GENERATED2026-09-26 03:51
FORTRESS REPAIRHP Roll-Down Analysis
Payback gate: 12mo (1.0yr)
SS = Max(LC+ND, (LC+SP+ND)/2)
TOTAL HEDGE (CURRENT)
$314,584/yr
TOTAL HEDGE (REPAIRED)
$61,431/yr
ANNUAL SAVINGS
$253,154/yr
ROLL CREDITS
$72,240
ADDITIONAL MAX LOSS
$-32,500
PORTFOLIO ACTION SUMMARY · 42 positions
2 · ROLL NOW2 · REPAIR PLAN7 · LEAPS-ONLY31 · OK
Click any ticker row below to jump to its analysis section.
What do these actions mean? (legend)
NO HEDGE — No HP leg at all — naked synthetic long, no catastrophic protection.
ROLL IMMEDIATELY — Healthy fortress, HP expires ≤14d — roll the hedge out NOW (theta cliff).
REPAIR NOW — Structurally bad (HP ITM/tight or costly) AND ≤14d — roll HP DOWN today.
REPAIR SOON — Structurally bad AND ≤35d — roll HP DOWN this week.
ROLL NOW — Healthy fortress, HP ≤45d — roll the hedge OUT (maintain/raise strike).
REPAIR PLAN — Structurally bad but >35d runway — plan the roll-down, no rush.
LEAPS-ONLY — CSV-declared SP=0/HP=0 — intentional LC-only structure, no hedge to roll.
OK — Healthy structure with ample HP runway — no action.
REPAIR = roll HP down to a cheaper OTM strike (structure is hurting). ROLL = roll HP out/up to a later expiry (structure is healthy, hedge just expiring).

