GENERATED2026-10-07 03:53
FORTRESS REPAIRHP Roll-Down Analysis
Payback gate: 12mo (1.0yr)
SS = Max(LC+ND, (LC+SP+ND)/2)
TOTAL HEDGE (CURRENT)
$408,553/yr
TOTAL HEDGE (REPAIRED)
$73,343/yr
ANNUAL SAVINGS
$335,210/yr
ROLL CREDITS
$85,475
ADDITIONAL MAX LOSS
$-8,000
PORTFOLIO ACTION SUMMARY · 41 positions
9 · ROLL NOW4 · REPAIR PLAN7 · LEAPS-ONLY21 · OK
Click any ticker row below to jump to its analysis section.
What do these actions mean? (legend)
NO HEDGE — No HP leg at all — naked synthetic long, no catastrophic protection.
ROLL IMMEDIATELY — Healthy fortress, HP expires ≤14d — roll the hedge out NOW (theta cliff).
REPAIR NOW — Structurally bad (HP ITM/tight or costly) AND ≤14d — roll HP DOWN today.
REPAIR SOON — Structurally bad AND ≤35d — roll HP DOWN this week.
ROLL NOW — Healthy fortress, HP ≤45d — roll the hedge OUT (maintain/raise strike).
REPAIR PLAN — Structurally bad but >35d runway — plan the roll-down, no rush.
LEAPS-ONLY — CSV-declared SP=0/HP=0 — intentional LC-only structure, no hedge to roll.
OK — Healthy structure with ample HP runway — no action.
REPAIR = roll HP down to a cheaper OTM strike (structure is hurting). ROLL = roll HP out/up to a later expiry (structure is healthy, hedge just expiring).

