GENERATED2026-09-15 21:54
FORTRESS REPAIRHP Roll-Down Analysis
Payback gate: 12mo (1.0yr)
SS = Max(LC+ND, (LC+SP+ND)/2)
TOTAL HEDGE (CURRENT)
$53,219/yr
TOTAL HEDGE (REPAIRED)
$41,626/yr
ANNUAL SAVINGS
$11,594/yr
ROLL CREDITS
-$6,400
ADDITIONAL MAX LOSS
$12,000
PORTFOLIO ACTION SUMMARY · 42 positions
2 · REPAIR SOON1 · ROLL NOW7 · LEAPS-ONLY32 · OK
Click any ticker row below to jump to its analysis section.
What do these actions mean? (legend)
NO HEDGE — No HP leg at all — naked synthetic long, no catastrophic protection.
ROLL IMMEDIATELY — Healthy fortress, HP expires ≤14d — roll the hedge out NOW (theta cliff).
REPAIR NOW — Structurally bad (HP ITM/tight or costly) AND ≤14d — roll HP DOWN today.
REPAIR SOON — Structurally bad AND ≤35d — roll HP DOWN this week.
ROLL NOW — Healthy fortress, HP ≤45d — roll the hedge OUT (maintain/raise strike).
REPAIR PLAN — Structurally bad but >35d runway — plan the roll-down, no rush.
LEAPS-ONLY — CSV-declared SP=0/HP=0 — intentional LC-only structure, no hedge to roll.
OK — Healthy structure with ample HP runway — no action.
REPAIR = roll HP down to a cheaper OTM strike (structure is hurting). ROLL = roll HP out/up to a later expiry (structure is healthy, hedge just expiring).