Fortress Position Overview

FORTRESSSTOCKLCSPHPSC BE‑SS CC‑SS GAPRMHP OTM%STATUSCTRSICNOTIONALURGENCY
Joint (...1782)9 fortress(es) · 5 actionable · IC $502,060 · notional $1,596,551
IREN (Joint) →
+25C −47P +35P −55C
$43.97 2547 3555 $44.00 $50.42 121.75x 20.4% SAFE 20 $32,000$87,940 ROLL NOW (21d)
AMZN →
+200C −250P +215P −258C
$250.66 200250 215258 $267.92 $270.88 351.52x 14.2% SAFE 5 $33,960$125,330 REPAIR PLAN (56d)
GOOG (Joint)
+310C −355C
$341.37 3100 0355 $392.50 $347.64 01.00x 0.0% N/A 5 $41,250$170,685 LEAPS-ONLY
IBIT
+75C
$47.56 750 00 $70.58 $51.44 01.00x 0.0% N/A 50 $22,328$237,800 LEAPS-ONLY
MSTR (Joint)
+180C −170C
$159.26 1800 0170 $233.00 $167.85 01.00x 0.0% N/A 10 $53,000$159,260 LEAPS-ONLY
BMNR (Joint)
+23C −18P +25P
$27.61 2318 250 $36.42 $24.06 01.00x 9.5% OK 150 $201,300$414,150 OK
COPX
+65C −90P +68P −90C
$86.79 6590 6890 $93.40 $95.90 221.77x 21.6% SAFE 20 $56,800$173,580 OK
HOOD
+65C −95P +80P
$119.36 6595 800 $114.95 $118.76 151.30x 33.0% SAFE 10 $49,950$119,360 OK
MU (Joint)
+670C −800P +420P −1250C
$1084.46 670800 4201250 $792.36 $807.52 3804.31x 61.3% SAFE 1 $11,472$108,446 OK
Main (...1299)14 fortress(es) · 4 actionable · IC $1,208,360 · notional $3,488,753
IREN (Main) →
+25C −47P +35P −55C
$43.97 2547 3555 $44.00 $50.42 121.75x 20.4% SAFE 20 $32,000$87,940 ROLL NOW (21d)
BMNR (Main) →
+25C −18P +45P
$27.61 2518 450 $65.83 $59.04 01.00x -63.0% ITM 50 $204,150$138,050 REPAIR PLAN (112d)
IGV
+70C −111C
$106.12 700 0111 $96.50 $88.07 01.00x 0.0% N/A 12 $31,800$127,344 LEAPS-ONLY
MARA (Main)
+13C
$12.57 130 00 $16.75 $11.22 01.00x 0.0% N/A 400 $150,000$502,800 LEAPS-ONLY
BMNR (Main)
+23C −18P +25P
$27.61 2318 250 $53.26 $46.65 01.00x 9.5% OK 75 $226,950$207,075 OK
COIN (Main)
+165C −240P +90P −240C
$195.08 165240 90240 $210.90 $215.90 1509.93x 53.9% SAFE 8 $13,440$156,064 OK
COIN (Main)
+500C −330P +300P −240C
$195.08 500330 300240 $563.00 $369.56 301.48x -53.8% ITM 25 $157,500$487,700 OK
DELL
+310C −400P +320P −610C
$565.35 310400 320610 $562.50 $570.22 801.32x 43.4% SAFE 3 $75,750$169,605 OK
ETHA
+13C −16P +10P
$20.34 1316 100 $17.33 $17.66 62.39x 50.8% SAFE 50 $21,650$101,700 OK
GLD
+320C −450P +330P −430C
$393.59 320450 330430 $456.00 $468.59 1201.88x 16.2% SAFE 10 $136,000$393,590 OK
GLXY
+38C −38P +18P −30C
$24.45 3838 1830 $39.71 $34.90 2010.05x 28.4% SAFE 125 $27,625$305,625 OK
HIMS
+10C −20P +5P −32C
$29.44 1020 532 $17.47 $19.42 154.04x 83.0% SAFE 15 $7,395$44,160 OK
MU (Main)
+880C −1010P +340P −1350C
$1084.46 8801010 3401350 $1028.60 $1044.75 6705.51x 68.6% SAFE 5 $74,300$542,230 OK
NVDA
+215C −225P +200P −230C
$224.87 215225 200230 $264.80 $229.27 251.50x 11.1% SAFE 10 $49,800$224,870 OK
Neville (...0865)10 fortress(es) · 1 actionable · IC $441,025 · notional $2,316,117
SPY
+640C −782C
$772.08 6400 0782 $764.00 $702.10 01.00x 0.0% N/A 12 $148,800$926,496 LEAPS-ONLY
CRCL
+45C −65P +40P
$88.65 4565 400 $87.00 $89.66 251.60x 54.9% SAFE 5 $21,000$44,325 OK
CRWV
+105C −120P +40P −95C
$87.86 105120 4095 $125.45 $128.11 804.91x 54.5% SAFE 5 $10,225$43,930 OK
GOOG (Neville)
+300C −345P +310P −355C
$341.37 300345 310355 $373.00 $344.01 351.48x 9.2% OK 15 $109,500$512,055 OK
GOOG (Neville)
+340C −405P +360P −355C
$341.37 340405 360355 $398.00 $385.59 451.88x -5.5% ITM 5 $25,500$170,685 OK
INTC
+85C −100P +35P −160C
$123.49 85100 35160 $114.00 $115.96 653.24x 71.7% SAFE 5 $14,500$61,745 OK
IREN (Neville)
+45C −65P +21P
$43.97 4565 210 $56.50 $58.01 4415.67x 52.2% SAFE 20 $6,000$87,940 OK
MU (Neville)
+970C −1110P +390P −1250C
$1084.46 9701110 3901250 $1220.00 $1235.56 7203.88x 64.0% SAFE 2 $50,000$216,892 OK
SNDK
+1200C −1380P +810P −2200C
$1775.94 12001380 8102200 $1620.00 $1629.95 5702.36x 54.4% SAFE 1 $42,000$177,594 OK
SPCX
+150C −195P +135P −155C
$148.91 150195 135155 $186.00 $190.18 603.22x 9.3% OK 5 $13,500$74,455 OK
RetireInc (...7291)9 fortress(es) · 1 actionable · IC $180,200 · notional $1,195,072
MARA (RetireInc)
+40C
$12.57 400 00 $41.04 $11.59 01.00x 0.0% N/A 500 $52,000$628,500 LEAPS-ONLY
AAPL
+240C −330P +285P −342C
$341.55 240330 285342 $334.64 $336.72 451.48x 16.6% SAFE 5 $47,320$170,775 OK
APP
+460C −540P +185P −335C
$310.77 460540 185335 $588.00 $613.19 3553.77x 40.5% SAFE 1 $12,800$31,077 OK
CLSK
+17C −17P +10P
$13.94 1717 100 $20.74 $18.49 72.87x 28.2% SAFE 25 $9,350$34,838 OK
ENPH
+45C −60P +20P
$32.53 4560 200 $56.15 $58.80 406.48x 38.5% SAFE 10 $7,300$32,530 OK
IREN (RetireInc)
+50C −70P +23P
$43.97 5070 230 $63.43 $66.71 477.86x 47.7% SAFE 20 $13,700$87,940 OK
MSTR (RetireInc)
+125C −185P +55P −170C
$159.26 125185 55170 $161.00 $163.54 13011.83x 65.5% SAFE 4 $4,800$63,704 OK
QCOM
+190C −210P +100P −220C
$202.52 190210 100220 $224.00 $226.00 1104.24x 50.6% SAFE 5 $17,000$101,260 OK
RKLB
+115C −135P +45P −85C
$74.08 115135 4585 $141.55 $147.57 904.39x 39.3% SAFE 6 $15,930$44,448 OK
Joint (...1782)9 fortress(es) · 5 actionable · overview rows

