 16 73d 33.2% $1.98 $2.81 $4,215 15% $35,940 -$7,500 D $843
11 100 Nov 20 108d 33.2% $4.00 $4.95 $5,019 18% $35,940 -$7,500 D $1,485
12 105 Oct 16 73d 29.9% $2.59 $3.40 $5,100 18% $34,440 -$9,000 D $1,020
13 110 PROT Oct 16 73d 26.6% $3.45 $4.30 $6,450 23% $32,940 -$10,500 D $1,290
POST-REPAIR SUSTAINABILITY CC chain Sep 04 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $190, B $1.86 $6,480/yr $1,320/yr SELF-FUNDING
CC at MID $175 0.6σ, B $2.60 $9,058/yr $1,320/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($190, bid $1.86). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

QCOM: HP 90P Maintenance Roll-Out · exp Sep 18 '26, 45d

Stock: $157.63 Current HP: 90P (45d, 42.9% OTM) Current hedge: $2,474/yr Current ML: $77,000 CC income: $32,366/yr Cost cap: 25% of CC = $8,091/yr IV: HIGH 13 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 90 → 90P (Oct 16 '26, 73d, 42.9% OTM) | Cost: $1,875/yr (6% of CC) | New ML: $77,000 = ML | Roll DEBIT $375 | Margin (TIMS): $2,788
PROTECTIVE PICK (lowest ML within cost cap): HP 90 → 120P (Oct 16 '26, 73d, 23.9% OTM) | Cost: $7,625/yr (24% of CC) | New ML: $62,000 ↓ $15,000 | Roll DEBIT $1,525 | Margin (TIMS): $2,824
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 90 CHEAP Oct 16 73d 42.9% $0.04 $0.75 $1,875 6% $77,000 = D $375
2 95 Oct 16 73d 39.7% $0.11 $0.82 $2,050 6% $74,500 -$2,500 D $410
3 90 Nov 20 108d 42.9% $0.55 $1.33 $2,247 7% $77,000 = D $665
4 100 Oct 16 73d 36.6% $0.60 $1.10 $2,750 8% $72,000 -$5,000 D $550
5 95 Nov 20 108d 39.7% $0.90 $1.63 $2,754 9% $74,500 -$2,500 D $815
6 100 Nov 20 108d 36.6% $1.59 $1.82 $3,075 10% $72,000 -$5,000 D $910
7 105 Oct 16 73d 33.4% $0.95 $1.45 $3,625 11% $69,500 -$7,500 D $725
8 105 Nov 20 108d 33.4% $1.70 $2.56 $4,326 13% $69,500 -$7,500 D $1,280
9 110 Oct 16 73d 30.2% $1.39 $1.91 $4,775 15% $67,000 -$10,000 D $955
10 110 Nov 20 108d 30.2% $2.60 $3.30 $5,576 17% $67,000 -$10,000 D $1,650
11 115 Oct 16 73d 27.0% $1.79 $2.43 $6,075 19% $64,500 -$12,500 D $1,215
12 115 Nov 20 108d 27.0% $3.25 $4.15 $7,013 22% $64,500 -$12,500 D $2,075
13 120 PROT Oct 16 73d 23.9% $2.50 $3.05 $7,625 24% $62,000 -$15,000 D $1,525
POST-REPAIR SUSTAINABILITY CC chain Sep 04 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $220, B $0.05 $290/yr $1,875/yr DEFICIT $132/mo
CC at MID $180 0.7σ, B $3.20 $18,581/yr $1,875/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at MID ($180, bid $3.20). Self-funds in BOTH normal and 0% drawdown. At SS the position bleeds, so don't drift too far OTM.

