GENERATED2026-10-06 21:51
FORTRESS REPAIRHP Roll-Down Analysis
Payback gate: 12mo (1.0yr)
SS = Max(LC+ND, (LC+SP+ND)/2)
TOTAL HEDGE (CURRENT)
$398,622/yr
TOTAL HEDGE (REPAIRED)
$79,866/yr
ANNUAL SAVINGS
$318,756/yr
ROLL CREDITS
$83,985
ADDITIONAL MAX LOSS
$-7,500
PORTFOLIO ACTION SUMMARY · 40 positions
9 · ROLL NOW4 · REPAIR PLAN7 · LEAPS-ONLY20 · OK
Click any ticker row below to jump to its analysis section.
What do these actions mean? (legend)
NO HEDGE — No HP leg at all — naked synthetic long, no catastrophic protection.
ROLL IMMEDIATELY — Healthy fortress, HP expires ≤14d — roll the hedge out NOW (theta cliff).
REPAIR NOW — Structurally bad (HP ITM/tight or costly) AND ≤14d — roll HP DOWN today.
REPAIR SOON — Structurally bad AND ≤35d — roll HP DOWN this week.
ROLL NOW — Healthy fortress, HP ≤45d — roll the hedge OUT (maintain/raise strike).
REPAIR PLAN — Structurally bad but >35d runway — plan the roll-down, no rush.
LEAPS-ONLY — CSV-declared SP=0/HP=0 — intentional LC-only structure, no hedge to roll.
OK — Healthy structure with ample HP runway — no action.
REPAIR = roll HP down to a cheaper OTM strike (structure is hurting). ROLL = roll HP out/up to a later expiry (structure is healthy, hedge just expiring).
NOT ANALYZED THIS RUN · 1 FORTRESS(ES)
ETHA · no IBKR legs for ticker
These positions are MISSING from every section below, not healthy. Reconcile the CSV or re-run.

