GENERATED2026-10-08 03:53
FORTRESS REPAIRHP Roll-Down Analysis
Payback gate: 12mo (1.0yr)
SS = Max(LC+ND, (LC+SP+ND)/2)
TOTAL HEDGE (CURRENT)
$455,978/yr
TOTAL HEDGE (REPAIRED)
$87,162/yr
ANNUAL SAVINGS
$368,816/yr
ROLL CREDITS
$94,780
ADDITIONAL MAX LOSS
$-5,500
PORTFOLIO ACTION SUMMARY · 41 positions
9 · ROLL NOW5 · REPAIR PLAN7 · LEAPS-ONLY20 · OK
Click any ticker row below to jump to its analysis section.
What do these actions mean? (legend)
NO HEDGE — No HP leg at all — naked synthetic long, no catastrophic protection.
ROLL IMMEDIATELY — Healthy fortress, HP expires ≤14d — roll the hedge out NOW (theta cliff).
REPAIR NOW — Structurally bad (HP ITM/tight or costly) AND ≤14d — roll HP DOWN today.
REPAIR SOON — Structurally bad AND ≤35d — roll HP DOWN this week.
ROLL NOW — Healthy fortress, HP ≤45d — roll the hedge OUT (maintain/raise strike).
REPAIR PLAN — Structurally bad but >35d runway — plan the roll-down, no rush.
LEAPS-ONLY — CSV-declared SP=0/HP=0 — intentional LC-only structure, no hedge to roll.
OK — Healthy structure with ample HP runway — no action.
REPAIR = roll HP down to a cheaper OTM strike (structure is hurting). ROLL = roll HP out/up to a later expiry (structure is healthy, hedge just expiring).