APP: HP 185P Maintenance Roll-Out · exp Sep 18 '26, 45d

Stock: $414.81 Current HP: 185P (45d, 55.4% OTM) Current hedge: $649/yr Current ML: $48,300 CC income: $44,648/yr Cost cap: 25% of CC = $11,162/yr IV: HIGH 17 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 185 → 185P (Nov 20 '26, 108d, 55.4% OTM) | Cost: $1,115/yr (2% of CC) | New ML: $48,300 = ML | Roll DEBIT $320 | Margin (TIMS): $11,606
PROTECTIVE PICK (lowest ML within cost cap): HP 185 → 330P (Nov 20 '26, 108d, 20.4% OTM) | Cost: $11,018/yr (25% of CC) | New ML: $33,800 ↓ $14,500 | Roll DEBIT $3,250 | Margin (TIMS): $10,521
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 185 CHEAP Nov 20 108d 55.4% $1.80 $3.30 $1,115 2% $48,300 = D $320
2 195 Nov 20 108d 53.0% $1.85 $3.80 $1,284 3% $47,300 -$1,000 D $370
3 190 Nov 20 108d 54.2% $2.25 $5.00 $1,690 4% $47,800 -$500 D $490
4 200 Nov 20 108d 51.8% $2.60 $5.30 $1,791 4% $46,800 -$1,500 D $520
5 220 Nov 20 108d 47.0% $3.50 $6.20 $2,095 5% $44,800 -$3,500 D $610
6 210 Nov 20 108d 49.4% $3.00 $7.00 $2,366 5% $45,800 -$2,500 D $690
7 240 Nov 20 108d 42.1% $5.70 $8.80 $2,974 7% $42,800 -$5,500 D $870
8 230 Nov 20 108d 44.6% $4.70 $9.70 $3,278 7% $43,800 -$4,500 D $960
9 260 Nov 20 108d 37.3% $8.80 $12.20 $4,123 9% $40,800 -$7,500 D $1,210
10 250 Nov 20 108d 39.7% $7.10 $12.80 $4,326 10% $41,800 -$6,500 D $1,270
11 270 Nov 20 108d 34.9% $11.50 $14.70 $4,968 11% $39,800 -$8,500 D $1,460
12 280 Nov 20 108d 32.5% $13.60 $17.10 $5,779 13% $38,800 -$9,500 D $1,700
13 330 PROT Nov 20 108d 20.4% $27.60 $32.60 $11,018 25% $33,800 -$14,500 D $3,250
POST-REPAIR SUSTAINABILITY CC chain Sep 04 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $505, B $12.40 $14,400/yr $1,115/yr SELF-FUNDING
CC at MID $490 0.6σ, B $14.80 $17,187/yr $1,115/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($505, bid $12.40). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

RKLB: HP 45P Maintenance Roll-Out · exp Sep 18 '26, 45d

Stock: $74.09 Current HP: 45P (45d, 39.3% OTM) Current hedge: $4,672/yr Current ML: $69,930 CC income: $53,943/yr Cost cap: 25% of CC = $13,486/yr IV: HIGH 3 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 45 → 45P (Oct 16 '26, 73d, 39.3% OTM) | Cost: $5,850/yr (11% of CC) | New ML: $69,930 = ML | Roll DEBIT $696 | Margin (TIMS): $2,820
PROTECTIVE PICK (lowest ML within cost cap): HP 45 → 55P (Oct 16 '26, 73d, 25.8% OTM) | Cost: $13,200/yr (24% of CC) | New ML: $63,930 ↓ $6,000 | Roll DEBIT $2,166 | Margin (TIMS): $2,527
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 45 CHEAP Oct 16 73d 39.3% $1.60 $1.95 $5,850 11% $69,930 = D $696
2 50 Oct 16 73d 32.5% $2.46 $2.97 $8,910 17% $66,930 -$3,000 D $1,308
3 55 PROT Oct 16 73d 25.8% $3.80 $4.40 $13,200 24% $63,930 -$6,000 D $2,166
POST-REPAIR SUSTAINABILITY CC chain Sep 04 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $105, B $1.19 $8,292/yr $5,850/yr SELF-FUNDING
CC at MID $90 0.7σ, B $3.30 $22,994/yr $5,850/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($105, bid $1.19). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