Fortress Position Overview

FORTRESSSTOCKLCSPHPSC BE‑SS CC‑SS GAPRMHP OTM%STATUSCTRSICNOTIONALURGENCY
Main (...1299)13 fortress(es) · 4 actionable · IC $1,186,710 · notional $3,286,752
GLD →
+320C −450P +330P −413C
$380.95 320450 330413 $456.00 $469.41 1201.88x 13.4% SAFE 10 $136,000$380,950 ROLL NOW (45d)
MU (Main) →
+880C −1010P +340P −1125C
$1062.07 8801010 3401125 $1028.60 $1039.24 6705.51x 68.0% SAFE 5 $74,300$531,035 ROLL NOW (45d)
BMNR (Main) →
+25C −18P +45P
$26.80 2518 450 $65.83 $60.40 01.00x -67.9% ITM 50 $204,150$134,000 REPAIR PLAN (101d)
IREN (Main) →
+25C −47P +35P −60C
$40.88 2547 3560 $44.00 $48.66 121.75x 14.4% SAFE 20 $32,000$81,760 REPAIR PLAN (101d)
IGV
+70C −115C
$111.97 700 0115 $96.50 $88.92 01.00x 0.0% N/A 12 $31,800$134,358 LEAPS-ONLY
MARA (Main)
+13C
$11.25 130 00 $16.75 $11.47 01.00x 0.0% N/A 400 $150,000$450,000 LEAPS-ONLY
BMNR (Main)
+23C −18P +25P
$26.80 2318 250 $53.26 $47.22 01.00x 6.7% OK 75 $226,950$201,000 OK
COIN (Main)
+165C −240P +90P −210C
$190.11 165240 90210 $210.90 $214.45 1509.93x 52.7% SAFE 8 $13,440$152,088 OK
COIN (Main)
+500C −330P +300P −210C
$190.11 500330 300210 $563.00 $380.01 301.48x -57.8% ITM 25 $157,500$475,275 OK
DELL
+310C −400P +320P −585C
$579.47 310400 320585 $562.50 $569.74 801.32x 44.8% SAFE 3 $75,750$173,841 OK
GLXY
+38C −38P +18P −25C
$22.92 3838 1825 $39.71 $35.56 2010.05x 23.6% SAFE 125 $27,625$286,500 OK
HIMS
+10C −20P +5P −32C
$29.65 1020 532 $17.47 $18.64 154.04x 83.1% SAFE 15 $7,395$44,475 OK
NVDA
+215C −225P +200P −250C
$241.47 215225 200250 $264.80 $230.23 251.50x 17.2% SAFE 10 $49,800$241,470 OK
Neville (...0865)10 fortress(es) · 4 actionable · IC $441,025 · notional $2,314,663
CRWV →
+105C −120P +40P −100C
$90.79 105120 40100 $125.45 $129.72 804.91x 55.9% SAFE 5 $10,225$45,395 ROLL NOW (45d)
IREN (Neville) →
+45C −65P +21P −60C
$40.88 4565 2160 $56.50 $58.12 4415.67x 48.6% SAFE 20 $6,000$81,760 ROLL NOW (45d)
MU (Neville) →
+970C −1110P +390P −1150C
$1062.07 9701110 3901150 $1220.00 $1225.93 7203.88x 63.3% SAFE 2 $50,000$212,414 ROLL NOW (45d)
SNDK →
+1200C −1380P +810P −1830C
$1682.23 12001380 8101830 $1620.00 $1623.93 5702.36x 51.8% SAFE 1 $42,000$168,223 ROLL NOW (45d)
SPY
+640C −780C
$778.98 6400 0780 $764.00 $703.58 01.00x 0.0% N/A 12 $148,800$934,776 LEAPS-ONLY
CRCL
+45C −65P +40P −91C
$85.00 4565 4091 $87.00 $90.97 251.60x 52.9% SAFE 5 $21,000$42,500 OK
GOOG (Neville)
+300C −345P +310P −360C
$341.91 300345 310360 $373.00 $345.95 351.48x 9.3% OK 15 $109,500$512,865 OK
GOOG (Neville)
+340C −405P +360P −360C
$341.91 340405 360360 $398.00 $386.13 451.88x -5.3% ITM 5 $25,500$170,955 OK
INTC
+85C −100P +35P −133C
$116.22 85100 35133 $114.00 $115.23 653.24x 69.9% SAFE 5 $14,500$58,110 OK
SPCX
+150C −195P +135P −195C
$175.33 150195 135195 $186.00 $189.60 603.22x 23.0% SAFE 5 $13,500$87,665 OK
RetireInc (...7291)9 fortress(es) · 3 actionable · IC $180,200 · notional $1,106,162
AAPL →
+240C −330P +285P −340C
$332.10 240330 285340 $334.64 $336.86 451.48x 14.2% SAFE 5 $47,320$166,050 ROLL NOW (45d)
APP →
+460C −540P +185P −300C
$280.76 460540 185300 $588.00 $612.47 3553.77x 34.1% SAFE 1 $12,800$28,076 ROLL NOW (45d)
IREN (RetireInc) →
+50C −70P +23P −60C
$40.88 5070 2360 $63.43 $66.63 477.86x 43.7% SAFE 20 $13,700$81,760 ROLL NOW (45d)
MARA (RetireInc)
+40C
$11.25 400 00 $41.04 $11.68 01.00x 0.0% N/A 500 $52,000$562,500 LEAPS-ONLY
CLSK
+17C −17P +10P
$12.51 1717 100 $20.74 $18.34 72.87x 20.0% SAFE 25 $9,350$31,263 OK
ENPH
+45C −60P +20P
$33.35 4560 200 $56.15 $58.79 406.48x 40.0% SAFE 10 $7,300$33,350 OK
MSTR (RetireInc)
+125C −185P +55P −170C
$167.70 125185 55170 $161.00 $163.78 13011.83x 67.2% SAFE 4 $4,800$67,080 OK
QCOM
+190C −210P +100P −220C
$179.67 190210 100220 $224.00 $225.92 1104.24x 44.3% SAFE 5 $17,000$89,835 OK
RKLB
+115C −135P +45P −78C
$77.08 115135 4578 $141.55 $148.83 904.39x 41.6% SAFE 6 $15,930$46,248 OK
Joint (...1782)8 fortress(es) · 2 actionable · IC $490,588 · notional $1,477,140
AMZN →
+200C −250P +215P −260C
$252.97 200250 215260 $267.92 $271.18 351.52x 15.0% SAFE 5 $33,960$126,485 REPAIR PLAN (45d)
IREN (Joint) →
+25C −47P +35P −60C
$40.88 2547 3560 $44.00 $48.66 121.75x 14.4% SAFE 20 $32,000$81,760 REPAIR PLAN (101d)
GOOG (Joint)
+310C −355C
$341.91 3100 0355 $392.50 $349.45 01.00x 0.0% N/A 5 $41,250$170,955 LEAPS-ONLY
IBIT
+75C
$48.91 750 00 $70.58 $53.00 01.00x 0.0% N/A 50 $22,328$244,550 LEAPS-ONLY
MSTR (Joint)
+180C −170C
$167.70 1800 0170 $233.00 $174.46 01.00x 0.0% N/A 10 $53,000$167,700 LEAPS-ONLY
BMNR (Joint)
+23C −18P +25P
$26.80 2318 250 $36.42 $24.75 01.00x 6.7% OK 150 $201,300$402,000 OK
COPX
+65C −90P +68P −89C
$85.08 6590 6889 $93.40 $96.66 221.77x 20.1% SAFE 20 $56,800$170,160 OK
HOOD
+65C −95P +80P −120C
$113.53 6595 80120 $114.95 $118.73 151.30x 29.5% SAFE 10 $49,950$113,530 OK
Main (...1299)13 fortress(es) · 4 actionable · overview rows

