GENERATED2026-08-05 00:35
FORTRESS REPAIRHP Roll-Down Analysis
Payback gate: 12mo (1.0yr)
SS = Max(LC+ND, (LC+SP+ND)/2)
TOTAL HEDGE (CURRENT)
$22,744/yr
TOTAL HEDGE (REPAIRED)
$8,638/yr
ANNUAL SAVINGS
$14,106/yr
ROLL CREDITS
$3,835
ADDITIONAL MAX LOSS
$8,750
PORTFOLIO ACTION SUMMARY · 46 positions
1 · ROLL NOW2 · REPAIR PLAN6 · LEAPS-ONLY37 · OK
Click any ticker row below to jump to its analysis section.
What do these actions mean? (legend)
NO HEDGE — No HP leg at all — naked synthetic long, no catastrophic protection.
ROLL IMMEDIATELY — Healthy fortress, HP expires ≤14d — roll the hedge out NOW (theta cliff).
REPAIR NOW — Structurally bad (HP ITM/tight or costly) AND ≤14d — roll HP DOWN today.
REPAIR SOON — Structurally bad AND ≤35d — roll HP DOWN this week.
ROLL NOW — Healthy fortress, HP ≤45d — roll the hedge OUT (maintain/raise strike).
REPAIR PLAN — Structurally bad but >35d runway — plan the roll-down, no rush.
LEAPS-ONLY — CSV-declared SP=0/HP=0 — intentional LC-only structure, no hedge to roll.
OK — Healthy structure with ample HP runway — no action.
REPAIR = roll HP down to a cheaper OTM strike (structure is hurting). ROLL = roll HP out/up to a later expiry (structure is healthy, hedge just expiring).