IREN (RetireInc): HP 23P Maintenance Roll-Out · exp Sep 18 '26, 45d

Stock: $41.06 Current HP: 23P (45d, 44.0% OTM) Current hedge: $15,249/yr Current ML: $107,700 CC income: $118,220/yr Cost cap: 25% of CC = $29,555/yr IV: HIGH 12 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 23 → 23P (Oct 16 '26, 73d, 44.0% OTM) | Cost: $16,100/yr (14% of CC) | New ML: $107,700 = ML | Roll DEBIT $1,920 | Margin (TIMS): $1,832
PROTECTIVE PICK (lowest ML within cost cap): HP 23 → 28P (Nov 20 '26, 108d, 31.8% OTM) | Cost: $27,713/yr (23% of CC) | New ML: $97,700 ↓ $10,000 | Roll DEBIT $6,900 | Margin (TIMS): $1,705
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 23 CHEAP Oct 16 73d 44.0% $1.18 $1.61 $16,100 14% $107,700 = D $1,920
2 23 Nov 20 108d 44.0% $1.87 $2.42 $16,357 14% $107,700 = D $3,540
3 24 Oct 16 73d 41.5% $1.40 $1.65 $16,500 14% $105,700 -$2,000 D $2,000
4 24 Nov 20 108d 41.5% $2.13 $2.72 $18,385 16% $105,700 -$2,000 D $4,140
5 25 Oct 16 73d 39.1% $1.60 $1.88 $18,800 16% $103,700 -$4,000 D $2,460
6 25 Nov 20 108d 39.1% $2.43 $3.05 $20,616 17% $103,700 -$4,000 D $4,800
7 26 Oct 16 73d 36.7% $1.83 $2.10 $21,000 18% $101,700 -$6,000 D $2,900
8 26 Nov 20 108d 36.7% $2.77 $3.40 $22,981 19% $101,700 -$6,000 D $5,500
9 27 Nov 20 108d 34.2% $2.99 $3.75 $25,347 21% $99,700 -$8,000 D $6,200
10 27 Oct 16 73d 34.2% $2.08 $2.65 $26,500 22% $99,700 -$8,000 D $4,000
11 28 PROT Nov 20 108d 31.8% $3.35 $4.10 $27,713 23% $97,700 -$10,000 D $6,900
12 28 Oct 16 73d 31.8% $2.29 $2.95 $29,500 25% $97,700 -$10,000 D $4,600
POST-REPAIR SUSTAINABILITY CC chain Sep 04 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $70, B $0.15 $3,484/yr $16,100/yr DEFICIT $1,051/mo
CC at MID $51 0.6σ, B $2.30 $53,419/yr $16,100/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at MID ($51, bid $2.30). Self-funds in BOTH normal and 0% drawdown. At SS the position bleeds, so don't drift too far OTM.

CRWV: HP 40P Maintenance Roll-Out · exp Sep 18 '26, 45d

Stock: $91.32 Current HP: 40P (45d, 56.2% OTM) Current hedge: $1,784/yr Current ML: $50,225 CC income: $70,635/yr Cost cap: 25% of CC = $17,659/yr IV: HIGH 19 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 40 → 40P (Oct 16 '26, 73d, 56.2% OTM) | Cost: $1,800/yr (3% of CC) | New ML: $50,225 = ML | Roll DEBIT $250 | Margin (TIMS): $2,703
PROTECTIVE PICK (lowest ML within cost cap): HP 40 → 70P (Nov 20 '26, 108d, 23.3% OTM) | Cost: $15,546/yr (22% of CC) | New ML: $35,225 ↓ $15,000 | Roll DEBIT $4,490 | Margin (TIMS): $2,509
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 40 CHEAP Oct 16 73d 56.2% $0.49 $0.72 $1,800 3% $50,225 = D $250
2 40 Nov 20 108d 56.2% $1.10 $1.49 $2,518 4% $50,225 = D $635
3 42 Oct 16 73d 53.5% $0.66 $1.15 $2,875 4% $48,975 -$1,250 D $465
4 45 Oct 16 73d 50.7% $0.88 $1.20 $3,000 4% $47,725 -$2,500 D $490
5 42 Nov 20 108d 53.5% $1.40 $1.99 $3,363 5% $48,975 -$1,250 D $885
6 48 Oct 16 73d 48.0% $1.16 $1.41 $3,525 5% $46,475 -$3,750 D $595
7 45 Nov 20 108d 50.7% $1.78 $2.40 $4,056 6% $47,725 -$2,500 D $1,090
8 50 Oct 16 73d 45.2% $1.47 $1.73 $4,325 6% $45,225 -$5,000 D $755
9 48 Nov 20 108d 48.0% $2.14 $2.61 $4,410 6% $46,475 -$3,750 D $1,195
10 50 Nov 20 108d 45.2% $2.64 $3.40 $5,745 8% $45,225 -$5,000 D $1,590
11 55 Oct 16 73d 39.8% $2.23 $2.60 $6,500 9% $42,725 -$7,500 D $1,190
12 55 Nov 20 108d 39.8% $3.75 $4.60 $7,773 11% $42,725 -$7,500 D $2,190
13 70 PROT Nov 20 108d 23.3% $8.55 $9.20 $15,546 22% $35,225 -$15,000 D $4,490
POST-REPAIR SUSTAINABILITY CC chain Sep 04 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $125, B $2.84 $16,490/yr $1,800/yr SELF-FUNDING
CC at MID $110 0.6σ, B $5.35 $31,065/yr $1,800/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($125, bid $2.84). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