Fortress Position Overview

FORTRESSSTOCKLCSPHPSC BE‑SS CC‑SS GAPRMHP OTM%STATUSCTRSICNOTIONALURGENCY
Main (...1299)14 fortress(es) · 4 actionable · IC $1,234,550 · notional $3,284,514
GLD →
+320C −450P +330P −409C
$376.02 320450 330409 $456.00 $470.01 1201.88x 12.2% SAFE 10 $136,000$376,020 ROLL NOW (44d)
MU (Main) →
+880C −1010P +340P −1150C
$1085.40 8801010 3401150 $1028.60 $1042.15 6705.51x 68.7% SAFE 5 $74,300$542,701 ROLL NOW (44d)
BMNR (Main) →
+25C −18P +45P
$24.50 2518 450 $65.83 $60.11 01.00x -83.6% ITM 50 $204,150$122,525 REPAIR PLAN (100d)
IREN (Main) →
+25C −47P +35P −49C
$38.59 2547 3549 $44.00 $48.72 121.75x 9.3% OK 20 $32,000$77,190 REPAIR PLAN (100d)
IGV
+70C −115C
$109.84 700 0115 $96.50 $87.80 01.00x 0.0% N/A 12 $31,800$131,814 LEAPS-ONLY
MARA (Main)
+13C
$10.36 130 00 $16.75 $11.53 01.00x 0.0% N/A 400 $150,000$414,200 LEAPS-ONLY
AMD
+410C −550P +470P −685C
$645.61 410550 470685 $649.20 $661.41 801.33x 27.2% SAFE 2 $47,840$129,122 OK
BMNR (Main)
+23C −18P +25P
$24.50 2318 250 $53.26 $47.38 01.00x -2.0% ITM 75 $226,950$183,788 OK
COIN (Main)
+165C −240P +90P −200C
$177.46 165240 90200 $210.90 $214.26 1509.93x 49.3% SAFE 8 $13,440$141,964 OK
COIN (Main)
+500C −330P +300P −200C
$177.46 500330 300200 $563.00 $384.26 301.48x -69.1% ITM 25 $157,500$443,638 OK
DELL
+310C −400P +320P −650C
$579.80 310400 320650 $562.50 $570.67 801.32x 44.8% SAFE 3 $75,750$173,940 OK
GLXY
+38C −38P +18P −23C
$21.29 3838 1823 $39.71 $35.72 2010.05x 17.8% SAFE 125 $27,625$266,062 OK
HIMS
+10C −20P +5P −32C
$29.62 1020 532 $17.47 $18.66 154.04x 83.1% SAFE 15 $7,395$44,430 OK
NVDA
+215C −225P +200P −250C
$237.12 215225 200250 $264.80 $230.43 251.50x 15.7% SAFE 10 $49,800$237,120 OK
Neville (...0865)10 fortress(es) · 4 actionable · IC $441,025 · notional $2,317,433
CRWV →
+105C −120P +40P −100C
$88.52 105120 40100 $125.45 $128.65 804.91x 54.8% SAFE 5 $10,225$44,260 ROLL NOW (44d)
IREN (Neville) →
+45C −65P +21P −49C
$38.59 4565 2149 $56.50 $57.83 4415.67x 45.6% SAFE 20 $6,000$77,190 ROLL NOW (44d)
MU (Neville) →
+970C −1110P +390P −1150C
$1085.40 9701110 3901150 $1220.00 $1229.59 7203.88x 64.1% SAFE 2 $50,000$217,080 ROLL NOW (44d)
SNDK →
+1200C −1380P +810P −1900C
$1701.01 12001380 8101900 $1620.00 $1623.90 5702.36x 52.4% SAFE 1 $42,000$170,101 ROLL NOW (44d)
SPY
+640C −800C
$777.32 6400 0800 $764.00 $703.41 01.00x 0.0% N/A 12 $148,800$932,784 LEAPS-ONLY
CRCL
+45C −65P +40P
$80.89 4565 400 $87.00 $93.16 251.60x 50.6% SAFE 5 $21,000$40,445 OK
GOOG (Neville)
+300C −345P +310P −360C
$347.37 300345 310360 $373.00 $348.27 351.48x 10.8% SAFE 15 $109,500$521,055 OK
GOOG (Neville)
+340C −405P +360P −360C
$347.37 340405 360360 $398.00 $386.27 451.88x -3.6% ITM 5 $25,500$173,685 OK
INTC
+85C −100P +35P −123C
$113.33 85100 35123 $114.00 $115.82 653.24x 69.1% SAFE 5 $14,500$56,665 OK
SPCX
+150C −195P +135P −195C
$168.34 150195 135195 $186.00 $190.26 603.22x 19.8% SAFE 5 $13,500$84,168 OK
Joint (...1782)8 fortress(es) · 3 actionable · IC $490,588 · notional $1,413,100
AMZN →
+200C −250P +215P −275C
$259.71 200250 215275 $267.92 $271.46 351.52x 17.2% SAFE 5 $33,960$129,855 REPAIR PLAN (44d)
HOOD →
+65C −95P +80P −120C
$109.27 6595 80120 $114.95 $119.80 151.30x 26.8% SAFE 10 $49,950$109,265 REPAIR PLAN (100d)
IREN (Joint) →
+25C −47P +35P −49C
$38.59 2547 3549 $44.00 $48.72 121.75x 9.3% OK 20 $32,000$77,190 REPAIR PLAN (100d)
GOOG (Joint)
+310C −355C
$347.37 3100 0355 $392.50 $350.42 01.00x 0.0% N/A 5 $41,250$173,685 LEAPS-ONLY
IBIT
+75C
$47.18 750 00 $70.58 $52.83 01.00x 0.0% N/A 50 $22,328$235,900 LEAPS-ONLY
MSTR (Joint)
+180C −200C
$152.63 1800 0200 $233.00 $173.56 01.00x 0.0% N/A 10 $53,000$152,630 LEAPS-ONLY
BMNR (Joint)
+23C −18P +25P
$24.50 2318 250 $36.42 $24.94 01.00x -2.0% ITM 150 $201,300$367,575 OK
COPX
+65C −90P +68P −89C
$83.50 6590 6889 $93.40 $96.35 221.77x 18.6% SAFE 20 $56,800$167,000 OK
RetireInc (...7291)9 fortress(es) · 3 actionable · IC $180,200 · notional $1,046,159
AAPL →
+240C −330P +285P −340C
$336.19 240330 285340 $334.64 $337.29 451.48x 15.2% SAFE 5 $47,320$168,095 ROLL NOW (44d)
APP →
+460C −540P +185P −300C
$280.48 460540 185300 $588.00 $611.15 3553.77x 34.0% SAFE 1 $12,800$28,048 ROLL NOW (44d)
IREN (RetireInc) →
+50C −70P +23P −49C
$38.59 5070 2349 $63.43 $66.50 477.86x 40.4% SAFE 20 $13,700$77,190 ROLL NOW (44d)
MARA (RetireInc)
+40C
$10.36 400 00 $41.04 $11.78 01.00x 0.0% N/A 500 $52,000$517,750 LEAPS-ONLY
CLSK
+17C −17P +10P
$11.54 1717 100 $20.74 $18.41 72.87x 13.4% SAFE 25 $9,350$28,861 OK
ENPH
+45C −60P +20P
$33.24 4560 200 $56.15 $58.85 406.48x 39.8% SAFE 10 $7,300$33,245 OK
MSTR (RetireInc)
+125C −185P +55P −170C
$152.63 125185 55170 $161.00 $162.72 13011.83x 64.0% SAFE 4 $4,800$61,052 OK
QCOM
+190C −210P +100P −220C
$177.10 190210 100220 $224.00 $227.35 1104.24x 43.5% SAFE 5 $17,000$88,550 OK
RKLB
+115C −135P +45P −90C
$72.28 115135 4590 $141.55 $147.77 904.39x 37.7% SAFE 6 $15,930$43,368 OK
Main (...1299)14 fortress(es) · 4 actionable · overview rows