GLD: HP 330P Maintenance Roll-Out · exp Nov 20 '26, 45d

RELAXED PASS — no candidate met the standard constraints. Widened cost cap 25% → 50% of CC to surface the best available option below. Treat as a guideline breach, not a clean repair.
Stock: $380.95 Current HP: 330P (45d, 13.4% OTM) Current hedge: $5,678/yr Current ML: $256,000 If HP lapses: ML $586,000 (+$330,000) Account: Main (...1299) Contracts: 10 (1,000 sh) CC income: $26,024/yr Cost cap: 50% of CC = $13,012/yr IV: MEDIUM 19 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 330 → 330P (Dec 18 '26, 73d, 13.4% OTM) | Cost: $7,000/yr (27% of CC) | New ML: $256,000 = ML | Roll DEBIT $730 | Margin: n/a (RTH)
PROTECTIVE PICK (lowest ML within cost cap): HP 330 → 342P (Jan 15 '27, 101d, 10.2% OTM) | Cost: $12,287/yr (47% of CC) | New ML: $244,000 ↓ $12,000 | Roll DEBIT $2,730 | Margin: n/a (RTH)
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 330 CHEAP Dec 18 73d 13.4% $1.34 $1.40 $7,000 27% $256,000 = D $730
2 330 Dec 31 86d 13.4% $1.61 $1.76 $7,470 29% $256,000 = D $1,090
3 330 Jan 15 101d 13.4% $2.05 $2.12 $7,661 29% $256,000 = D $1,450
4 331 Jan 15 101d 13.1% $2.13 $2.20 $7,950 31% $255,000 -$1,000 D $1,530
5 332 Jan 15 101d 12.8% $2.21 $2.28 $8,240 32% $254,000 -$2,000 D $1,610
6 335 Dec 18 73d 12.1% $1.67 $1.72 $8,600 33% $251,000 -$5,000 D $1,050
7 333 Jan 15 101d 12.6% $2.27 $2.42 $8,746 34% $253,000 -$3,000 D $1,750
8 335 Dec 31 86d 12.1% $1.97 $2.12 $8,998 35% $251,000 -$5,000 D $1,450
9 334 Jan 15 101d 12.3% $2.36 $2.51 $9,071 35% $252,000 -$4,000 D $1,840
10 335 Jan 15 101d 12.1% $2.45 $2.60 $9,396 36% $251,000 -$5,000 D $1,930
11 336 Jan 15 101d 11.8% $2.55 $2.66 $9,613 37% $250,000 -$6,000 D $1,990
12 337 Jan 15 101d 11.5% $2.65 $2.80 $10,119 39% $249,000 -$7,000 D $2,130
▶ 13 342 PROT Jan 15 101d 10.2% $3.25 $3.40 $12,287 47% $244,000 -$12,000 D $2,730
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $469 — assignment locks a loss · $393, B $5.00 $58,065/yr $7,000/yr SELF-FUNDING
CC at MID $393 0.5σ, B $5.00 $58,065/yr $7,000/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($393, bid $5.00). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

MU (Main): HP 340P Maintenance Roll-Out · exp Nov 20 '26, 45d

Stock: $1062.07 Current HP: 340P (45d, 68.0% OTM) Current hedge: $892/yr Current ML: $409,300 If HP lapses: ML $579,300 (+$170,000) Account: Main (...1299) Contracts: 5 (500 sh) CC income: $573,929/yr Cost cap: 25% of CC = $143,482/yr IV: HIGH 128 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 340 → 360P (Dec 18 '26, 73d, 66.1% OTM) | Cost: $1,000/yr (0% of CC) | New ML: $399,300 ↓ $10,000 | Roll DEBIT $195 | Margin (TIMS): $67,576
PROTECTIVE PICK (lowest ML within cost cap): HP 340 → 970P (Jan 15 '27, 101d, 8.7% OTM) | Cost: $108,235/yr (19% of CC) | New ML: $94,300 ↓ $315,000 | Roll DEBIT $29,945 | Margin (TIMS): $23,200
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 360 CHEAP Dec 18 73d 66.1% $0.20 $0.40 $1,000 0% $399,300 -$10,000 D $195
2 400 Dec 18 73d 62.3% $0.30 $0.50 $1,250 0% $379,300 -$30,000 D $245
3 370 Dec 18 73d 65.2% $0.05 $0.56 $1,400 0% $394,300 -$15,000 D $275
4 380 Dec 18 73d 64.2% $0.08 $0.60 $1,500 0% $389,300 -$20,000 D $295
5 340 Jan 15 101d 68.0% $0.01 $1.00 $1,807 0% $409,300 = D $495
6 350 Jan 15 101d 67.0% $0.02 $1.00 $1,807 0% $404,300 -$5,000 D $495
7 430 Dec 18 73d 59.5% $0.01 $0.80 $2,000 0% $364,300 -$45,000 D $395
8 340 Dec 18 73d 68.0% $0.04 $0.82 $2,050 0% $409,300 = D $405
9 410 Dec 18 73d 61.4% $0.06 $0.85 $2,125 0% $374,300 -$35,000 D $420
10 360 Jan 15 101d 66.1% $0.02 $1.50 $2,710 0% $399,300 -$10,000 D $745
11 440 Dec 18 73d 58.6% $0.16 $1.10 $2,750 0% $359,300 -$50,000 D $545
12 450 Jan 15 101d 57.6% $1.02 $1.58 $2,855 0% $354,300 -$55,000 D $785
▶ 13 970 PROT Jan 15 101d 8.7% $55.30 $59.90 $108,235 19% $94,300 -$315,000 D $29,945
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $1045, B $64.30 $373,355/yr $1,000/yr SELF-FUNDING
CC at MID $1140 0.6σ, B $28.00 $162,581/yr $1,000/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($1045, bid $64.30). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