AMZN: HP 215P Roll-Down · exp Nov 20 '26, 56d

RELAXED PASS — no candidate met the standard constraints. Widened gap-mult 2.0x → 8.0x; payback gate 1.0yr → 2.0yr to surface the best available option below. Treat as a guideline breach, not a clean repair.
Stock: $250.66 HP: 14.2% OTM Current hedge: $9,060/yr Baseline (roll-fwd, savings vs this): $8,229/yr SS: $267.92 (unchanged) Account: Joint (...1782) Contracts: 5 (500 sh) CC income: $19,987/yr IV: MEDIUM OTM floor: 10% Stress: 11% DD Payback gate: 12mo (1.0yr) 3 PASS ⚠ ER 2026-10-29 AMC (34d) inside new HP tenor
RECOMMENDED: Roll HP 215 → 210 (Jan 15, 112d) | Save $1,385/yr | Payback 22mo (1.80yr) hedge only, 1mo (0.12yr) w/income (gate: 12mo (1.0yr)) | HP moves to 16.2% OTM | RM 1.52x → 1.59x | Margin (TIMS): $4,348
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 210 Jan 15 112d 16.2% $4.20 $-1.52 $-760 $6,844 $14,991 $1,385 40 $2,500 22mo 1mo 1.59x PASS
2 205 Dec 18 84d 18.2% $2.57 $0.11 $55 $5,584 $16,403 $2,645 45 $5,000 23mo 3mo 1.66x PASS
3 205 Jan 15 112d 18.2% $3.45 $-0.77 $-385 $5,622 $12,302 $2,607 45 $5,000 23mo 3mo 1.66x PASS
4 180 Dec 18 84d 28.2% $0.83 $1.85 $925 $1,803 $5,584 $6,426 70 $17,500 33mo 8mo 2.03x FAIL
5 180 Jan 15 112d 28.2% $1.23 $1.45 $725 $2,004 $4,188 $6,225 70 $17,500 34mo 8mo 2.03x FAIL
6 185 Dec 18 84d 26.2% $1.06 $1.62 $810 $2,303 $7,170 $5,926 65 $15,000 30mo 7mo 1.96x FAIL
7 185 Jan 15 112d 26.2% $1.54 $1.14 $570 $2,509 $5,377 $5,719 65 $15,000 31mo 7mo 1.96x FAIL
8 190 Dec 18 84d 24.2% $1.39 $1.29 $645 $3,020 $8,799 $5,209 60 $12,500 29mo 6mo 1.88x FAIL
9 190 Jan 15 112d 24.2% $1.88 $0.80 $400 $3,063 $6,599 $5,165 60 $12,500 29mo 6mo 1.88x FAIL
10 195 Dec 18 84d 22.2% $1.72 $0.96 $480 $3,737 $10,754 $4,492 55 $10,000 27mo 5mo 1.81x FAIL
11 195 Jan 15 112d 22.2% $2.32 $0.36 $180 $3,780 $8,066 $4,448 55 $10,000 27mo 5mo 1.81x FAIL
12 200 Dec 18 84d 20.2% $2.08 $0.60 $300 $4,519 $13,362 $3,710 50 $7,500 24mo 4mo 1.74x FAIL
13 200 Jan 15 112d 20.2% $2.79 $-0.11 $-55 $4,546 $10,021 $3,683 50 $7,500 24mo 4mo 1.74x FAIL
14 210 Dec 18 84d 16.2% $3.30 $-0.62 $-310 $7,170 $19,988 $1,059 40 $2,500 28mo 1mo 1.59x FAIL
POST-REPAIR SUSTAINABILITY CC chain Oct 30 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $275, B $4.00 $20,571/yr $6,844/yr SELF-FUNDING
CC at MID $270 0.7σ, B $5.20 $26,743/yr $6,844/yr SELF-FUNDING
AT 11% DRAWDOWN (stock $250.66 → $222.37, hedge $14,991/yr)
CC at SS income stress-adjusted $2,983/yr $14,991/yr DEFICIT $1,001/mo
CC at MID income stress-adjusted $4,166/yr $14,991/yr DEFICIT $902/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($270, bid $5.20) in NORMAL markets. Self-funds today.
In 11% drawdown, even MID is short ~$902/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.