GLD: HP 330P Maintenance Roll-Out · exp Nov 20 '26, 44d

RELAXED PASS — no candidate met the standard constraints. Widened cost cap 25% → 50% of CC to surface the best available option below. Treat as a guideline breach, not a clean repair.
Stock: $376.02 Current HP: 330P (44d, 12.2% OTM) Current hedge: $7,134/yr Current ML: $256,000 If HP lapses: ML $586,000 (+$330,000) Account: Main (...1299) Contracts: 10 (1,000 sh) CC income: $29,277/yr Cost cap: 50% of CC = $14,639/yr IV: MEDIUM 13 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 330 → 330P (Dec 18 '26, 72d, 12.2% OTM) | Cost: $8,567/yr (29% of CC) | New ML: $256,000 = ML | Roll DEBIT $870 | Margin: n/a (RTH)
PROTECTIVE PICK (lowest ML within cost cap): HP 330 → 338P (Jan 15 '27, 100d, 10.1% OTM) | Cost: $12,775/yr (44% of CC) | New ML: $248,000 ↓ $8,000 | Roll DEBIT $2,680 | Margin: n/a (RTH)
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 330 CHEAP Dec 18 72d 12.2% $1.63 $1.69 $8,567 29% $256,000 = D $870
2 330 Dec 31 85d 12.2% $1.94 $2.03 $8,717 30% $256,000 = D $1,210
3 330 Jan 15 100d 12.2% $2.41 $2.52 $9,198 31% $256,000 = D $1,700
4 331 Jan 15 100d 12.0% $2.52 $2.63 $9,600 33% $255,000 -$1,000 D $1,810
5 332 Jan 15 100d 11.7% $2.62 $2.73 $9,964 34% $254,000 -$2,000 D $1,910
6 333 Jan 15 100d 11.4% $2.72 $2.84 $10,366 35% $253,000 -$3,000 D $2,020
7 335 Dec 18 72d 10.9% $1.95 $2.09 $10,595 36% $251,000 -$5,000 D $1,270
8 335 Dec 31 85d 10.9% $2.40 $2.50 $10,735 37% $251,000 -$5,000 D $1,680
9 334 Jan 15 100d 11.2% $2.83 $2.95 $10,768 37% $252,000 -$4,000 D $2,130
10 335 Jan 15 100d 10.9% $2.95 $3.10 $11,315 39% $251,000 -$5,000 D $2,280
11 336 Jan 15 100d 10.6% $3.05 $3.20 $11,680 40% $250,000 -$6,000 D $2,380
12 337 Jan 15 100d 10.4% $3.20 $3.35 $12,228 42% $249,000 -$7,000 D $2,530
▶ 13 338 PROT Jan 15 100d 10.1% $3.30 $3.50 $12,775 44% $248,000 -$8,000 D $2,680
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $470 — assignment locks a loss · $388, B $4.95 $59,400/yr $8,567/yr SELF-FUNDING
CC at MID $388 0.5σ, B $4.95 $59,400/yr $8,567/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($388, bid $4.95). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