BMNR (Main): HP 45P Roll-Down · exp Jan 15 '27, 101d

Stock: $26.80 HP: ITM Current hedge: $340,606/yr Baseline: current hedge (no same-strike quote) SS: $65.83 (unchanged) Account: Main (...1299) Contracts: 50 (5,000 sh) CC income: $80,786/yr IV: HIGH OTM floor: 8% Stress: 23% DD Payback gate: 12mo (1.0yr) 5 PASS ⚠ ER 2026-11-20 INTRADAY (45d) inside new HP tenor
RECOMMENDED: Roll HP 45 → 24 (Jan 15, 101d) | Save $292,903/yr | Payback N/A hedge only, N/A w/income (gate: 12mo (1.0yr)) | HP moves to 10.4% OTM | RM 1.00x → 0.85x | Margin (TIMS): $321
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 24 Jan 15 101d 10.4% $2.64 $15.76 $78,800 $47,703 $46,980 $292,903 -6 $-30,000 N/A N/A 0.85x PASS
2 22 Jan 15 101d 16.0% $2.02 $16.38 $81,900 $36,500 $58,725 $304,106 -4 $-22,500 N/A N/A 0.89x PASS
3 21 Jan 15 101d 21.6% $1.49 $16.91 $84,550 $26,923 $72,277 $313,683 -3 $-15,000 N/A N/A 0.93x PASS
4 20 Jan 15 101d 25.4% $1.18 $17.22 $86,100 $21,322 $65,953 $319,285 -2 $-10,000 N/A N/A 0.95x PASS
5 19 Jan 15 101d 29.1% $0.93 $17.47 $87,350 $16,804 $54,208 $323,802 -1 $-5,000 N/A N/A 0.98x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $60 — assignment locks a loss · $35, B $0.29 $16,839/yr $47,703/yr DEFICIT $2,572/mo
CC at MID $30 0.7σ, B $1.00 $58,065/yr $47,703/yr SELF-FUNDING
AT 23% DRAWDOWN (stock $26.80 → $20.64, hedge $46,980/yr)
CC at SS income stress-adjusted $16,839/yr $46,980/yr DEFICIT $2,512/mo
CC at MID income stress-adjusted $16,839/yr $46,980/yr DEFICIT $2,512/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($30, bid $1.00) in NORMAL markets. Self-funds today.
In 23% drawdown, even MID is short ~$2,512/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.

IREN (Main): HP 35P Roll-Down · exp Jan 15 '27, 101d

Stock: $40.88 HP: 14.4% OTM Current hedge: $25,297/yr Baseline (roll-fwd, savings vs this): $25,297/yr SS: $44.00 (unchanged) Account: Main (...1299) Contracts: 20 (2,000 sh) CC income: $66,045/yr IV: HIGH OTM floor: 8% Stress: 22% DD Payback gate: 12mo (1.0yr) 2 PASS ⚠ ER 2026-11-05 INTRADAY (30d) inside new HP tenor
RECOMMENDED: Roll HP 35 → 30 (Jan 15, 101d) | Save $12,287/yr | Payback 10mo (0.81yr) hedge only, 2mo (0.13yr) w/income (gate: 12mo (1.0yr)) | HP moves to 26.6% OTM | RM 1.75x → 2.06x | Margin: n/a (RTH)
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 30 Jan 15 101d 26.6% $1.80 $1.50 $3,000 $13,010 $29,995 $12,287 17 $10,000 10mo 2mo 2.06x PASS
2 32 Jan 15 101d 21.7% $2.50 $0.80 $1,600 $18,069 $40,331 $7,228 15 $6,000 10mo 1mo 1.94x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $49, B $1.19 $27,639/yr $13,010/yr SELF-FUNDING
CC at MID $47 0.7σ, B $1.56 $36,232/yr $13,010/yr SELF-FUNDING
AT 22% DRAWDOWN (stock $40.88 → $31.88, hedge $29,995/yr)
CC at SS income stress-adjusted $7,897/yr $29,995/yr DEFICIT $1,842/mo
CC at MID income stress-adjusted $7,897/yr $29,995/yr DEFICIT $1,842/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($47, bid $1.56) in NORMAL markets. Self-funds today.
In 22% drawdown, even MID is short ~$1,842/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.
Neville (...0865)10 fortress(es) · 4 actionable · overview rows

CRWV: HP 40P Maintenance Roll-Out · exp Nov 20 '26, 45d

Stock: $90.79 Current HP: 40P (45d, 55.9% OTM) Current hedge: $446/yr Current ML: $50,225 If HP lapses: ML $70,225 (+$20,000) Account: Neville (...0865) Contracts: 5 (500 sh) CC income: $34,392/yr Cost cap: 25% of CC = $8,598/yr IV: HIGH 24 qualifying ⚠ ER 2026-11-11 INTRADAY (36d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 40 → 40P (Dec 18 '26, 73d, 55.9% OTM) | Cost: $500/yr (1% of CC) | New ML: $50,225 = ML | Roll DEBIT $80 | Margin (TIMS): $2,305
PROTECTIVE PICK (lowest ML within cost cap): HP 40 → 70P (Dec 18 '26, 73d, 22.9% OTM) | Cost: $8,125/yr (24% of CC) | New ML: $35,225 ↓ $15,000 | Roll DEBIT $1,605 | Margin (TIMS): $2,213
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 40 CHEAP Dec 18 73d 55.9% $0.02 $0.20 $500 1% $50,225 = D $80
2 45 Dec 18 73d 50.4% $0.17 $0.27 $675 2% $47,725 -$2,500 D $115
3 40 Jan 15 101d 55.9% $0.06 $0.40 $723 2% $50,225 = D $180
4 42 Dec 18 73d 53.2% $0.04 $0.31 $775 2% $48,975 -$1,250 D $135
5 42 Jan 15 101d 53.2% $0.22 $0.52 $940 3% $48,975 -$1,250 D $240
6 45 Jan 15 101d 50.4% $0.32 $0.53 $958 3% $47,725 -$2,500 D $245
7 50 Dec 18 73d 44.9% $0.44 $0.47 $1,175 3% $45,225 -$5,000 D $215
8 48 Dec 18 73d 47.7% $0.18 $0.52 $1,300 4% $46,475 -$3,750 D $240
9 48 Jan 15 101d 47.7% $0.46 $0.84 $1,518 4% $46,475 -$3,750 D $400
10 50 Jan 15 101d 44.9% $0.68 $1.04 $1,879 5% $45,225 -$5,000 D $500
11 55 Dec 18 73d 39.4% $0.74 $0.79 $1,975 6% $42,725 -$7,500 D $375
12 52 Jan 15 101d 42.2% $0.85 $1.32 $2,385 7% $43,975 -$6,250 D $640
▶ 13 70 PROT Dec 18 73d 22.9% $3.00 $3.25 $8,125 24% $35,225 -$15,000 D $1,605
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $130, B $0.63 $3,658/yr $500/yr SELF-FUNDING
CC at MID $105 0.8σ, B $3.05 $17,710/yr $500/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($130, bid $0.63). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