Fortress Position Overview

FORTRESSSTOCKLCSPHPSC BE‑SS CC‑SS GAPRMHP OTM%STATUSCTRSICNOTIONALURGENCY
Main (...1299)14 fortress(es) · 4 actionable · IC $1,234,550 · notional $3,360,540
GLD →
+320C −450P +330P −413C
$382.05 320450 330413 $456.00 $469.14 1201.88x 13.6% SAFE 10 $136,000$382,050 ROLL NOW (45d)
MU (Main) →
+880C −1010P +340P −1125C
$1048.44 8801010 3401125 $1028.60 $1038.93 6705.51x 67.6% SAFE 5 $74,300$524,220 ROLL NOW (45d)
BMNR (Main) →
+25C −18P +45P
$25.96 2518 450 $65.83 $60.70 01.00x -73.3% ITM 50 $204,150$129,800 REPAIR PLAN (101d)
IREN (Main) →
+25C −47P +35P −60C
$41.59 2547 3560 $44.00 $48.79 121.75x 15.8% SAFE 20 $32,000$83,170 REPAIR PLAN (101d)
IGV
+70C −115C
$111.12 700 0115 $96.50 $87.80 01.00x 0.0% N/A 12 $31,800$133,344 LEAPS-ONLY
MARA (Main)
+13C
$10.99 130 00 $16.75 $11.36 01.00x 0.0% N/A 400 $150,000$439,600 LEAPS-ONLY
AMD
+410C −550P +470P −685C
$650.08 410550 470685 $649.20 $658.62 801.33x 27.7% SAFE 2 $47,840$130,016 OK
BMNR (Main)
+23C −18P +25P
$25.96 2318 250 $53.26 $47.31 01.00x 3.7% TIGHT 75 $226,950$194,700 OK
COIN (Main)
+165C −240P +90P −210C
$185.41 165240 90210 $210.90 $212.60 1509.93x 51.5% SAFE 8 $13,440$148,328 OK
COIN (Main)
+500C −330P +300P −210C
$185.41 500330 300210 $563.00 $377.50 301.48x -61.8% ITM 25 $157,500$463,525 OK
DELL
+310C −400P +320P −650C
$575.38 310400 320650 $562.50 $570.20 801.32x 44.4% SAFE 3 $75,750$172,612 OK
GLXY
+38C −38P +18P −24C
$22.07 3838 1824 $39.71 $35.23 2010.05x 20.7% SAFE 125 $27,625$275,875 OK
HIMS
+10C −20P +5P −32C
$29.30 1020 532 $17.47 $18.82 154.04x 82.9% SAFE 15 $7,395$43,950 OK
NVDA
+215C −225P +200P −250C
$239.35 215225 200250 $264.80 $230.35 251.50x 16.4% SAFE 10 $49,800$239,350 OK
Neville (...0865)10 fortress(es) · 4 actionable · IC $441,025 · notional $2,315,459
CRWV →
+105C −120P +40P −100C
$91.78 105120 40100 $125.45 $128.28 804.91x 56.4% SAFE 5 $10,225$45,890 ROLL NOW (45d)
IREN (Neville) →
+45C −65P +21P −45C
$41.59 4565 2145 $56.50 $57.89 4415.67x 49.5% SAFE 20 $6,000$83,170 ROLL NOW (45d)
MU (Neville) →
+970C −1110P +390P −1150C
$1048.44 9701110 3901150 $1220.00 $1228.15 7203.88x 62.8% SAFE 2 $50,000$209,688 ROLL NOW (45d)
SNDK →
+1200C −1380P +810P −1760C
$1661.05 12001380 8101760 $1620.00 $1624.91 5702.36x 51.2% SAFE 1 $42,000$166,105 ROLL NOW (45d)
SPY
+640C −800C
$779.48 6400 0800 $764.00 $703.01 01.00x 0.0% N/A 12 $148,800$935,376 LEAPS-ONLY
CRCL
+45C −65P +40P −91C
$84.41 4565 4091 $87.00 $90.66 251.60x 52.6% SAFE 5 $21,000$42,205 OK
GOOG (Neville)
+300C −345P +310P −360C
$344.97 300345 310360 $373.00 $345.70 351.48x 10.1% SAFE 15 $109,500$517,455 OK
GOOG (Neville)
+340C −405P +360P −360C
$344.97 340405 360360 $398.00 $385.72 451.88x -4.4% ITM 5 $25,500$172,485 OK
INTC
+85C −100P +35P −123C
$113.30 85100 35123 $114.00 $115.25 653.24x 69.1% SAFE 5 $14,500$56,650 OK
SPCX
+150C −195P +135P −195C
$172.87 150195 135195 $186.00 $189.67 603.22x 21.9% SAFE 5 $13,500$86,435 OK
RetireInc (...7291)9 fortress(es) · 3 actionable · IC $180,200 · notional $1,092,978
AAPL →
+240C −330P +285P −340C
$334.14 240330 285340 $334.64 $336.89 451.48x 14.7% SAFE 5 $47,320$167,070 ROLL NOW (45d)
APP →
+460C −540P +185P −300C
$279.37 460540 185300 $588.00 $612.88 3553.77x 33.8% SAFE 1 $12,800$27,937 ROLL NOW (45d)
IREN (RetireInc) →
+50C −70P +23P −45C
$41.59 5070 2345 $63.43 $66.26 477.86x 44.7% SAFE 20 $13,700$83,170 ROLL NOW (45d)
MARA (RetireInc)
+40C
$10.99 400 00 $41.04 $11.85 01.00x 0.0% N/A 500 $52,000$549,500 LEAPS-ONLY
CLSK
+17C −17P +10P
$12.21 1717 100 $20.74 $18.29 72.87x 18.1% SAFE 25 $9,350$30,512 OK
ENPH
+45C −60P +20P
$33.88 4560 200 $56.15 $58.28 406.48x 41.0% SAFE 10 $7,300$33,880 OK
MSTR (RetireInc)
+125C −185P +55P −170C
$164.43 125185 55170 $161.00 $163.24 13011.83x 66.6% SAFE 4 $4,800$65,772 OK
QCOM
+190C −210P +100P −220C
$180.74 190210 100220 $224.00 $227.13 1104.24x 44.7% SAFE 5 $17,000$90,370 OK
RKLB
+115C −135P +45P −90C
$74.61 115135 4590 $141.55 $147.57 904.39x 39.7% SAFE 6 $15,930$44,766 OK
Joint (...1782)8 fortress(es) · 2 actionable · IC $490,588 · notional $1,464,325
AMZN →
+200C −250P +215P −275C
$256.32 200250 215275 $267.92 $271.23 351.52x 16.1% SAFE 5 $33,960$128,160 REPAIR PLAN (45d)
IREN (Joint) →
+25C −47P +35P −60C
$41.59 2547 3560 $44.00 $48.79 121.75x 15.8% SAFE 20 $32,000$83,170 REPAIR PLAN (101d)
GOOG (Joint)
+310C −355C
$344.97 3100 0355 $392.50 $349.74 01.00x 0.0% N/A 5 $41,250$172,485 LEAPS-ONLY
IBIT
+75C
$48.44 750 00 $70.58 $52.91 01.00x 0.0% N/A 50 $22,328$242,200 LEAPS-ONLY
MSTR (Joint)
+180C −200C
$164.43 1800 0200 $233.00 $172.14 01.00x 0.0% N/A 10 $53,000$164,430 LEAPS-ONLY
BMNR (Joint)
+23C −18P +25P
$25.96 2318 250 $36.42 $24.86 01.00x 3.7% TIGHT 150 $201,300$389,400 OK
COPX
+65C −90P +68P −89C
$86.26 6590 6889 $93.40 $96.47 221.77x 21.2% SAFE 20 $56,800$172,520 OK
HOOD
+65C −95P +80P −120C
$111.96 6595 80120 $114.95 $120.07 151.30x 28.5% SAFE 10 $49,950$111,960 OK
Main (...1299)14 fortress(es) · 4 actionable · overview rows