MU (Main): HP 340P Maintenance Roll-Out · exp Nov 20 '26, 44d

Stock: $1085.40 Current HP: 340P (44d, 68.7% OTM) Current hedge: $830/yr Current ML: $409,300 If HP lapses: ML $579,300 (+$170,000) Account: Main (...1299) Contracts: 5 (500 sh) CC income: $708,919/yr Cost cap: 25% of CC = $177,230/yr IV: HIGH 132 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 340 → 350P (Dec 18 '26, 72d, 67.8% OTM) | Cost: $811/yr (0% of CC) | New ML: $404,300 ↓ $5,000 | Roll DEBIT $155 | Margin (TIMS): $70,061
PROTECTIVE PICK (lowest ML within cost cap): HP 340 → 990P (Jan 15 '27, 100d, 8.8% OTM) | Cost: $109,865/yr (15% of CC) | New ML: $84,300 ↓ $325,000 | Roll DEBIT $30,095 | Margin (TIMS): $23,519
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 350 CHEAP Dec 18 72d 67.8% $0.25 $0.32 $811 0% $404,300 -$5,000 D $155
2 360 Jan 15 100d 66.8% $0.28 $0.70 $1,278 0% $399,300 -$10,000 D $345
3 400 Dec 18 72d 63.1% $0.31 $0.52 $1,318 0% $379,300 -$30,000 D $255
4 350 Jan 15 100d 67.8% $0.30 $0.77 $1,405 0% $404,300 -$5,000 D $380
5 360 Dec 18 72d 66.8% $0.27 $0.60 $1,521 0% $399,300 -$10,000 D $295
6 380 Dec 18 72d 65.0% $0.25 $0.60 $1,521 0% $389,300 -$20,000 D $295
7 420 Dec 18 72d 61.3% $0.29 $0.65 $1,648 0% $369,300 -$40,000 D $320
8 340 Dec 18 72d 68.7% $0.19 $0.66 $1,673 0% $409,300 = D $325
9 380 Jan 15 100d 65.0% $0.51 $0.92 $1,679 0% $389,300 -$20,000 D $455
10 340 Jan 15 100d 68.7% $0.17 $0.98 $1,788 0% $409,300 = D $485
11 390 Jan 15 100d 64.1% $0.42 $0.99 $1,807 0% $384,300 -$25,000 D $490
12 370 Dec 18 72d 65.9% $0.12 $0.73 $1,850 0% $394,300 -$15,000 D $360
▶ 13 990 PROT Jan 15 100d 8.8% $58.85 $60.20 $109,865 15% $84,300 -$325,000 D $30,095
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $1065, B $69.50 $417,000/yr $811/yr SELF-FUNDING
CC at MID $1170 0.6σ, B $27.70 $166,200/yr $811/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($1065, bid $69.50). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

BMNR (Main): HP 45P Roll-Down · exp Jan 15 '27, 100d

Stock: $24.50 HP: ITM Current hedge: $382,338/yr Baseline: current hedge (no same-strike quote) SS: $65.83 (unchanged) Account: Main (...1299) Contracts: 50 (5,000 sh) CC income: $78,648/yr IV: HIGH OTM floor: 8% Stress: 23% DD Payback gate: 12mo (1.0yr) 5 PASS ⚠ ER 2026-11-20 INTRADAY (44d) inside new HP tenor
RECOMMENDED: Roll HP 45 → 22 (Jan 15, 100d) | Save $340,362/yr | Payback N/A hedge only, N/A w/income (gate: 12mo (1.0yr)) | HP moves to 8.2% OTM | RM 1.00x → 0.89x | Margin (TIMS): $263
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 22 Jan 15 100d 8.2% $2.30 $18.10 $90,500 $41,975 $33,854 $340,362 -4 $-22,500 N/A N/A 0.89x PASS
2 21 Jan 15 100d 14.3% $1.69 $18.71 $93,550 $30,842 $43,891 $351,495 -3 $-15,000 N/A N/A 0.93x PASS
3 20 Jan 15 100d 18.4% $1.34 $19.06 $95,300 $24,455 $50,279 $357,882 -2 $-10,000 N/A N/A 0.95x PASS
4 19 Jan 15 100d 22.5% $1.06 $19.34 $96,700 $19,345 $56,666 $362,992 -1 $-5,000 N/A N/A 0.98x PASS
5 18 Jan 15 100d 26.5% $0.80 $19.60 $98,000 $14,600 $55,662 $367,738 0 $0 N/A N/A 1.00x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $60 — assignment locks a loss · $35, B $0.16 $9,600/yr $41,975/yr DEFICIT $2,698/mo
CC at MID $28 0.6σ, B $0.87 $52,200/yr $41,975/yr SELF-FUNDING
AT 23% DRAWDOWN (stock $24.50 → $18.82, hedge $33,854/yr)
CC at SS income stress-adjusted $9,600/yr $33,854/yr DEFICIT $2,021/mo
CC at MID income stress-adjusted $9,600/yr $33,854/yr DEFICIT $2,021/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($28, bid $0.87) in NORMAL markets. Self-funds today.
In 23% drawdown, even MID is short ~$2,021/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.