Fortress Position Overview

FORTRESSSTOCKLCSPHPSC BE‑SS CC‑SS GAPRMHP OTM%STATUSCTRSICNOTIONALURGENCY
MDB →
+270C −340P +150P −410C
$374.94 270340 150410 $362.90 $381.91 1903.05x 60.0% SAFE 1 $9,290$37,494 ROLL NOW (44d)
NEM →
+88C −105P +75P −125C
$98.00 88105 75125 $114.54 $118.54 302.11x 23.5% SAFE 5 $13,520$49,000 REPAIR PLAN (72d)
UAMY →
+10C −12P +8P −7C
$6.07 1012 87 $12.45 $13.22 53.08x -23.7% ITM 25 $6,000$15,163 REPAIR PLAN (107d)
GOOG (Joint)
+310C −355C
$373.86 3100 0355 $392.50 $340.79 01.00x 0.0% N/A 5 $41,250$186,930 LEAPS-ONLY
IBIT
+75C
$36.24 750 00 $70.58 $49.04 01.00x 0.0% N/A 50 $22,328$181,225 LEAPS-ONLY
IGV
+70C −105C
$101.42 700 0105 $96.50 $86.84 01.00x 0.0% N/A 12 $31,800$121,710 LEAPS-ONLY
MARA (Main)
+40C
$11.68 400 00 $40.55 $15.51 01.00x 0.0% N/A 200 $11,000$233,600 LEAPS-ONLY
MSTR (Joint)
+180C −110C
$95.83 1800 0110 $233.00 $156.51 01.00x 0.0% N/A 10 $53,000$95,835 LEAPS-ONLY
SPY
+640C
$769.42 6400 00 $764.00 $696.19 01.00x 0.0% N/A 12 $148,800$923,310 LEAPS-ONLY
APP
+460C −540P +185P
$417.30 460540 1850 $588.00 $610.57 3553.77x 55.7% SAFE 1 $12,800$41,730 OK
BMNR (Joint)
+23C −65P +25P −19C
$17.66 2365 2519 $30.29 $8.83 400.00x -41.6% ITM 150 $0$264,825 OK
BMNR (Main)
+25C −45P +15P −19C
$17.66 2545 1519 $44.46 $52.25 302.59x 15.0% SAFE 50 $94,550$88,275 OK
BMNR (Main)
+23C −65P +25P −19C
$17.66 2365 2519 $39.13 $8.83 400.00x -41.6% ITM 75 $0$132,412 OK
BMNR (RetireInc)
+10C −18P +10P −19C
$17.66 1018 1019 $17.13 $19.25 82.28x 43.4% SAFE 50 $31,250$88,275 OK
CLSK
+17C −17P +10P
$14.41 1717 100 $20.74 $17.32 72.87x 30.6% SAFE 25 $9,350$36,036 OK
COIN (Main)
+165C −240P +85P −160C
$150.55 165240 85160 $210.90 $218.79 15510.23x 43.5% SAFE 8 $13,440$120,440 OK
COIN (Main)
+500C −330P +300P −160C
$150.55 500330 300160 $563.00 $341.43 301.48x -99.3% ITM 25 $157,500$376,375 OK
COIN (RetireInc)
+145C −200P +75P −160C
$150.55 145200 75160 $182.40 $188.62 1257.31x 50.2% SAFE 3 $5,940$45,165 OK
COPX
+65C −90P +68P −100C
$83.75 6590 68100 $93.40 $94.36 221.77x 18.8% SAFE 20 $56,800$167,490 OK
CRWV
+105C −120P +40P
$92.00 105120 400 $125.45 $128.58 804.91x 56.5% SAFE 5 $10,225$46,000 OK
DELL
+340C −390P +150P −540C
$471.11 340390 150540 $398.00 $408.46 2405.14x 68.2% SAFE 3 $17,400$141,333 OK
ENPH
+45C −60P +20P
$40.88 4560 200 $56.15 $58.65 406.48x 51.1% SAFE 10 $7,300$40,880 OK
ETHA
+13C −16P +10P
$14.11 1316 100 $17.33 $17.90 62.39x 29.1% SAFE 50 $21,650$70,525 OK
GLD
+320C −450P +330P −386C
$374.96 320450 330386 $456.00 $471.13 1201.88x 12.0% SAFE 10 $136,000$374,960 OK
GLXY
+38C −38P +18P
$22.29 3838 180 $39.71 $34.41 2010.05x 21.5% SAFE 125 $27,625$278,625 OK
GOOG (Neville)
+300C −345P +310P −355C
$373.86 300345 310355 $373.00 $340.21 351.48x 17.1% SAFE 15 $109,500$560,790 OK
GOOG (Neville)
+340C −405P +360P −355C
$373.86 340405 360355 $398.00 $376.90 451.88x 3.7% TIGHT 5 $25,500$186,930 OK
HIMS
+10C −20P +5P
$31.54 1020 50 $17.47 $19.06 154.04x 84.1% SAFE 15 $7,395$47,310 OK
INTC
+85C −100P +35P −108C
$100.22 85100 35108 $114.00 $117.16 653.24x 65.1% SAFE 5 $14,500$50,112 OK
IREN (Joint)
+25C −47P +35P
$41.13 2547 350 $44.00 $49.41 121.75x 14.9% SAFE 20 $32,000$82,260 OK
IREN (Main)
+25C −47P +35P
$41.13 2547 350 $44.00 $49.41 121.75x 14.9% SAFE 20 $32,000$82,260 OK
IREN (Neville)
+45C −65P +21P
$41.13 4565 210 $56.50 $58.50 4415.67x 48.9% SAFE 20 $6,000$82,260 OK
IREN (RetireInc)
+50C −70P +23P
$41.13 5070 230 $63.43 $67.10 477.86x 44.1% SAFE 20 $13,700$82,260 OK
MARA (Joint)
+20C −17P +10P
$11.68 2017 100 $24.33 $19.47 72.62x 14.4% SAFE 50 $21,650$58,400 OK
MARA (Main)
+20C −25P +15P
$11.68 2025 150 $22.69 $18.32 1027.32x -28.4% ITM 200 $7,600$233,600 OK
MARA (Neville)
+25C −15P +13P
$11.68 2515 130 $26.40 $13.76 22.43x -11.3% ITM 250 $35,000$292,000 OK
META
+480C −650P +330P −610C
$581.66 480650 330610 $601.50 $606.75 3205.38x 43.3% SAFE 3 $21,900$174,498 OK
MSTR (RetireInc)
+125C −185P +55P −110C
$95.83 125185 55110 $161.00 $167.90 13011.83x 42.6% SAFE 4 $4,800$38,334 OK
MU (Joint)
+670C −800P +420P −1200C
$895.36 670800 4201200 $792.36 $813.24 3804.31x 53.1% SAFE 1 $11,472$89,536 OK
MU (Main)
+880C −1010P +320P −1000C
$895.36 8801010 3201000 $1028.60 $1057.71 6905.64x 64.3% SAFE 5 $74,300$447,680 OK
MU (Neville)
+970C −1110P +370P −985C
$895.36 9701110 370985 $1220.00 $1247.93 7403.96x 58.7% SAFE 2 $50,000$179,072 OK
NOW
+80C −110P +90P −120C
$115.76 80110 90120 $108.93 $114.55 201.72x 22.3% SAFE 10 $27,850$115,760 OK
NVDA
+140C −175P +70P −215C
$210.18 140175 70215 $199.60 $202.53 1052.76x 66.7% SAFE 5 $29,800$105,088 OK
QCOM
+190C −210P +90P −230C
$162.34 190210 90230 $224.00 $228.66 1204.53x 44.6% SAFE 5 $17,000$81,170 OK
RKLB
+115C −135P +45P
$74.44 115135 450 $141.55 $149.15 904.39x 39.5% SAFE 6 $15,930$44,661 OK
SPCX
+150C −195P +135P
$121.14 150195 1350 $186.00 $183.69 603.22x -11.4% ITM 5 $13,500$60,570 OK