IREN (Neville): HP 21P Maintenance Roll-Out · exp Nov 20 '26, 45d

Stock: $40.88 Current HP: 21P (45d, 48.6% OTM) Current hedge: $1,460/yr Current ML: $94,000 If HP lapses: ML $136,000 (+$42,000) Account: Neville (...0865) Contracts: 20 (2,000 sh) CC income: $66,045/yr Cost cap: 25% of CC = $16,511/yr IV: HIGH 9 qualifying ⚠ ER 2026-11-05 INTRADAY (30d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 21 → 22P (Dec 18 '26, 73d, 46.2% OTM) | Cost: $2,800/yr (4% of CC) | New ML: $92,000 ↓ $2,000 | Roll DEBIT $440 | Margin (TIMS): $2,068
PROTECTIVE PICK (lowest ML within cost cap): HP 21 → 31P (Dec 18 '26, 73d, 24.2% OTM) | Cost: $15,700/yr (24% of CC) | New ML: $74,000 ↓ $20,000 | Roll DEBIT $3,020 | Margin (TIMS): $1,634
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 22 CHEAP Dec 18 73d 46.2% $0.14 $0.28 $2,800 4% $92,000 -$2,000 D $440
2 22 Jan 15 101d 46.2% $0.24 $0.59 $4,264 6% $92,000 -$2,000 D $1,060
3 25 Dec 18 73d 38.8% $0.27 $0.47 $4,700 7% $86,000 -$8,000 D $820
4 25 Jan 15 101d 38.8% $0.61 $0.93 $6,722 10% $86,000 -$8,000 D $1,740
5 27 Dec 18 73d 34.0% $0.59 $0.80 $8,000 12% $82,000 -$12,000 D $1,480
6 27 Jan 15 101d 34.0% $0.81 $1.25 $9,035 14% $82,000 -$12,000 D $2,380
7 30 Dec 18 73d 26.6% $0.99 $1.19 $11,900 18% $76,000 -$18,000 D $2,260
8 30 Jan 15 101d 26.6% $1.66 $1.80 $13,010 20% $76,000 -$18,000 D $3,480
▶ 9 31 PROT Dec 18 73d 24.2% $1.22 $1.57 $15,700 24% $74,000 -$20,000 D $3,020
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $60, B $0.34 $7,897/yr $2,800/yr SELF-FUNDING
CC at MID $47 0.7σ, B $1.56 $36,232/yr $2,800/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($60, bid $0.34). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

MU (Neville): HP 390P Maintenance Roll-Out · exp Nov 20 '26, 45d

Stock: $1062.07 Current HP: 390P (45d, 63.3% OTM) Current hedge: $730/yr Current ML: $194,000 If HP lapses: ML $272,000 (+$78,000) Account: Neville (...0865) Contracts: 2 (200 sh) CC income: $69,823/yr Cost cap: 25% of CC = $17,456/yr IV: HIGH 94 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 390 → 400P (Dec 18 '26, 73d, 62.3% OTM) | Cost: $500/yr (1% of CC) | New ML: $192,000 ↓ $2,000 | Roll DEBIT $98 | Margin (TIMS): $57,496
PROTECTIVE PICK (lowest ML within cost cap): HP 390 → 860P (Dec 18 '26, 73d, 19.0% OTM) | Cost: $17,000/yr (24% of CC) | New ML: $100,000 ↓ $94,000 | Roll DEBIT $3,398 | Margin (TIMS): $21,421
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 400 CHEAP Dec 18 73d 62.3% $0.30 $0.50 $500 1% $192,000 -$2,000 D $98
2 430 Dec 18 73d 59.5% $0.01 $0.80 $800 1% $186,000 -$8,000 D $158
3 410 Dec 18 73d 61.4% $0.06 $0.85 $850 1% $190,000 -$4,000 D $168
4 440 Dec 18 73d 58.6% $0.16 $1.10 $1,100 2% $184,000 -$10,000 D $218
5 450 Jan 15 101d 57.6% $1.02 $1.58 $1,142 2% $182,000 -$12,000 D $314
6 390 Jan 15 101d 63.3% $0.15 $1.65 $1,193 2% $194,000 = D $328
7 390 Dec 18 73d 63.3% $0.01 $1.22 $1,220 2% $194,000 = D $242
8 400 Jan 15 101d 62.3% $0.19 $1.69 $1,221 2% $192,000 -$2,000 D $336
9 410 Jan 15 101d 61.4% $0.21 $1.71 $1,236 2% $190,000 -$4,000 D $340
10 420 Jan 15 101d 60.5% $0.25 $1.75 $1,265 2% $188,000 -$6,000 D $348
11 480 Dec 18 73d 54.8% $0.51 $1.27 $1,270 2% $176,000 -$18,000 D $252
12 460 Jan 15 101d 56.7% $1.02 $1.76 $1,272 2% $180,000 -$14,000 D $350
▶ 13 860 PROT Dec 18 73d 19.0% $15.55 $17.00 $17,000 24% $100,000 -$94,000 D $3,398
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $1,226 — assignment locks a loss · $1140, B $28.00 $65,032/yr $500/yr SELF-FUNDING
CC at MID $1140 0.6σ, B $28.00 $65,032/yr $500/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($1140, bid $28.00). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