GLD: HP 330P Maintenance Roll-Out · exp Nov 20 '26, 45d

RELAXED PASS — no candidate met the standard constraints. Widened cost cap 25% → 50% of CC to surface the best available option below. Treat as a guideline breach, not a clean repair.
Stock: $382.05 Current HP: 330P (45d, 13.6% OTM) Current hedge: $5,191/yr Current ML: $256,000 If HP lapses: ML $586,000 (+$330,000) Account: Main (...1299) Contracts: 10 (1,000 sh) CC income: $21,734/yr Cost cap: 50% of CC = $10,867/yr IV: MEDIUM 17 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 330 → 330P (Dec 18 '26, 73d, 13.6% OTM) | Cost: $6,600/yr (30% of CC) | New ML: $256,000 = ML | Roll DEBIT $720 | Margin: n/a (RTH)
PROTECTIVE PICK (lowest ML within cost cap): HP 330 → 340P (Dec 18 '26, 73d, 11.0% OTM) | Cost: $10,100/yr (46% of CC) | New ML: $246,000 ↓ $10,000 | Roll DEBIT $1,420 | Margin: n/a (RTH)
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 330 CHEAP Dec 18 73d 13.6% $1.26 $1.32 $6,600 30% $256,000 = D $720
2 330 Dec 31 86d 13.6% $1.52 $1.64 $6,960 32% $256,000 = D $1,040
3 330 Jan 15 101d 13.6% $1.95 $2.03 $7,336 34% $256,000 = D $1,430
4 331 Jan 15 101d 13.4% $2.03 $2.11 $7,625 35% $255,000 -$1,000 D $1,510
5 332 Jan 15 101d 13.1% $2.11 $2.19 $7,914 36% $254,000 -$2,000 D $1,590
6 335 Dec 18 73d 12.3% $1.57 $1.63 $8,150 37% $251,000 -$5,000 D $1,030
7 333 Jan 15 101d 12.8% $2.19 $2.27 $8,203 38% $253,000 -$3,000 D $1,670
8 335 Dec 31 86d 12.3% $1.87 $1.99 $8,446 39% $251,000 -$5,000 D $1,390
9 334 Jan 15 101d 12.6% $2.25 $2.36 $8,529 39% $252,000 -$4,000 D $1,760
10 335 Jan 15 101d 12.3% $2.35 $2.46 $8,890 41% $251,000 -$5,000 D $1,860
11 336 Jan 15 101d 12.1% $2.44 $2.55 $9,215 42% $250,000 -$6,000 D $1,950
12 337 Jan 15 101d 11.8% $2.54 $2.67 $9,649 44% $249,000 -$7,000 D $2,070
▶ 13 340 PROT Dec 18 73d 11.0% $1.99 $2.02 $10,100 46% $246,000 -$10,000 D $1,420
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $469 — assignment locks a loss · $394, B $5.15 $59,806/yr $6,600/yr SELF-FUNDING
CC at MID $394 0.5σ, B $5.15 $59,806/yr $6,600/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($394, bid $5.15). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

MU (Main): HP 340P Maintenance Roll-Out · exp Nov 20 '26, 45d

Stock: $1048.44 Current HP: 340P (45d, 67.6% OTM) Current hedge: $892/yr Current ML: $409,300 If HP lapses: ML $579,300 (+$170,000) Account: Main (...1299) Contracts: 5 (500 sh) CC income: $453,804/yr Cost cap: 25% of CC = $113,451/yr IV: HIGH 126 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 340 → 370P (Dec 18 '26, 73d, 64.7% OTM) | Cost: $875/yr (0% of CC) | New ML: $394,300 ↓ $15,000 | Roll DEBIT $170 | Margin (TIMS): $65,539
PROTECTIVE PICK (lowest ML within cost cap): HP 340 → 960P (Jan 15 '27, 101d, 8.4% OTM) | Cost: $103,718/yr (23% of CC) | New ML: $99,300 ↓ $310,000 | Roll DEBIT $28,695 | Margin (TIMS): $22,602
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 370 CHEAP Dec 18 73d 64.7% $0.13 $0.35 $875 0% $394,300 -$15,000 D $170
2 360 Dec 18 73d 65.7% $0.27 $0.40 $1,000 0% $399,300 -$10,000 D $195
3 400 Dec 18 73d 61.8% $0.39 $0.50 $1,250 0% $379,300 -$30,000 D $245
4 370 Jan 15 101d 64.7% $0.25 $0.77 $1,391 0% $394,300 -$15,000 D $380
5 350 Jan 15 101d 66.6% $0.12 $0.80 $1,446 0% $404,300 -$5,000 D $395
6 380 Jan 15 101d 63.8% $0.36 $0.82 $1,482 0% $389,300 -$20,000 D $405
7 380 Dec 18 73d 63.8% $0.25 $0.60 $1,500 0% $389,300 -$20,000 D $295
8 420 Dec 18 73d 59.9% $0.14 $0.60 $1,500 0% $369,300 -$40,000 D $295
9 390 Jan 15 101d 62.8% $0.36 $0.87 $1,572 0% $384,300 -$25,000 D $430
10 390 Dec 18 73d 62.8% $0.23 $0.64 $1,600 0% $384,300 -$25,000 D $315
11 430 Dec 18 73d 59.0% $0.11 $0.67 $1,675 0% $364,300 -$45,000 D $330
12 340 Dec 18 73d 67.6% $0.19 $0.68 $1,700 0% $409,300 = D $335
▶ 13 960 PROT Jan 15 101d 8.4% $55.20 $57.40 $103,718 23% $99,300 -$310,000 D $28,695
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $1040, B $58.30 $338,516/yr $875/yr SELF-FUNDING
CC at MID $1125 0.6σ, B $25.85 $150,097/yr $875/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($1040, bid $58.30). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