IREN (Joint): HP 35P Maintenance Roll-Out · exp Oct 16 '26, 21d

RELAXED PASS — no candidate met the standard constraints. Widened cost cap 25% → 50% of CC to surface the best available option below. Treat as a guideline breach, not a clean repair.
Stock: $43.97 Current HP: 35P (21d, 20.4% OTM) Current hedge: $12,514/yr Current ML: $56,000 If HP lapses: ML $126,000 (+$70,000) Account: Joint (...1782) Contracts: 20 (2,000 sh) CC income: $67,029/yr Cost cap: 50% of CC = $33,514/yr IV: HIGH 6 qualifying ⚠ ER 2026-11-05 INTRADAY (41d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 35 → 35P (Jan 15 '27, 112d, 20.4% OTM) | Cost: $22,161/yr (33% of CC) | New ML: $56,000 = ML | Roll DEBIT $6,160 | Margin (TIMS): $1,565
PROTECTIVE PICK (lowest ML within cost cap): HP 35 → 38P (Dec 18 '26, 84d, 13.6% OTM) | Cost: $33,024/yr (49% of CC) | New ML: $50,000 ↓ $6,000 | Roll DEBIT $6,960 | Margin (TIMS): $1,349
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 35 CHEAP Jan 15 112d 20.4% $3.20 $3.40 $22,161 33% $56,000 = D $6,160
2 35 Dec 18 84d 20.4% $2.28 $2.67 $23,204 35% $56,000 = D $4,700
3 36 Dec 18 84d 18.1% $2.87 $2.99 $25,985 39% $54,000 -$2,000 D $5,340
4 37 Jan 15 112d 15.9% $3.85 $4.25 $27,701 41% $52,000 -$4,000 D $7,860
5 37 Dec 18 84d 15.9% $3.20 $3.45 $29,982 45% $52,000 -$4,000 D $6,260
▶ 6 38 PROT Dec 18 84d 13.6% $3.55 $3.80 $33,024 49% $50,000 -$6,000 D $6,960
POST-REPAIR SUSTAINABILITY CC chain Oct 30 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $51, B $1.81 $37,234/yr $22,161/yr SELF-FUNDING
CC at MID $51 0.7σ, B $1.81 $37,234/yr $22,161/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($51, bid $1.81). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.
Main (...1299)14 fortress(es) · 4 actionable · overview rows