SNDK: HP 810P Maintenance Roll-Out · exp Nov 20 '26, 45d

Stock: $1682.23 Current HP: 810P (45d, 51.8% OTM) Current hedge: $2,028/yr Current ML: $99,000 If HP lapses: ML $180,000 (+$81,000) Account: Neville (...0865) Contracts: 1 (100 sh) CC income: $222,870/yr Cost cap: 25% of CC = $55,718/yr IV: HIGH 144 qualifying ⚠ ER 2026-10-29 AMC (23d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 810 → 880P (Dec 18 '26, 73d, 47.7% OTM) | Cost: $1,600/yr (1% of CC) | New ML: $92,000 ↓ $7,000 | Roll DEBIT $320 | Margin (TIMS): $86,163
PROTECTIVE PICK (lowest ML within cost cap): HP 810 → 1380P (Jan 15 '27, 101d, 18.0% OTM) | Cost: $25,695/yr (12% of CC) | New ML: $42,000 ↓ $57,000 | Roll DEBIT $7,110 | Margin (TIMS): $43,815
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 880 CHEAP Dec 18 73d 47.7% $1.30 $3.20 $1,600 1% $92,000 -$7,000 D $320
2 840 Jan 15 101d 50.1% $2.40 $5.00 $1,807 1% $96,000 -$3,000 D $500
3 850 Jan 15 101d 49.5% $3.30 $5.30 $1,915 1% $95,000 -$4,000 D $530
4 860 Jan 15 101d 48.9% $3.50 $5.40 $1,951 1% $94,000 -$5,000 D $540
5 810 Jan 15 101d 51.8% $0.05 $5.60 $2,024 1% $99,000 = D $560
6 870 Jan 15 101d 48.3% $3.70 $5.70 $2,060 1% $93,000 -$6,000 D $570
7 820 Jan 15 101d 51.3% $0.70 $5.80 $2,096 1% $98,000 -$1,000 D $580
8 830 Jan 15 101d 50.7% $0.95 $5.90 $2,132 1% $97,000 -$2,000 D $590
9 880 Jan 15 101d 47.7% $2.60 $5.90 $2,132 1% $92,000 -$7,000 D $590
10 890 Jan 15 101d 47.1% $4.20 $6.10 $2,204 1% $91,000 -$8,000 D $610
11 900 Jan 15 101d 46.5% $3.00 $6.40 $2,313 1% $90,000 -$9,000 D $640
12 930 Jan 15 101d 44.7% $4.20 $6.50 $2,349 1% $87,000 -$12,000 D $650
▶ 13 1380 PROT Jan 15 101d 18.0% $65.70 $71.10 $25,695 12% $42,000 -$57,000 D $7,110
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $1650, B $138.30 $160,606/yr $1,600/yr SELF-FUNDING
CC at MID $1745 0.2σ, B $96.30 $111,832/yr $1,600/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($1650, bid $138.30). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.
RetireInc (...7291)9 fortress(es) · 3 actionable · overview rows

AAPL: HP 285P Maintenance Roll-Out · exp Nov 20 '26, 45d

Stock: $332.10 Current HP: 285P (45d, 14.2% OTM) Current hedge: $4,704/yr Current ML: $69,820 If HP lapses: ML $212,320 (+$142,500) Account: RetireInc (...7291) Contracts: 5 (500 sh) CC income: $32,896/yr Cost cap: 25% of CC = $8,224/yr IV: MEDIUM 4 qualifying ⚠ ER 2026-10-29 AMC (23d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 285 → 285P (Dec 18 '26, 73d, 14.2% OTM) | Cost: $5,625/yr (17% of CC) | New ML: $69,820 = ML | Roll DEBIT $605 | Margin (TIMS): $5,832
PROTECTIVE PICK (lowest ML within cost cap): HP 285 → 290P (Dec 18 '26, 73d, 12.7% OTM) | Cost: $6,875/yr (21% of CC) | New ML: $67,320 ↓ $2,500 | Roll DEBIT $855 | Margin (TIMS): $5,599
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 285 CHEAP Dec 18 73d 14.2% $2.04 $2.25 $5,625 17% $69,820 = D $605
2 285 Jan 15 101d 14.2% $3.05 $3.25 $5,873 18% $69,820 = D $1,105
▶ 3 290 PROT Dec 18 73d 12.7% $2.56 $2.75 $6,875 21% $67,320 -$2,500 D $855
4 290 Jan 15 101d 12.7% $3.65 $3.85 $6,957 21% $67,320 -$2,500 D $1,405
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $340, B $6.80 $39,484/yr $5,625/yr SELF-FUNDING
CC at MID $350 0.7σ, B $3.65 $21,194/yr $5,625/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($340, bid $6.80). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