BMNR (Main): HP 45P Roll-Down · exp Jan 15 '27, 101d

Stock: $25.96 HP: ITM Current hedge: $354,158/yr Baseline: current hedge (no same-strike quote) SS: $65.83 (unchanged) Account: Main (...1299) Contracts: 50 (5,000 sh) CC income: $76,329/yr IV: HIGH OTM floor: 8% Stress: 23% DD Payback gate: 12mo (1.0yr) 4 PASS ⚠ ER 2026-11-20 INTRADAY (45d) inside new HP tenor
RECOMMENDED: Roll HP 45 → 22 (Jan 15, 101d) | Save $318,020/yr | Payback N/A hedge only, N/A w/income (gate: 12mo (1.0yr)) | HP moves to 13.3% OTM | RM 1.00x → 0.89x | Margin (TIMS): $357
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 22 Jan 15 101d 13.3% $2.00 $16.60 $83,000 $36,139 $47,161 $318,020 -4 $-22,500 N/A N/A 0.89x PASS
2 21 Jan 15 101d 19.1% $1.45 $17.15 $85,750 $26,200 $59,809 $327,958 -3 $-15,000 N/A N/A 0.93x PASS
3 20 Jan 15 101d 23.0% $1.20 $17.40 $87,000 $21,683 $66,134 $332,475 -2 $-10,000 N/A N/A 0.95x PASS
4 19 Jan 15 101d 26.8% $0.93 $17.67 $88,350 $16,804 $56,918 $337,354 -1 $-5,000 N/A N/A 0.98x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $61 — assignment locks a loss · $35, B $0.30 $17,419/yr $36,139/yr DEFICIT $1,560/mo
CC at MID $30 0.7σ, B $0.92 $53,419/yr $36,139/yr SELF-FUNDING
AT 23% DRAWDOWN (stock $25.96 → $20.04, hedge $47,161/yr)
CC at SS income stress-adjusted $17,419/yr $47,161/yr DEFICIT $2,478/mo
CC at MID income stress-adjusted $17,419/yr $47,161/yr DEFICIT $2,478/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($30, bid $0.92) in NORMAL markets. Self-funds today.
In 23% drawdown, even MID is short ~$2,478/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.

IREN (Main): HP 35P Roll-Down · exp Jan 15 '27, 101d

Stock: $41.59 HP: 15.8% OTM Current hedge: $23,851/yr Baseline (roll-fwd, savings vs this): $23,851/yr SS: $44.00 (unchanged) Account: Main (...1299) Contracts: 20 (2,000 sh) CC income: $64,049/yr IV: HIGH OTM floor: 8% Stress: 22% DD Payback gate: 12mo (1.0yr) 2 PASS ⚠ ER 2026-11-05 INTRADAY (30d) inside new HP tenor
RECOMMENDED: Roll HP 35 → 32 (Jan 15, 101d) | Save $7,950/yr | Payback 9mo (0.75yr) hedge only, 1mo (0.08yr) w/income (gate: 12mo (1.0yr)) | HP moves to 23.0% OTM | RM 1.75x → 1.94x | Margin: n/a (RTH)
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 32 Jan 15 101d 23.0% $2.20 $0.80 $1,600 $15,901 $41,198 $7,950 15 $6,000 9mo 1mo 1.94x PASS
2 30 Jan 15 101d 27.9% $1.65 $1.35 $2,700 $11,926 $29,995 $11,926 17 $10,000 10mo 2mo 2.06x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $49, B $1.36 $31,587/yr $15,901/yr SELF-FUNDING
CC at MID $48 0.7σ, B $1.50 $34,839/yr $15,901/yr SELF-FUNDING
AT 22% DRAWDOWN (stock $41.59 → $32.41, hedge $41,198/yr)
CC at SS income stress-adjusted $7,897/yr $41,198/yr DEFICIT $2,775/mo
CC at MID income stress-adjusted $7,897/yr $41,198/yr DEFICIT $2,775/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($48, bid $1.50) in NORMAL markets. Self-funds today.
In 22% drawdown, even MID is short ~$2,775/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.
Neville (...0865)10 fortress(es) · 4 actionable · overview rows

CRWV: HP 40P Maintenance Roll-Out · exp Nov 20 '26, 45d

Stock: $91.78 Current HP: 40P (45d, 56.4% OTM) Current hedge: $243/yr Current ML: $50,225 If HP lapses: ML $70,225 (+$20,000) Account: Neville (...0865) Contracts: 5 (500 sh) CC income: $35,296/yr Cost cap: 25% of CC = $8,824/yr IV: HIGH 24 qualifying ⚠ ER 2026-11-11 INTRADAY (36d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 40 → 40P (Dec 18 '26, 73d, 56.4% OTM) | Cost: $475/yr (1% of CC) | New ML: $50,225 = ML | Roll DEBIT $75 | Margin (TIMS): $2,285
PROTECTIVE PICK (lowest ML within cost cap): HP 40 → 70P (Jan 15 '27, 101d, 23.7% OTM) | Cost: $7,318/yr (21% of CC) | New ML: $35,225 ↓ $15,000 | Roll DEBIT $2,005 | Margin (TIMS): $2,196
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 40 CHEAP Dec 18 73d 56.4% $0.09 $0.19 $475 1% $50,225 = D $75
2 40 Jan 15 101d 56.4% $0.21 $0.30 $542 2% $50,225 = D $130
3 45 Dec 18 73d 51.0% $0.19 $0.28 $700 2% $47,725 -$2,500 D $120
4 45 Jan 15 101d 51.0% $0.29 $0.44 $795 2% $47,725 -$2,500 D $200
5 42 Jan 15 101d 53.7% $0.23 $0.50 $903 3% $48,975 -$1,250 D $230
6 48 Dec 18 73d 48.2% $0.29 $0.39 $975 3% $46,475 -$3,750 D $175
7 42 Dec 18 73d 53.7% $0.09 $0.41 $1,025 3% $48,975 -$1,250 D $185
8 50 Dec 18 73d 45.5% $0.39 $0.47 $1,175 3% $45,225 -$5,000 D $215
9 48 Jan 15 101d 48.2% $0.52 $0.80 $1,446 4% $46,475 -$3,750 D $380
10 50 Jan 15 101d 45.5% $0.68 $0.95 $1,717 5% $45,225 -$5,000 D $455
11 52 Jan 15 101d 42.8% $0.88 $0.99 $1,789 5% $43,975 -$6,250 D $475
12 55 Jan 15 101d 40.1% $1.13 $1.22 $2,204 6% $42,725 -$7,500 D $590
▶ 13 70 PROT Jan 15 101d 23.7% $3.75 $4.05 $7,318 21% $35,225 -$15,000 D $2,005
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $130, B $0.65 $3,774/yr $475/yr SELF-FUNDING
CC at MID $105 0.7σ, B $3.40 $19,742/yr $475/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($130, bid $0.65). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