NEM: HP 75P Roll-Down · exp Oct 16 '26, 72d

Stock: $98.00 HP: 23.5% OTM Current hedge: $1,850/yr SS: $114.54 (unchanged) Account: Main (...1299) Contracts: 5 (500 sh) CC income: $14,250/yr IV: MEDIUM OTM floor: 10% Stress: 15% DD Payback gate: 12mo (1.0yr) 1 PASS
RECOMMENDED: Roll HP 75 → 70 (Oct 16, 72d) | Save $887/yr | Payback 34mo (2.82yr) hedge only, 2mo (0.17yr) w/income (gate: 12mo (1.0yr)) | HP moves to 28.6% OTM | RM 2.11x → 2.29x | Margin (TIMS): $1,766
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 70 Oct 16 72d 28.6% $0.38 $0.17 $85 $963 $8,491 $887 35 $2,500 34mo 2mo 2.29x PASS
POST-REPAIR SUSTAINABILITY CC chain Sep 04 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $120, B $0.33 $1,980/yr $963/yr SELF-FUNDING
CC at MID $106 0.6σ, B $0.48 $2,880/yr $963/yr SELF-FUNDING
AT 15% DRAWDOWN (stock $98.00 → $83.30, hedge $8,491/yr)
CC at SS vs stressed $1,980/yr $8,491/yr DEFICIT $543/mo
CC at MID vs stressed $2,880/yr $8,491/yr DEFICIT $468/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($106, bid $0.48) in NORMAL markets. Self-funds today.
In 15% drawdown, even MID is short ~$468/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.

UAMY: HP 8P Roll-Down · exp Nov 20 '26, 107d

Stock: $6.07 HP: ITM Current hedge: $20,894/yr SS: $12.45 (unchanged) Account: RetireInc (...7291) Contracts: 25 (2,500 sh) CC income: $11,604/yr IV: HIGH OTM floor: 8% Stress: 20% DD Payback gate: 12mo (1.0yr) 1 PASS
RECOMMENDED: Roll HP 8 → 5 (Nov 20, 107d) | Save $13,218/yr | Payback 6mo (0.47yr) hedge only, 3mo (0.25yr) w/income (gate: 12mo (1.0yr)) | HP moves to 17.6% OTM | RM 3.08x → 4.12x | Margin (TIMS): $216
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 5 Nov 20 107d 17.6% $0.90 $1.50 $3,750 $7,675 $7,675 $13,218 8 $6,250 6mo 3mo 4.12x PASS
POST-REPAIR SUSTAINABILITY CC chain Sep 04 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $10, B $0.05 $1,500/yr $7,675/yr DEFICIT $515/mo
CC at MID $8 0.7σ, B $0.20 $6,000/yr $7,675/yr DEFICIT $140/mo
AT 20% DRAWDOWN (stock $6.07 → $4.85, hedge $7,675/yr)
CC at SS vs stressed $1,500/yr $7,675/yr DEFICIT $515/mo
CC at MID vs stressed $6,000/yr $7,675/yr DEFICIT $140/mo
NOT SELF-FUNDING Requires ongoing capital even at MID
CC WRITING STRATEGY
NO SAFE CC STRATEGY at the current chain. Hedge bleeds even at MID strike. Either restructure (deeper-OTM HP, smaller position) or commit to ongoing capital subsidy.