APP: HP 185P Maintenance Roll-Out · exp Nov 20 '26, 45d

Stock: $280.76 Current HP: 185P (45d, 34.1% OTM) Current hedge: $1,744/yr Current ML: $48,300 If HP lapses: ML $66,800 (+$18,500) Account: RetireInc (...7291) Contracts: 1 (100 sh) CC income: $18,003/yr Cost cap: 25% of CC = $4,501/yr IV: HIGH 10 qualifying ⚠ ER 2026-11-04 INTRADAY (29d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 185 → 185P (Dec 18 '26, 73d, 34.1% OTM) | Cost: $1,700/yr (9% of CC) | New ML: $48,300 = ML | Roll DEBIT $265 | Margin (TIMS): $9,595
PROTECTIVE PICK (lowest ML within cost cap): HP 185 → 210P (Jan 15 '27, 101d, 25.2% OTM) | Cost: $3,614/yr (20% of CC) | New ML: $45,800 ↓ $2,500 | Roll DEBIT $925 | Margin (TIMS): $8,940
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 185 CHEAP Dec 18 73d 34.1% $2.10 $3.40 $1,700 9% $48,300 = D $265
2 185 Jan 15 101d 34.1% $3.50 $5.50 $1,988 11% $48,300 = D $475
3 190 Jan 15 101d 32.3% $4.20 $6.20 $2,241 12% $47,800 -$500 D $545
4 190 Dec 18 73d 32.3% $2.30 $4.50 $2,250 12% $47,800 -$500 D $375
5 195 Dec 18 73d 30.5% $3.00 $5.00 $2,500 14% $47,300 -$1,000 D $425
6 195 Jan 15 101d 30.5% $4.90 $7.00 $2,530 14% $47,300 -$1,000 D $625
7 200 Jan 15 101d 28.8% $5.70 $7.90 $2,855 16% $46,800 -$1,500 D $715
8 200 Dec 18 73d 28.8% $3.50 $5.90 $2,950 16% $46,800 -$1,500 D $515
▶ 9 210 PROT Jan 15 101d 25.2% $7.70 $10.00 $3,614 20% $45,800 -$2,500 D $925
10 210 Dec 18 73d 25.2% $5.00 $7.70 $3,850 21% $45,800 -$2,500 D $695
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $612 — assignment locks a loss · $375, B $2.20 $2,555/yr $1,700/yr SELF-FUNDING
CC at MID $320 0.7σ, B $9.70 $11,265/yr $1,700/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($375, bid $2.20). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

IREN (RetireInc): HP 23P Maintenance Roll-Out · exp Nov 20 '26, 45d

Stock: $40.88 Current HP: 23P (45d, 43.7% OTM) Current hedge: $2,758/yr Current ML: $107,700 If HP lapses: ML $153,700 (+$46,000) Account: RetireInc (...7291) Contracts: 20 (2,000 sh) CC income: $66,045/yr Cost cap: 25% of CC = $16,511/yr IV: HIGH 7 qualifying ⚠ ER 2026-11-05 INTRADAY (30d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 23 → 25P (Dec 18 '26, 73d, 38.8% OTM) | Cost: $4,700/yr (7% of CC) | New ML: $103,700 ↓ $4,000 | Roll DEBIT $840 | Margin (TIMS): $1,991
PROTECTIVE PICK (lowest ML within cost cap): HP 23 → 31P (Dec 18 '26, 73d, 24.2% OTM) | Cost: $15,700/yr (24% of CC) | New ML: $91,700 ↓ $16,000 | Roll DEBIT $3,040 | Margin (TIMS): $1,646
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 25 CHEAP Dec 18 73d 38.8% $0.27 $0.47 $4,700 7% $103,700 -$4,000 D $840
2 25 Jan 15 101d 38.8% $0.61 $0.93 $6,722 10% $103,700 -$4,000 D $1,760
3 27 Dec 18 73d 34.0% $0.59 $0.80 $8,000 12% $99,700 -$8,000 D $1,500
4 27 Jan 15 101d 34.0% $0.81 $1.25 $9,035 14% $99,700 -$8,000 D $2,400
5 30 Dec 18 73d 26.6% $0.99 $1.19 $11,900 18% $93,700 -$14,000 D $2,280
6 30 Jan 15 101d 26.6% $1.66 $1.80 $13,010 20% $93,700 -$14,000 D $3,500
▶ 7 31 PROT Dec 18 73d 24.2% $1.22 $1.57 $15,700 24% $91,700 -$16,000 D $3,040
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $67 — assignment locks a loss · $60, B $0.34 $7,897/yr $4,700/yr SELF-FUNDING
CC at MID $47 0.7σ, B $1.56 $36,232/yr $4,700/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($60, bid $0.34). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.
Joint (...1782)8 fortress(es) · 2 actionable · overview rows