MDB: HP 150P Maintenance Roll-Out · exp Sep 18 '26, 45d

Stock: $372.06 Current HP: 150P (45d, 59.7% OTM) Current hedge: $2,320/yr Current ML: $28,290 CC income: $30,221/yr Cost cap: 25% of CC = $7,555/yr IV: HIGH 17 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 150 → 150P (Nov 20 '26, 108d, 59.7% OTM) | Cost: $1,004/yr (3% of CC) | New ML: $28,290 = ML | Roll DEBIT $297 | Margin (TIMS): $7,775
PROTECTIVE PICK (lowest ML within cost cap): HP 150 → 270P (Nov 20 '26, 108d, 27.4% OTM) | Cost: $6,725/yr (22% of CC) | New ML: $16,290 ↓ $12,000 | Roll DEBIT $1,990 | Margin (TIMS): $5,707
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 150 CHEAP Nov 20 108d 59.7% $0.73 $2.97 $1,004 3% $28,290 = D $297
2 155 Nov 20 108d 58.3% $0.94 $3.25 $1,098 4% $27,790 -$500 D $325
3 160 Nov 20 108d 57.0% $1.00 $3.55 $1,200 4% $27,290 -$1,000 D $355
4 165 Nov 20 108d 55.7% $1.46 $3.70 $1,250 4% $26,790 -$1,500 D $370
5 170 Nov 20 108d 54.3% $1.71 $4.00 $1,352 4% $26,290 -$2,000 D $400
6 180 Nov 20 108d 51.6% $2.07 $4.75 $1,605 5% $25,290 -$3,000 D $475
7 185 Nov 20 108d 50.3% $2.39 $5.20 $1,757 6% $24,790 -$3,500 D $520
8 190 Nov 20 108d 48.9% $2.94 $5.65 $1,909 6% $24,290 -$4,000 D $565
9 195 Nov 20 108d 47.6% $3.20 $6.15 $2,078 7% $23,790 -$4,500 D $615
10 200 Nov 20 108d 46.2% $3.60 $6.70 $2,264 7% $23,290 -$5,000 D $670
11 210 Nov 20 108d 43.6% $4.45 $7.90 $2,670 9% $22,290 -$6,000 D $790
12 220 Nov 20 108d 40.9% $5.65 $9.25 $3,126 10% $21,290 -$7,000 D $925
13 270 PROT Nov 20 108d 27.4% $14.35 $19.90 $6,725 22% $16,290 -$12,000 D $1,990
POST-REPAIR SUSTAINABILITY CC chain Sep 04 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $385, B $28.90 $33,561/yr $1,004/yr SELF-FUNDING
CC at MID $450 0.7σ, B $10.10 $11,729/yr $1,004/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($385, bid $28.90). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