IREN (Neville): HP 21P Maintenance Roll-Out · exp Nov 20 '26, 45d

Stock: $41.59 Current HP: 21P (45d, 49.5% OTM) Current hedge: $2,109/yr Current ML: $94,000 If HP lapses: ML $136,000 (+$42,000) Account: Neville (...0865) Contracts: 20 (2,000 sh) CC income: $53,477/yr Cost cap: 25% of CC = $13,369/yr IV: HIGH 8 qualifying ⚠ ER 2026-11-05 INTRADAY (30d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 21 → 22P (Dec 18 '26, 73d, 47.1% OTM) | Cost: $2,500/yr (5% of CC) | New ML: $92,000 ↓ $2,000 | Roll DEBIT $420 | Margin (TIMS): $2,096
PROTECTIVE PICK (lowest ML within cost cap): HP 21 → 30P (Dec 18 '26, 73d, 27.9% OTM) | Cost: $11,300/yr (21% of CC) | New ML: $76,000 ↓ $18,000 | Roll DEBIT $2,180 | Margin (TIMS): $1,741
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 22 CHEAP Dec 18 73d 47.1% $0.20 $0.25 $2,500 5% $92,000 -$2,000 D $420
2 22 Jan 15 101d 47.1% $0.30 $0.48 $3,469 6% $92,000 -$2,000 D $880
3 25 Dec 18 73d 39.9% $0.38 $0.43 $4,300 8% $86,000 -$8,000 D $780
4 25 Jan 15 101d 39.9% $0.65 $0.80 $5,782 11% $86,000 -$8,000 D $1,520
5 27 Dec 18 73d 35.1% $0.55 $0.82 $8,200 15% $82,000 -$12,000 D $1,560
6 27 Jan 15 101d 35.1% $0.84 $1.31 $9,468 18% $82,000 -$12,000 D $2,540
▶ 7 30 PROT Dec 18 73d 27.9% $0.97 $1.13 $11,300 21% $76,000 -$18,000 D $2,180
8 30 Jan 15 101d 27.9% $1.50 $1.65 $11,926 22% $76,000 -$18,000 D $3,220
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $58, B $0.35 $8,129/yr $2,500/yr SELF-FUNDING
CC at MID $48 0.7σ, B $1.50 $34,839/yr $2,500/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($58, bid $0.35). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

MU (Neville): HP 390P Maintenance Roll-Out · exp Nov 20 '26, 45d

Stock: $1048.44 Current HP: 390P (45d, 62.8% OTM) Current hedge: $730/yr Current ML: $194,000 If HP lapses: ML $272,000 (+$78,000) Account: Neville (...0865) Contracts: 2 (200 sh) CC income: $69,361/yr Cost cap: 25% of CC = $17,340/yr IV: HIGH 93 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 390 → 400P (Dec 18 '26, 73d, 61.8% OTM) | Cost: $500/yr (1% of CC) | New ML: $192,000 ↓ $2,000 | Roll DEBIT $98 | Margin (TIMS): $54,089
PROTECTIVE PICK (lowest ML within cost cap): HP 390 → 850P (Dec 18 '26, 73d, 18.9% OTM) | Cost: $15,500/yr (22% of CC) | New ML: $102,000 ↓ $92,000 | Roll DEBIT $3,098 | Margin (TIMS): $18,989
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 400 CHEAP Dec 18 73d 61.8% $0.39 $0.50 $500 1% $192,000 -$2,000 D $98
2 420 Dec 18 73d 59.9% $0.14 $0.60 $600 1% $188,000 -$6,000 D $118
3 390 Jan 15 101d 62.8% $0.36 $0.87 $629 1% $194,000 = D $172
4 390 Dec 18 73d 62.8% $0.23 $0.64 $640 1% $194,000 = D $126
5 430 Dec 18 73d 59.0% $0.11 $0.67 $670 1% $186,000 -$8,000 D $132
6 410 Jan 15 101d 60.9% $0.46 $1.08 $781 1% $190,000 -$4,000 D $214
7 400 Jan 15 101d 61.8% $0.50 $1.10 $795 1% $192,000 -$2,000 D $218
8 410 Dec 18 73d 60.9% $0.11 $0.85 $850 1% $190,000 -$4,000 D $168
9 420 Jan 15 101d 59.9% $0.53 $1.18 $853 1% $188,000 -$6,000 D $234
10 440 Dec 18 73d 58.0% $0.31 $0.88 $880 1% $184,000 -$10,000 D $174
11 450 Dec 18 73d 57.1% $0.46 $0.89 $890 1% $182,000 -$12,000 D $176
12 430 Jan 15 101d 59.0% $0.82 $1.24 $896 1% $186,000 -$8,000 D $246
▶ 13 850 PROT Dec 18 73d 18.9% $14.70 $15.50 $15,500 22% $102,000 -$92,000 D $3,098
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $1,228 — assignment locks a loss · $1125, B $25.85 $60,039/yr $500/yr SELF-FUNDING
CC at MID $1125 0.6σ, B $25.85 $60,039/yr $500/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($1125, bid $25.85). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