BMNR (Main): HP 45P Roll-Down · exp Jan 15 '27, 112d

Stock: $27.61 HP: ITM Current hedge: $305,525/yr Baseline: current hedge (no same-strike quote) SS: $65.83 (unchanged) Account: Main (...1299) Contracts: 50 (5,000 sh) CC income: $107,732/yr IV: HIGH OTM floor: 8% Stress: 24% DD Payback gate: 12mo (1.0yr) 5 PASS ⚠ ER 2026-11-20 INTRADAY (56d) inside new HP tenor
RECOMMENDED: Roll HP 45 → 25 (Jan 15, 112d) | Save $250,938/yr | Payback N/A hedge only, N/A w/income (gate: 12mo (1.0yr)) | HP moves to 9.5% OTM | RM 1.00x → 0.83x | Margin (TIMS): $387
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 25 Jan 15 112d 9.5% $3.35 $14.60 $73,000 $54,587 $49,047 $250,938 -7 $-35,000 N/A N/A 0.83x PASS
2 24 Jan 15 112d 13.1% $2.78 $15.17 $75,850 $45,299 $51,491 $260,225 -6 $-30,000 N/A N/A 0.85x PASS
3 22 Jan 15 112d 18.5% $2.14 $15.81 $79,050 $34,871 $60,453 $270,654 -4 $-22,500 N/A N/A 0.89x PASS
4 21 Jan 15 112d 23.9% $1.65 $16.30 $81,500 $26,886 $74,304 $278,638 -3 $-15,000 N/A N/A 0.93x PASS
5 20 Jan 15 112d 27.6% $1.39 $16.56 $82,800 $22,650 $63,549 $282,875 -2 $-10,000 N/A N/A 0.95x PASS
POST-REPAIR SUSTAINABILITY CC chain Oct 30 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $59 — assignment locks a loss · $35, B $0.63 $32,400/yr $54,587/yr DEFICIT $1,849/mo
CC at MID $32 0.7σ, B $1.07 $55,029/yr $54,587/yr SELF-FUNDING
AT 24% DRAWDOWN (stock $27.61 → $20.96, hedge $49,047/yr)
CC at SS income stress-adjusted $32,400/yr $49,047/yr DEFICIT $1,387/mo
CC at MID income stress-adjusted $32,400/yr $49,047/yr DEFICIT $1,387/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($32, bid $1.07) in NORMAL markets. Self-funds today.
In 24% drawdown, even MID is short ~$1,387/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.

IREN (Main): HP 35P Maintenance Roll-Out · exp Oct 16 '26, 21d

RELAXED PASS — no candidate met the standard constraints. Widened cost cap 25% → 50% of CC to surface the best available option below. Treat as a guideline breach, not a clean repair.
Stock: $43.97 Current HP: 35P (21d, 20.4% OTM) Current hedge: $12,514/yr Current ML: $56,000 If HP lapses: ML $126,000 (+$70,000) Account: Main (...1299) Contracts: 20 (2,000 sh) CC income: $67,029/yr Cost cap: 50% of CC = $33,514/yr IV: HIGH 6 qualifying ⚠ ER 2026-11-05 INTRADAY (41d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 35 → 35P (Jan 15 '27, 112d, 20.4% OTM) | Cost: $22,161/yr (33% of CC) | New ML: $56,000 = ML | Roll DEBIT $6,160 | Margin: n/a (RTH)
PROTECTIVE PICK (lowest ML within cost cap): HP 35 → 38P (Dec 18 '26, 84d, 13.6% OTM) | Cost: $33,024/yr (49% of CC) | New ML: $50,000 ↓ $6,000 | Roll DEBIT $6,960 | Margin: n/a (RTH)
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 35 CHEAP Jan 15 112d 20.4% $3.20 $3.40 $22,161 33% $56,000 = D $6,160
2 35 Dec 18 84d 20.4% $2.28 $2.67 $23,204 35% $56,000 = D $4,700
3 36 Dec 18 84d 18.1% $2.87 $2.99 $25,985 39% $54,000 -$2,000 D $5,340
4 37 Jan 15 112d 15.9% $3.85 $4.25 $27,701 41% $52,000 -$4,000 D $7,860
5 37 Dec 18 84d 15.9% $3.20 $3.45 $29,982 45% $52,000 -$4,000 D $6,260
▶ 6 38 PROT Dec 18 84d 13.6% $3.55 $3.80 $33,024 49% $50,000 -$6,000 D $6,960
POST-REPAIR SUSTAINABILITY CC chain Oct 30 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $51, B $1.81 $37,234/yr $22,161/yr SELF-FUNDING
CC at MID $51 0.7σ, B $1.81 $37,234/yr $22,161/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($51, bid $1.81). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

HP roll-downs do not change Safe Strike. SS = Max(LC+ND, (LC+SP+ND)/2). HP is not in the formula.

Monthly hedge cost prorated: (30/DTE) × (Ask × Shares). Payback = ML increase / Annual savings.

EST = ask price estimated as mid × 1.10 (10% safety buffer). Verify with live prices before executing.

Always prefer longest viable DTE for repair rolls (fewer rolls/yr = lower annual cost).