Fortress Position Overview

FORTRESSSTOCKLCSPHPSC BE‑SS CC‑SS GAPRMHP OTM%STATUSCTRSICNOTIONALURGENCY
Joint (...1782)8 fortress(es) · 4 actionable · IC $452,110 · notional $1,352,893
IREN (Joint) →
+25C −47P +35P −55C
$42.34 2547 3555 $44.00 $50.60 121.75x 17.3% SAFE 20 $32,000$84,680 REPAIR SOON (31d)
GOOG (Joint)
+310C −355C
$342.26 3100 0355 $392.50 $348.41 01.00x 0.0% N/A 5 $41,250$171,130 LEAPS-ONLY
IBIT
+75C
$43.08 750 00 $70.58 $49.71 01.00x 0.0% N/A 50 $22,328$215,400 LEAPS-ONLY
MSTR (Joint)
+180C −170C
$130.17 1800 0170 $233.00 $162.52 01.00x 0.0% N/A 10 $53,000$130,170 LEAPS-ONLY
AMZN
+200C −250P +215P
$252.59 200250 2150 $267.92 $270.30 351.52x 14.9% SAFE 5 $33,960$126,295 OK
BMNR (Joint)
+23C −18P +25P
$24.12 2318 250 $36.42 $23.30 01.00x -3.6% ITM 150 $201,300$361,800 OK
COPX
+65C −90P +68P
$84.97 6590 680 $93.40 $96.26 221.77x 20.0% SAFE 20 $56,800$169,940 OK
MU (Joint)
+670C −800P +420P −1250C
$934.78 670800 4201250 $792.36 $809.50 3804.31x 55.1% SAFE 1 $11,472$93,478 OK
Main (...1299)15 fortress(es) · 3 actionable · IC $1,182,360 · notional $3,392,528
IREN (Main) →
+25C −47P +35P −55C
$42.34 2547 3555 $44.00 $50.60 121.75x 17.3% SAFE 20 $32,000$84,680 REPAIR SOON (31d)
IGV
+70C −111C
$105.49 700 0111 $96.50 $87.84 01.00x 0.0% N/A 12 $31,800$126,588 LEAPS-ONLY
MARA (Main)
+13C
$11.26 130 00 $16.75 $10.78 01.00x 0.0% N/A 400 $150,000$450,400 LEAPS-ONLY
BMNR (Main)
+25C −18P +45P
$24.12 2518 450 $65.83 $57.97 01.00x -86.6% ITM 50 $204,150$120,600 OK
BMNR (Main)
+23C −18P +25P
$24.12 2318 250 $53.26 $46.02 01.00x -3.6% ITM 75 $226,950$180,900 OK
COIN (Main)
+165C −240P +90P −220C
$179.42 165240 90220 $210.90 $214.06 1509.93x 49.8% SAFE 8 $13,440$143,536 OK
COIN (Main)
+500C −330P +300P −220C
$179.42 500330 300220 $563.00 $354.16 301.48x -67.2% ITM 25 $157,500$448,550 OK
ETHA
+13C −16P +10P
$18.41 1316 100 $17.33 $17.60 62.39x 45.7% SAFE 50 $21,650$92,050 OK
GLD
+320C −450P +330P −470C
$393.80 320450 330470 $456.00 $470.69 1201.88x 16.2% SAFE 10 $136,000$393,800 OK
GLXY
+38C −38P +18P
$22.82 3838 180 $39.71 $34.67 2010.05x 23.3% SAFE 125 $27,625$285,250 OK
HIMS
+10C −20P +5P
$28.92 1020 50 $17.47 $18.96 154.04x 82.7% SAFE 15 $7,395$43,380 OK
META
+480C −650P +330P −665C
$669.68 480650 330665 $601.50 $602.24 3205.38x 50.7% SAFE 3 $21,900$200,904 OK
MU (Main)
+880C −1010P +340P −1210C
$934.78 8801010 3401210 $1028.60 $1047.23 6705.51x 63.6% SAFE 5 $74,300$467,390 OK
NOW
+80C −110P +90P −140C
$141.04 80110 90140 $108.93 $113.36 201.72x 36.2% SAFE 10 $27,850$141,040 OK
NVDA
+215C −225P +200P
$213.46 215225 2000 $264.80 $229.68 251.50x 6.3% OK 10 $49,800$213,460 OK
RetireInc (...7291)9 fortress(es) · 2 actionable · IC $150,280 · notional $1,103,728
DELL →
+340C −390P +150P −550C
$564.63 340390 150550 $398.00 $405.77 2405.14x 73.4% SAFE 3 $17,400$169,389 ROLL NOW (31d)
MARA (RetireInc)
+40C
$11.26 400 00 $41.04 $10.94 01.00x 0.0% N/A 500 $52,000$563,000 LEAPS-ONLY
APP
+460C −540P +185P
$331.54 460540 1850 $588.00 $606.72 3553.77x 44.2% SAFE 1 $12,800$33,154 OK
CLSK
+17C −17P +10P
$12.95 1717 100 $20.74 $18.18 72.87x 22.8% SAFE 25 $9,350$32,375 OK
ENPH
+45C −60P +20P
$36.32 4560 200 $56.15 $57.15 406.48x 44.9% SAFE 10 $7,300$36,320 OK
IREN (RetireInc)
+50C −70P +23P −55C
$42.34 5070 2355 $63.43 $66.62 477.86x 45.7% SAFE 20 $13,700$84,680 OK
MSTR (RetireInc)
+125C −185P +55P −170C
$130.17 125185 55170 $161.00 $164.60 13011.83x 57.7% SAFE 4 $4,800$52,068 OK
QCOM
+190C −210P +100P −220C
$188.60 190210 100220 $224.00 $228.38 1104.24x 47.0% SAFE 5 $17,000$94,300 OK
RKLB
+115C −135P +45P
$64.07 115135 450 $141.55 $148.30 904.39x 29.8% SAFE 6 $15,930$38,442 OK
Neville (...0865)10 fortress(es) · 1 actionable · IC $433,989 · notional $2,289,304
SPY
+640C
$759.55 6400 00 $764.00 $704.86 01.00x 0.0% N/A 12 $148,800$911,460 LEAPS-ONLY
AMD
+420C −490P +350P −580C
$509.87 420490 350580 $489.91 $501.09 1403.01x 31.4% SAFE 2 $13,964$101,974 OK
CRWV
+105C −120P +40P −125C
$83.44 105120 40125 $125.45 $128.70 804.91x 52.1% SAFE 5 $10,225$41,720 OK
GOOG (Neville)
+300C −345P +310P −355C
$342.26 300345 310355 $373.00 $344.67 351.48x 9.4% OK 15 $109,500$513,390 OK
GOOG (Neville)
+340C −405P +360P −355C
$342.26 340405 360355 $398.00 $382.73 451.88x -5.2% ITM 5 $25,500$171,130 OK
INTC
+85C −100P +35P −116C
$99.97 85100 35116 $114.00 $116.25 653.24x 65.0% SAFE 5 $14,500$49,988 OK
IREN (Neville)
+45C −65P +21P −55C
$42.34 4565 2155 $56.50 $58.21 4415.67x 50.4% SAFE 20 $6,000$84,680 OK
MU (Neville)
+970C −1110P +390P −1250C
$934.78 9701110 3901250 $1220.00 $1235.56 7203.88x 58.3% SAFE 2 $50,000$186,956 OK
SNDK
+1200C −1380P +810P −1950C
$1555.67 12001380 8101950 $1620.00 $1636.57 5702.36x 47.9% SAFE 1 $42,000$155,567 OK
SPCX
+150C −195P +135P
$144.88 150195 1350 $186.00 $189.57 603.22x 6.8% OK 5 $13,500$72,440 OK
Joint (...1782)8 fortress(es) · 4 actionable · overview rows