ENPH: HP 20P Maintenance Roll-Out · exp Sep 18 '26, 45d

Stock: $40.61 Current HP: 20P (45d, 50.8% OTM) Current hedge: $1,703/yr Current ML: $47,300 CC income: $31,025/yr Cost cap: 25% of CC = $7,756/yr IV: HIGH 6 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 20 → 20P (Oct 16 '26, 73d, 50.8% OTM) | Cost: $1,800/yr (6% of CC) | New ML: $47,300 = ML | Roll DEBIT $350 | Margin (TIMS): $1,291
PROTECTIVE PICK (lowest ML within cost cap): HP 20 → 25P (Oct 16 '26, 73d, 38.4% OTM) | Cost: $3,300/yr (11% of CC) | New ML: $42,300 ↓ $5,000 | Roll DEBIT $650 | Margin (TIMS): $1,284
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 20 CHEAP Oct 16 73d 50.8% $0.06 $0.36 $1,800 6% $47,300 = D $350
2 20 Nov 20 108d 50.8% $0.30 $0.61 $2,062 7% $47,300 = D $600
3 22 Oct 16 73d 44.6% $0.20 $0.59 $2,950 10% $44,800 -$2,500 D $580
4 22 Nov 20 108d 44.6% $0.54 $0.95 $3,211 10% $44,800 -$2,500 D $940
5 25 PROT Oct 16 73d 38.4% $0.42 $0.66 $3,300 11% $42,300 -$5,000 D $650
6 25 Nov 20 108d 38.4% $0.94 $1.39 $4,698 15% $42,300 -$5,000 D $1,380
POST-REPAIR SUSTAINABILITY CC chain Sep 04 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $55, B $0.01 $116/yr $1,800/yr DEFICIT $140/mo
CC at MID $48 0.7σ, B $0.05 $581/yr $1,800/yr DEFICIT $102/mo
NOT SELF-FUNDING Requires ongoing capital even at MID
CC WRITING STRATEGY
NO SAFE CC STRATEGY at the current chain. Hedge bleeds even at MID strike. Either restructure (deeper-OTM HP, smaller position) or commit to ongoing capital subsidy.

MU (Main): HP 320P Maintenance Roll-Out · exp Sep 18 '26, 45d

Stock: $885.79 Current HP: 320P (45d, 63.9% OTM) Current hedge: $4,096/yr Current ML: $419,300 CC income: $310,190/yr Cost cap: 25% of CC = $77,548/yr IV: HIGH 56 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 320 → 320P (Oct 16 '26, 73d, 63.9% OTM) | Cost: $5,900/yr (2% of CC) | New ML: $419,300 = ML | Roll DEBIT $855 | Margin (TIMS): $30,816
PROTECTIVE PICK (lowest ML within cost cap): HP 320 → 610P (Nov 20 '26, 108d, 31.1% OTM) | Cost: $74,859/yr (24% of CC) | New ML: $274,300 ↓ $145,000 | Roll DEBIT $21,825 | Margin (TIMS): $28,076
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 320 CHEAP Oct 16 73d 63.9% $1.80 $2.36 $5,900 2% $419,300 = D $855
2 330 Oct 16 73d 62.7% $2.00 $2.58 $6,450 2% $414,300 -$5,000 D $965
3 340 Oct 16 73d 61.6% $2.22 $2.82 $7,050 2% $409,300 -$10,000 D $1,085
4 320 Nov 20 108d 63.9% $3.00 $4.20 $7,097 2% $419,300 = D $1,775
5 330 Nov 20 108d 62.7% $3.50 $4.35 $7,351 2% $414,300 -$5,000 D $1,850
6 350 Oct 16 73d 60.5% $2.46 $3.10 $7,750 2% $404,300 -$15,000 D $1,225
7 360 Oct 16 73d 59.4% $2.64 $3.40 $8,500 3% $399,300 -$20,000 D $1,375
8 350 Nov 20 108d 60.5% $4.35 $5.55 $9,378 3% $404,300 -$15,000 D $2,450
9 370 Oct 16 73d 58.2% $3.35 $3.80 $9,500 3% $394,300 -$25,000 D $1,575
10 340 Nov 20 108d 61.6% $3.20 $6.00 $10,139 3% $409,300 -$10,000 D $2,675
11 380 Oct 16 73d 57.1% $3.35 $4.10 $10,250 3% $389,300 -$30,000 D $1,725
12 360 Nov 20 108d 59.4% $4.85 $6.10 $10,308 3% $399,300 -$20,000 D $2,725
13 610 PROT Nov 20 108d 31.1% $42.10 $44.30 $74,859 24% $274,300 -$145,000 D $21,825
POST-REPAIR SUSTAINABILITY CC chain Sep 04 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $965, B $59.55 $345,774/yr $5,900/yr SELF-FUNDING
CC at MID $965 0.2σ, B $59.55 $345,774/yr $5,900/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($965, bid $59.55). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

HP roll-downs do not change Safe Strike. SS = Max(LC+ND, (LC+SP+ND)/2). HP is not in the formula.

Monthly hedge cost prorated: (30/DTE) × (Ask × Shares). Payback = ML increase / Annual savings.

EST = ask price estimated as mid × 1.10 (10% safety buffer). Verify with live prices before executing.

Always prefer longest viable DTE for repair rolls (fewer rolls/yr = lower annual cost).