AMZN: HP 215P Roll-Down · exp Nov 20 '26, 45d

RELAXED PASS — no candidate met the standard constraints. Widened gap-mult 2.0x → 8.0x; payback gate 1.0yr → 2.0yr to surface the best available option below. Treat as a guideline breach, not a clean repair.
Stock: $252.97 HP: 15.0% OTM Current hedge: $7,422/yr Baseline (roll-fwd, savings vs this): $7,589/yr SS: $267.92 (unchanged) Account: Joint (...1782) Contracts: 5 (500 sh) CC income: $19,218/yr IV: MEDIUM OTM floor: 10% Stress: 11% DD Payback gate: 12mo (1.0yr) 2 PASS ⚠ ER 2026-10-29 AMC (23d) inside new HP tenor
RECOMMENDED: Roll HP 215 → 210 (Jan 15, 101d) | Save $1,446/yr | Payback 21mo (1.73yr) hedge only, 1mo (0.12yr) w/income (gate: 12mo (1.0yr)) | HP moves to 17.0% OTM | RM 1.52x → 1.59x | Margin (TIMS): $4,421
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 210 Jan 15 101d 17.0% $3.40 $-1.63 $-815 $6,144 $13,552 $1,446 40 $2,500 21mo 1mo 1.59x PASS
2 205 Jan 15 101d 19.0% $2.80 $-1.03 $-515 $5,059 $10,932 $2,530 45 $5,000 24mo 3mo 1.66x PASS
3 180 Jan 15 101d 28.8% $1.07 $0.70 $350 $1,933 $3,632 $5,656 70 $17,500 37mo 8mo 2.03x FAIL
4 185 Jan 15 101d 26.9% $1.28 $0.49 $245 $2,313 $4,282 $5,276 65 $15,000 34mo 7mo 1.96x FAIL
5 190 Jan 15 101d 24.9% $1.55 $0.22 $110 $2,801 $5,692 $4,788 60 $12,500 31mo 6mo 1.88x FAIL
6 195 Jan 15 101d 22.9% $1.85 $-0.08 $-40 $3,343 $7,137 $4,246 55 $10,000 28mo 5mo 1.81x FAIL
7 200 Jan 15 101d 20.9% $2.22 $-0.45 $-225 $4,011 $8,764 $3,578 50 $7,500 25mo 4mo 1.74x FAIL
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $275, B $4.20 $24,387/yr $6,144/yr SELF-FUNDING
CC at MID $270 0.6σ, B $5.50 $31,935/yr $6,144/yr SELF-FUNDING
AT 11% DRAWDOWN (stock $252.97 → $224.12, hedge $13,552/yr)
CC at SS income stress-adjusted $2,671/yr $13,552/yr DEFICIT $907/mo
CC at MID income stress-adjusted $4,065/yr $13,552/yr DEFICIT $791/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($270, bid $5.50) in NORMAL markets. Self-funds today.
In 11% drawdown, even MID is short ~$791/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.

IREN (Joint): HP 35P Roll-Down · exp Jan 15 '27, 101d

Stock: $40.88 HP: 14.4% OTM Current hedge: $25,297/yr Baseline (roll-fwd, savings vs this): $25,297/yr SS: $44.00 (unchanged) Account: Joint (...1782) Contracts: 20 (2,000 sh) CC income: $66,045/yr IV: HIGH OTM floor: 8% Stress: 22% DD Payback gate: 12mo (1.0yr) 2 PASS ⚠ ER 2026-11-05 INTRADAY (30d) inside new HP tenor
RECOMMENDED: Roll HP 35 → 30 (Jan 15, 101d) | Save $12,287/yr | Payback 10mo (0.81yr) hedge only, 2mo (0.13yr) w/income (gate: 12mo (1.0yr)) | HP moves to 26.6% OTM | RM 1.75x → 2.06x | Margin (TIMS): $1,665
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 30 Jan 15 101d 26.6% $1.80 $1.50 $3,000 $13,010 $29,995 $12,287 17 $10,000 10mo 2mo 2.06x PASS
2 32 Jan 15 101d 21.7% $2.50 $0.80 $1,600 $18,069 $40,331 $7,228 15 $6,000 10mo 1mo 1.94x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $49, B $1.19 $27,639/yr $13,010/yr SELF-FUNDING
CC at MID $47 0.7σ, B $1.56 $36,232/yr $13,010/yr SELF-FUNDING
AT 22% DRAWDOWN (stock $40.88 → $31.88, hedge $29,995/yr)
CC at SS income stress-adjusted $7,897/yr $29,995/yr DEFICIT $1,842/mo
CC at MID income stress-adjusted $7,897/yr $29,995/yr DEFICIT $1,842/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($47, bid $1.56) in NORMAL markets. Self-funds today.
In 22% drawdown, even MID is short ~$1,842/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.

HP roll-downs do not change Safe Strike. SS = Max(LC+ND, (LC+SP+ND)/2). HP is not in the formula.

Monthly hedge cost prorated: (30/DTE) × (Ask × Shares). Payback = ML increase / Annual savings.

EST = ask price estimated as mid × 1.10 (10% safety buffer). Verify with live prices before executing.

Always prefer longest viable DTE for repair rolls (fewer rolls/yr = lower annual cost).