IREN (Joint): HP 35P Roll-Down · exp Oct 16 '26, 31d

Stock: $42.34 HP: 17.3% OTM Current hedge: $26,610/yr Baseline (roll-fwd, savings vs this): $29,122/yr SS: $44.00 (unchanged) Account: Joint (...1782) Contracts: 20 (2,000 sh) CC income: $82,111/yr IV: HIGH OTM floor: 8% Stress: 24% DD Payback gate: 12mo (1.0yr) 5 PASS ⚠ ER 2026-11-05 INTRADAY (51d) inside new HP tenor
RECOMMENDED: Roll HP 35 → 32 (Dec 18, 94d) | Save $8,310/yr | Payback 9mo (0.72yr) hedge only, 1mo (0.07yr) w/income (gate: 12mo (1.0yr)) | HP moves to 24.4% OTM | RM 1.75x → 1.94x | Margin (TIMS): $1,618
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 32 Dec 18 94d 24.4% $2.68 $-1.60 $-3,200 $20,813 $48,149 $8,310 15 $6,000 9mo 1mo 1.94x PASS
2 33 Dec 18 94d 22.1% $3.05 $-1.97 $-3,940 $23,686 $47,295 $5,436 14 $4,000 9mo 1mo 1.88x PASS
3 34 Dec 18 94d 19.7% $3.40 $-2.32 $-4,640 $26,404 $41,470 $2,718 13 $2,000 9mo 0mo 1.81x PASS
4 31 Dec 18 94d 26.8% $2.38 $-1.30 $-2,600 $18,483 $43,878 $10,639 16 $8,000 9mo 1mo 2.00x PASS
5 30 Dec 18 94d 29.1% $2.04 $-0.96 $-1,920 $15,843 $35,335 $13,280 17 $10,000 9mo 1mo 2.06x PASS
POST-REPAIR SUSTAINABILITY CC chain Oct 16 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $55, B $0.95 $22,065/yr $20,813/yr SELF-FUNDING
CC at MID $49 0.7σ, B $1.85 $42,968/yr $20,813/yr SELF-FUNDING
AT 24% DRAWDOWN (stock $42.34 → $32.22, hedge $48,149/yr)
CC at SS income stress-adjusted $12,774/yr $48,149/yr DEFICIT $2,948/mo
CC at MID income stress-adjusted $12,774/yr $48,149/yr DEFICIT $2,948/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($49, bid $1.85) in NORMAL markets. Self-funds today.
In 24% drawdown, even MID is short ~$2,948/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.
Main (...1299)15 fortress(es) · 3 actionable · overview rows

IREN (Main): HP 35P Roll-Down · exp Oct 16 '26, 31d

Stock: $42.34 HP: 17.3% OTM Current hedge: $26,610/yr Baseline (roll-fwd, savings vs this): $29,122/yr SS: $44.00 (unchanged) Account: Main (...1299) Contracts: 20 (2,000 sh) CC income: $82,111/yr IV: HIGH OTM floor: 8% Stress: 24% DD Payback gate: 12mo (1.0yr) 5 PASS ⚠ ER 2026-11-05 INTRADAY (51d) inside new HP tenor
RECOMMENDED: Roll HP 35 → 32 (Dec 18, 94d) | Save $8,310/yr | Payback 9mo (0.72yr) hedge only, 1mo (0.07yr) w/income (gate: 12mo (1.0yr)) | HP moves to 24.4% OTM | RM 1.75x → 1.94x | Margin (TIMS): $1,620
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 32 Dec 18 94d 24.4% $2.68 $-1.60 $-3,200 $20,813 $48,149 $8,310 15 $6,000 9mo 1mo 1.94x PASS
2 33 Dec 18 94d 22.1% $3.05 $-1.97 $-3,940 $23,686 $47,295 $5,436 14 $4,000 9mo 1mo 1.88x PASS
3 34 Dec 18 94d 19.7% $3.40 $-2.32 $-4,640 $26,404 $41,470 $2,718 13 $2,000 9mo 0mo 1.81x PASS
4 31 Dec 18 94d 26.8% $2.38 $-1.30 $-2,600 $18,483 $43,878 $10,639 16 $8,000 9mo 1mo 2.00x PASS
5 30 Dec 18 94d 29.1% $2.04 $-0.96 $-1,920 $15,843 $35,335 $13,280 17 $10,000 9mo 1mo 2.06x PASS
POST-REPAIR SUSTAINABILITY CC chain Oct 16 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $55, B $0.95 $22,065/yr $20,813/yr SELF-FUNDING
CC at MID $49 0.7σ, B $1.85 $42,968/yr $20,813/yr SELF-FUNDING
AT 24% DRAWDOWN (stock $42.34 → $32.22, hedge $48,149/yr)
CC at SS income stress-adjusted $12,774/yr $48,149/yr DEFICIT $2,948/mo
CC at MID income stress-adjusted $12,774/yr $48,149/yr DEFICIT $2,948/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($49, bid $1.85) in NORMAL markets. Self-funds today.
In 24% drawdown, even MID is short ~$2,948/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.
RetireInc (...7291)9 fortress(es) · 2 actionable · overview rows