IREN (Main): HP 35P Roll-Down · exp Jan 15 '27, 100d

Stock: $38.59 HP: 9.3% OTM Current hedge: $29,930/yr Baseline (roll-fwd, savings vs this): $29,930/yr SS: $44.00 (unchanged) Account: Main (...1299) Contracts: 20 (2,000 sh) CC income: $58,745/yr IV: HIGH OTM floor: 8% Stress: 22% DD Payback gate: 12mo (1.0yr) 2 PASS ⚠ ER 2026-11-05 INTRADAY (29d) inside new HP tenor
RECOMMENDED: Roll HP 35 → 32 (Jan 15, 100d) | Save $9,271/yr | Payback 8mo (0.65yr) hedge only, 1mo (0.09yr) w/income (gate: 12mo (1.0yr)) | HP moves to 17.1% OTM | RM 1.75x → 1.94x | Margin: n/a (RTH)
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 32 Jan 15 100d 17.1% $2.83 $1.17 $2,340 $20,659 $31,718 $9,271 15 $6,000 8mo 1mo 1.94x PASS
2 30 Jan 15 100d 22.3% $2.15 $1.85 $3,700 $15,695 $37,558 $14,235 17 $10,000 8mo 2mo 2.06x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $49, B $0.70 $16,800/yr $20,659/yr DEFICIT $322/mo
CC at MID $44 0.6σ, B $1.50 $36,000/yr $20,659/yr SELF-FUNDING
AT 22% DRAWDOWN (stock $38.59 → $30.04, hedge $31,718/yr)
CC at SS income stress-adjusted $3,840/yr $31,718/yr DEFICIT $2,323/mo
CC at MID income stress-adjusted $3,840/yr $31,718/yr DEFICIT $2,323/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($44, bid $1.50) in NORMAL markets. Self-funds today.
In 22% drawdown, even MID is short ~$2,323/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.
Neville (...0865)10 fortress(es) · 4 actionable · overview rows

CRWV: HP 40P Maintenance Roll-Out · exp Nov 20 '26, 44d

Stock: $88.52 Current HP: 40P (44d, 54.8% OTM) Current hedge: $456/yr Current ML: $50,225 If HP lapses: ML $70,225 (+$20,000) Account: Neville (...0865) Contracts: 5 (500 sh) CC income: $33,136/yr Cost cap: 25% of CC = $8,284/yr IV: HIGH 23 qualifying ⚠ ER 2026-11-11 INTRADAY (35d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 40 → 40P (Dec 18 '26, 72d, 54.8% OTM) | Cost: $507/yr (2% of CC) | New ML: $50,225 = ML | Roll DEBIT $80 | Margin: n/a (RTH)
PROTECTIVE PICK (lowest ML within cost cap): HP 40 → 70P (Jan 15 '27, 100d, 20.9% OTM) | Cost: $8,121/yr (25% of CC) | New ML: $35,225 ↓ $15,000 | Roll DEBIT $2,205 | Margin: n/a (RTH)
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 40 CHEAP Dec 18 72d 54.8% $0.08 $0.20 $507 2% $50,225 = D $80
2 40 Jan 15 100d 54.8% $0.16 $0.30 $548 2% $50,225 = D $130
3 45 Dec 18 72d 49.2% $0.18 $0.29 $735 2% $47,725 -$2,500 D $125
4 42 Dec 18 72d 52.0% $0.05 $0.32 $811 2% $48,975 -$1,250 D $140
5 42 Jan 15 100d 52.0% $0.24 $0.49 $894 3% $48,975 -$1,250 D $225
6 48 Dec 18 72d 46.3% $0.24 $0.42 $1,065 3% $46,475 -$3,750 D $190
7 45 Jan 15 100d 49.2% $0.35 $0.61 $1,113 3% $47,725 -$2,500 D $285
8 48 Jan 15 100d 46.3% $0.52 $0.78 $1,424 4% $46,475 -$3,750 D $370
9 50 Dec 18 72d 43.5% $0.33 $0.59 $1,495 5% $45,225 -$5,000 D $275
10 50 Jan 15 100d 43.5% $0.75 $0.95 $1,734 5% $45,225 -$5,000 D $455
11 52 Jan 15 100d 40.7% $0.88 $1.18 $2,154 6% $43,975 -$6,250 D $570
12 55 Dec 18 72d 37.9% $0.74 $0.89 $2,256 7% $42,725 -$7,500 D $425
▶ 13 70 PROT Jan 15 100d 20.9% $4.30 $4.45 $8,121 25% $35,225 -$15,000 D $2,205
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $130, B $0.35 $2,100/yr $507/yr SELF-FUNDING
CC at MID $100 0.6σ, B $3.15 $18,900/yr $507/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($130, bid $0.35). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