SNDK: HP 810P Maintenance Roll-Out · exp Nov 20 '26, 45d

Stock: $1661.05 Current HP: 810P (45d, 51.2% OTM) Current hedge: $2,190/yr Current ML: $99,000 If HP lapses: ML $180,000 (+$81,000) Account: Neville (...0865) Contracts: 1 (100 sh) CC income: $192,223/yr Cost cap: 25% of CC = $48,056/yr IV: HIGH 138 qualifying ⚠ ER 2026-10-29 AMC (23d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 810 → 810P (Dec 18 '26, 73d, 51.2% OTM) | Cost: $1,025/yr (1% of CC) | New ML: $99,000 = ML | Roll DEBIT $205 | Margin (TIMS): $88,475
PROTECTIVE PICK (lowest ML within cost cap): HP 810 → 1380P (Jan 15 '27, 101d, 16.9% OTM) | Cost: $27,285/yr (14% of CC) | New ML: $42,000 ↓ $57,000 | Roll DEBIT $7,550 | Margin (TIMS): $39,914
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 810 CHEAP Dec 18 73d 51.2% $0.65 $2.05 $1,025 1% $99,000 = D $205
2 850 Dec 18 73d 48.8% $1.60 $2.20 $1,100 1% $95,000 -$4,000 D $220
3 820 Dec 18 73d 50.6% $0.25 $2.40 $1,200 1% $98,000 -$1,000 D $240
4 840 Jan 15 101d 49.4% $2.00 $3.80 $1,373 1% $96,000 -$3,000 D $380
5 860 Dec 18 73d 48.2% $1.00 $3.00 $1,500 1% $94,000 -$5,000 D $300
6 880 Dec 18 73d 47.0% $1.15 $3.00 $1,500 1% $92,000 -$7,000 D $300
7 890 Dec 18 73d 46.4% $1.80 $3.30 $1,650 1% $91,000 -$8,000 D $330
8 850 Jan 15 101d 48.8% $2.65 $4.80 $1,735 1% $95,000 -$4,000 D $480
9 870 Dec 18 73d 47.6% $1.25 $3.50 $1,750 1% $93,000 -$6,000 D $350
10 820 Jan 15 101d 50.6% $0.05 $5.10 $1,843 1% $98,000 -$1,000 D $510
11 900 Jan 15 101d 45.8% $4.40 $5.10 $1,843 1% $90,000 -$9,000 D $510
12 860 Jan 15 101d 48.2% $2.65 $5.20 $1,879 1% $94,000 -$5,000 D $520
▶ 13 1380 PROT Jan 15 101d 16.9% $70.10 $75.50 $27,285 14% $42,000 -$57,000 D $7,550
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $1630, B $132.70 $154,103/yr $1,025/yr SELF-FUNDING
CC at MID $1725 0.2σ, B $91.60 $106,374/yr $1,025/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($1630, bid $132.70). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.
RetireInc (...7291)9 fortress(es) · 3 actionable · overview rows

AAPL: HP 285P Maintenance Roll-Out · exp Nov 20 '26, 45d

Stock: $334.14 Current HP: 285P (45d, 14.7% OTM) Current hedge: $4,177/yr Current ML: $69,820 If HP lapses: ML $212,320 (+$142,500) Account: RetireInc (...7291) Contracts: 5 (500 sh) CC income: $40,537/yr Cost cap: 25% of CC = $10,134/yr IV: MEDIUM 8 qualifying ⚠ ER 2026-10-29 AMC (23d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 285 → 285P (Dec 18 '26, 73d, 14.7% OTM) | Cost: $5,200/yr (13% of CC) | New ML: $69,820 = ML | Roll DEBIT $560 | Margin (TIMS): $5,891
PROTECTIVE PICK (lowest ML within cost cap): HP 285 → 300P (Jan 15 '27, 101d, 10.2% OTM) | Cost: $9,486/yr (23% of CC) | New ML: $62,320 ↓ $7,500 | Roll DEBIT $2,145 | Margin (TIMS): $5,126
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 285 CHEAP Dec 18 73d 14.7% $1.95 $2.08 $5,200 13% $69,820 = D $560
2 285 Jan 15 101d 14.7% $2.82 $3.05 $5,511 14% $69,820 = D $1,045
3 290 Dec 18 73d 13.2% $2.36 $2.51 $6,275 15% $67,320 -$2,500 D $775
4 290 Jan 15 101d 13.2% $3.50 $3.65 $6,595 16% $67,320 -$2,500 D $1,345
5 295 Jan 15 101d 11.7% $4.15 $4.35 $7,860 19% $64,820 -$5,000 D $1,695
6 295 Dec 18 73d 11.7% $2.99 $3.15 $7,875 19% $64,820 -$5,000 D $1,095
▶ 7 300 PROT Jan 15 101d 10.2% $5.00 $5.25 $9,486 23% $62,320 -$7,500 D $2,145
8 300 Dec 18 73d 10.2% $3.65 $3.80 $9,500 23% $62,320 -$7,500 D $1,420
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $340, B $7.50 $43,548/yr $5,200/yr SELF-FUNDING
CC at MID $350 0.6σ, B $4.30 $24,968/yr $5,200/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($340, bid $7.50). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