DELL: HP 150P Maintenance Roll-Out · exp Oct 16 '26, 31d

Stock: $564.63 Current HP: 150P (31d, 73.4% OTM) Current hedge: $3,250/yr Current ML: $89,400 If HP lapses: ML $134,400 (+$45,000) Account: RetireInc (...7291) Contracts: 3 (300 sh) CC income: $892,980/yr Cost cap: 25% of CC = $223,245/yr IV: HIGH 69 qualifying ⚠ ER 2026-11-27 INTRADAY (73d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 150 → 150P (Dec 18 '26, 94d, 73.4% OTM) | Cost: $256/yr (0% of CC) | New ML: $89,400 = ML | Roll DEBIT $66 | Margin (TIMS): $37,776
PROTECTIVE PICK (lowest ML within cost cap): HP 150 → 390P (Nov 20 '26, 66d, 30.9% OTM) | Cost: $11,780/yr (1% of CC) | New ML: $17,400 ↓ $72,000 | Roll DEBIT $2,130 | Margin (TIMS): $20,463
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 150 CHEAP Dec 18 94d 73.4% $0.11 $0.22 $256 0% $89,400 = D $66
2 185 Nov 20 66d 67.2% $0.02 $0.18 $299 0% $78,900 -$10,500 D $54
3 195 Nov 20 66d 65.5% $0.03 $0.19 $315 0% $75,900 -$13,500 D $57
4 150 Nov 20 66d 73.4% $0.01 $0.20 $332 0% $89,400 = D $60
5 165 Dec 18 94d 70.8% $0.16 $0.30 $349 0% $84,900 -$4,500 D $90
6 200 Dec 18 94d 64.6% $0.20 $0.44 $513 0% $74,400 -$15,000 D $132
7 230 Nov 20 66d 59.3% $0.16 $0.31 $514 0% $65,400 -$24,000 D $93
8 185 Dec 18 94d 67.2% $0.20 $0.56 $652 0% $78,900 -$10,500 D $168
9 195 Dec 18 94d 65.5% $0.27 $0.60 $699 0% $75,900 -$13,500 D $180
10 220 Nov 20 66d 61.0% $0.06 $0.47 $780 0% $68,400 -$21,000 D $141
11 200 Nov 20 66d 64.6% $0.01 $0.58 $962 0% $74,400 -$15,000 D $174
12 210 Dec 18 94d 62.8% $0.06 $0.91 $1,060 0% $71,400 -$18,000 D $273
13 390 PROT Nov 20 66d 30.9% $5.80 $7.10 $11,780 1% $17,400 -$72,000 D $2,130
POST-REPAIR SUSTAINABILITY CC chain Oct 16 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $560, B $44.60 $155,381/yr $256/yr SELF-FUNDING
CC at MID $630 0.6σ, B $19.25 $67,065/yr $256/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($560, bid $44.60). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

HP roll-downs do not change Safe Strike. SS = Max(LC+ND, (LC+SP+ND)/2). HP is not in the formula.

Monthly hedge cost prorated: (30/DTE) × (Ask × Shares). Payback = ML increase / Annual savings.

EST = ask price estimated as mid × 1.10 (10% safety buffer). Verify with live prices before executing.

Always prefer longest viable DTE for repair rolls (fewer rolls/yr = lower annual cost).