MDB: HP 150P Maintenance Roll-Out · exp Sep 18 '26, 44d

Stock: $374.94 Current HP: 150P (44d, 60.0% OTM) Current hedge: $2,738/yr Current ML: $28,290 Account: Neville (...0865) Contracts: 1 (100 sh) CC income: $35,955/yr Cost cap: 25% of CC = $8,989/yr IV: HIGH 17 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 150 → 160P (Nov 20 '26, 107d, 57.3% OTM) | Cost: $744/yr (2% of CC) | New ML: $27,290 ↓ $1,000 | Roll DEBIT $218 | Margin (TIMS): $7,681
PROTECTIVE PICK (lowest ML within cost cap): HP 150 → 300P (Nov 20 '26, 107d, 20.0% OTM) | Cost: $8,323/yr (23% of CC) | New ML: $13,290 ↓ $15,000 | Roll DEBIT $2,440 | Margin (TIMS): $5,403
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 160 CHEAP Nov 20 107d 57.3% $0.01 $2.18 $744 2% $27,290 -$1,000 D $218
2 165 Nov 20 107d 56.0% $1.46 $3.30 $1,126 3% $26,790 -$1,500 D $330
3 170 Nov 20 107d 54.7% $1.51 $3.95 $1,347 4% $26,290 -$2,000 D $395
4 180 Nov 20 107d 52.0% $1.07 $4.95 $1,689 5% $25,290 -$3,000 D $495
5 190 Nov 20 107d 49.3% $2.54 $5.85 $1,996 6% $24,290 -$4,000 D $585
6 195 Nov 20 107d 48.0% $3.00 $6.35 $2,166 6% $23,790 -$4,500 D $635
7 200 Nov 20 107d 46.7% $3.20 $6.90 $2,354 7% $23,290 -$5,000 D $690
8 220 Nov 20 107d 41.3% $5.65 $7.80 $2,661 7% $21,290 -$7,000 D $780
9 210 Nov 20 107d 44.0% $1.92 $8.00 $2,729 8% $22,290 -$6,000 D $800
10 230 Nov 20 107d 38.7% $4.20 $10.85 $3,701 10% $20,290 -$8,000 D $1,085
11 240 Nov 20 107d 36.0% $8.15 $12.60 $4,298 12% $19,290 -$9,000 D $1,260
12 250 Nov 20 107d 33.3% $8.30 $14.50 $4,946 14% $18,290 -$10,000 D $1,450
13 300 PROT Nov 20 107d 20.0% $23.45 $24.40 $8,323 23% $13,290 -$15,000 D $2,440
POST-REPAIR SUSTAINABILITY CC chain Sep 04 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $385, B $29.40 $35,280/yr $744/yr SELF-FUNDING
CC at MID $450 0.7σ, B $11.50 $13,800/yr $744/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($385, bid $29.40). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

HP roll-downs do not change Safe Strike. SS = Max(LC+ND, (LC+SP+ND)/2). HP is not in the formula.

Monthly hedge cost prorated: (30/DTE) × (Ask × Shares). Payback = ML increase / Annual savings.

EST = ask price estimated as mid × 1.10 (10% safety buffer). Verify with live prices before executing.

Always prefer longest viable DTE for repair rolls (fewer rolls/yr = lower annual cost).