APP: HP 185P Maintenance Roll-Out · exp Nov 20 '26, 45d

Stock: $279.37 Current HP: 185P (45d, 33.8% OTM) Current hedge: $1,217/yr Current ML: $48,300 If HP lapses: ML $66,800 (+$18,500) Account: RetireInc (...7291) Contracts: 1 (100 sh) CC income: $14,963/yr Cost cap: 25% of CC = $3,741/yr IV: HIGH 10 qualifying ⚠ ER 2026-11-04 INTRADAY (29d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 185 → 185P (Jan 15 '27, 101d, 33.8% OTM) | Cost: $1,662/yr (11% of CC) | New ML: $48,300 = ML | Roll DEBIT $395 | Margin (TIMS): $9,586
PROTECTIVE PICK (lowest ML within cost cap): HP 185 → 210P (Jan 15 '27, 101d, 24.8% OTM) | Cost: $3,397/yr (23% of CC) | New ML: $45,800 ↓ $2,500 | Roll DEBIT $875 | Margin (TIMS): $9,010
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 185 CHEAP Jan 15 101d 33.8% $3.10 $4.60 $1,662 11% $48,300 = D $395
2 185 Dec 18 73d 33.8% $1.95 $3.70 $1,850 12% $48,300 = D $305
3 190 Dec 18 73d 32.0% $2.35 $4.20 $2,100 14% $47,800 -$500 D $355
4 190 Jan 15 101d 32.0% $4.10 $5.90 $2,132 14% $47,800 -$500 D $525
5 195 Dec 18 73d 30.2% $3.00 $4.60 $2,300 15% $47,300 -$1,000 D $395
6 200 Dec 18 73d 28.4% $4.00 $5.00 $2,500 17% $46,800 -$1,500 D $435
7 200 Jan 15 101d 28.4% $5.60 $7.00 $2,530 17% $46,800 -$1,500 D $635
8 195 Jan 15 101d 30.2% $4.40 $7.20 $2,602 17% $47,300 -$1,000 D $655
▶ 9 210 PROT Jan 15 101d 24.8% $7.20 $9.40 $3,397 23% $45,800 -$2,500 D $875
10 210 Dec 18 73d 24.8% $4.50 $6.90 $3,450 23% $45,800 -$2,500 D $625
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $613 — assignment locks a loss · $370, B $1.65 $1,916/yr $1,662/yr SELF-FUNDING
CC at MID $315 0.6σ, B $8.00 $9,290/yr $1,662/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($370, bid $1.65). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

IREN (RetireInc): HP 23P Maintenance Roll-Out · exp Nov 20 '26, 45d

Stock: $41.59 Current HP: 23P (45d, 44.7% OTM) Current hedge: $2,758/yr Current ML: $107,700 If HP lapses: ML $153,700 (+$46,000) Account: RetireInc (...7291) Contracts: 20 (2,000 sh) CC income: $53,477/yr Cost cap: 25% of CC = $13,369/yr IV: HIGH 6 qualifying ⚠ ER 2026-11-05 INTRADAY (30d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 23 → 25P (Dec 18 '26, 73d, 39.9% OTM) | Cost: $4,300/yr (8% of CC) | New ML: $103,700 ↓ $4,000 | Roll DEBIT $700 | Margin (TIMS): $2,022
PROTECTIVE PICK (lowest ML within cost cap): HP 23 → 30P (Dec 18 '26, 73d, 27.9% OTM) | Cost: $11,300/yr (21% of CC) | New ML: $93,700 ↓ $14,000 | Roll DEBIT $2,100 | Margin (TIMS): $1,751
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 25 CHEAP Dec 18 73d 39.9% $0.38 $0.43 $4,300 8% $103,700 -$4,000 D $700
2 25 Jan 15 101d 39.9% $0.65 $0.80 $5,782 11% $103,700 -$4,000 D $1,440
3 27 Dec 18 73d 35.1% $0.55 $0.82 $8,200 15% $99,700 -$8,000 D $1,480
4 27 Jan 15 101d 35.1% $0.84 $1.31 $9,468 18% $99,700 -$8,000 D $2,460
▶ 5 30 PROT Dec 18 73d 27.9% $0.97 $1.13 $11,300 21% $93,700 -$14,000 D $2,100
6 30 Jan 15 101d 27.9% $1.50 $1.65 $11,926 22% $93,700 -$14,000 D $3,140
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $66 — assignment locks a loss · $60, B $0.34 $7,897/yr $4,300/yr SELF-FUNDING
CC at MID $48 0.7σ, B $1.50 $34,839/yr $4,300/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($60, bid $0.34). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.
Joint (...1782)8 fortress(es) · 2 actionable · overview rows

AMZN: HP 215P Roll-Down · exp Nov 20 '26, 45d

RELAXED PASS — no candidate met the standard constraints. Widened gap-mult 2.0x → 8.0x; payback gate 1.0yr → 3.0yr to surface the best available option below. Treat as a guideline breach, not a clean repair.
Stock: $256.32 HP: 16.1% OTM Current hedge: $6,692/yr Baseline (roll-fwd, savings vs this): $6,600/yr SS: $267.92 (unchanged) Account: Joint (...1782) Contracts: 5 (500 sh) CC income: $24,331/yr IV: MEDIUM OTM floor: 10% Stress: 12% DD Payback gate: 12mo (1.0yr) 5 PASS ⚠ ER 2026-10-29 AMC (23d) inside new HP tenor
RECOMMENDED: Roll HP 215 → 210 (Jan 15, 101d) | Save $1,197/yr | Payback 25mo (2.09yr) hedge only, 1mo (0.10yr) w/income (gate: 12mo (1.0yr)) | HP moves to 18.1% OTM | RM 1.52x → 1.59x | Margin (TIMS): $4,464
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 210 Jan 15 101d 18.1% $2.99 $-1.45 $-725 $5,403 $11,835 $1,197 40 $2,500 25mo 1mo 1.59x PASS
2 205 Jan 15 101d 20.0% $2.35 $-0.81 $-405 $4,246 $9,486 $2,354 45 $5,000 25mo 2mo 1.66x PASS
3 200 Jan 15 101d 22.0% $1.98 $-0.44 $-220 $3,578 $7,589 $3,022 50 $7,500 30mo 3mo 1.74x PASS
4 195 Jan 15 101d 23.9% $1.61 $-0.07 $-35 $2,909 $6,144 $3,691 55 $10,000 33mo 4mo 1.81x PASS
5 190 Jan 15 101d 25.9% $1.27 $0.27 $135 $2,295 $4,770 $4,305 60 $12,500 35mo 5mo 1.88x PASS
6 180 Jan 15 101d 29.8% $0.87 $0.67 $335 $1,572 $2,981 $5,028 70 $17,500 42mo 7mo 2.03x FAIL
7 185 Jan 15 101d 27.8% $1.14 $0.40 $200 $2,060 $3,795 $4,540 65 $15,000 40mo 6mo 1.96x FAIL
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $275, B $5.10 $29,613/yr $5,403/yr SELF-FUNDING
CC at MID $275 0.6σ, B $5.10 $29,613/yr $5,403/yr SELF-FUNDING
AT 12% DRAWDOWN (stock $256.32 → $226.77, hedge $11,835/yr)
CC at SS income stress-adjusted $3,310/yr $11,835/yr DEFICIT $710/mo
CC at MID income stress-adjusted $3,310/yr $11,835/yr DEFICIT $710/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($275, bid $5.10) in NORMAL markets. Self-funds today.
In 12% drawdown, even MID is short ~$710/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.

IREN (Joint): HP 35P Roll-Down · exp Jan 15 '27, 101d

Stock: $41.59 HP: 15.8% OTM Current hedge: $23,851/yr Baseline (roll-fwd, savings vs this): $23,851/yr SS: $44.00 (unchanged) Account: Joint (...1782) Contracts: 20 (2,000 sh) CC income: $64,049/yr IV: HIGH OTM floor: 8% Stress: 22% DD Payback gate: 12mo (1.0yr) 2 PASS ⚠ ER 2026-11-05 INTRADAY (30d) inside new HP tenor
RECOMMENDED: Roll HP 35 → 32 (Jan 15, 101d) | Save $7,950/yr | Payback 9mo (0.75yr) hedge only, 1mo (0.08yr) w/income (gate: 12mo (1.0yr)) | HP moves to 23.0% OTM | RM 1.75x → 1.94x | Margin (TIMS): $1,586
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 32 Jan 15 101d 23.0% $2.20 $0.80 $1,600 $15,901 $41,198 $7,950 15 $6,000 9mo 1mo 1.94x PASS
2 30 Jan 15 101d 27.9% $1.65 $1.35 $2,700 $11,926 $29,995 $11,926 17 $10,000 10mo 2mo 2.06x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (31d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $49, B $1.36 $31,587/yr $15,901/yr SELF-FUNDING
CC at MID $48 0.7σ, B $1.50 $34,839/yr $15,901/yr SELF-FUNDING
AT 22% DRAWDOWN (stock $41.59 → $32.41, hedge $41,198/yr)
CC at SS income stress-adjusted $7,897/yr $41,198/yr DEFICIT $2,775/mo
CC at MID income stress-adjusted $7,897/yr $41,198/yr DEFICIT $2,775/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($48, bid $1.50) in NORMAL markets. Self-funds today.
In 22% drawdown, even MID is short ~$2,775/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.

HP roll-downs do not change Safe Strike. SS = Max(LC+ND, (LC+SP+ND)/2). HP is not in the formula.

Monthly hedge cost prorated: (30/DTE) × (Ask × Shares). Payback = ML increase / Annual savings.

EST = ask price estimated as mid × 1.10 (10% safety buffer). Verify with live prices before executing.

Always prefer longest viable DTE for repair rolls (fewer rolls/yr = lower annual cost).