IREN (Neville): HP 21P Maintenance Roll-Out · exp Nov 20 '26, 44d

Stock: $38.59 Current HP: 21P (44d, 45.6% OTM) Current hedge: $1,659/yr Current ML: $94,000 If HP lapses: ML $136,000 (+$42,000) Account: Neville (...0865) Contracts: 20 (2,000 sh) CC income: $58,745/yr Cost cap: 25% of CC = $14,686/yr IV: HIGH 6 qualifying ⚠ ER 2026-11-05 INTRADAY (29d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 21 → 22P (Dec 18 '26, 72d, 43.0% OTM) | Cost: $3,244/yr (6% of CC) | New ML: $92,000 ↓ $2,000 | Roll DEBIT $520 | Margin: n/a (RTH)
PROTECTIVE PICK (lowest ML within cost cap): HP 21 → 27P (Dec 18 '26, 72d, 30.0% OTM) | Cost: $8,821/yr (15% of CC) | New ML: $82,000 ↓ $12,000 | Roll DEBIT $1,620 | Margin: n/a (RTH)
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 22 CHEAP Dec 18 72d 43.0% $0.26 $0.32 $3,244 6% $92,000 -$2,000 D $520
2 22 Jan 15 100d 43.0% $0.32 $0.58 $4,234 7% $92,000 -$2,000 D $1,040
3 25 Dec 18 72d 35.2% $0.53 $0.58 $5,881 10% $86,000 -$8,000 D $1,040
4 25 Jan 15 100d 35.2% $0.90 $0.93 $6,789 12% $86,000 -$8,000 D $1,740
▶ 5 27 PROT Dec 18 72d 30.0% $0.78 $0.87 $8,821 15% $82,000 -$12,000 D $1,620
6 27 Jan 15 100d 30.0% $1.29 $1.65 $12,045 21% $82,000 -$12,000 D $3,180
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $58 — assignment locks a loss · $57, B $0.16 $3,840/yr $3,244/yr SELF-FUNDING
CC at MID $44 0.6σ, B $1.50 $36,000/yr $3,244/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($57, bid $0.16). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

MU (Neville): HP 390P Maintenance Roll-Out · exp Nov 20 '26, 44d

Stock: $1085.40 Current HP: 390P (44d, 64.1% OTM) Current hedge: $747/yr Current ML: $194,000 If HP lapses: ML $272,000 (+$78,000) Account: Neville (...0865) Contracts: 2 (200 sh) CC income: $84,941/yr Cost cap: 25% of CC = $21,235/yr IV: HIGH 101 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 390 → 400P (Dec 18 '26, 72d, 63.1% OTM) | Cost: $527/yr (1% of CC) | New ML: $192,000 ↓ $2,000 | Roll DEBIT $102 | Margin (TIMS): $68,443
PROTECTIVE PICK (lowest ML within cost cap): HP 390 → 890P (Dec 18 '26, 72d, 18.0% OTM) | Cost: $20,176/yr (24% of CC) | New ML: $94,000 ↓ $100,000 | Roll DEBIT $3,978 | Margin (TIMS): $29,828
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 400 CHEAP Dec 18 72d 63.1% $0.31 $0.52 $527 1% $192,000 -$2,000 D $102
2 420 Dec 18 72d 61.3% $0.29 $0.65 $659 1% $188,000 -$6,000 D $128
3 390 Jan 15 100d 64.1% $0.42 $0.99 $723 1% $194,000 = D $196
4 410 Dec 18 72d 62.2% $0.24 $0.78 $791 1% $190,000 -$4,000 D $154
5 400 Jan 15 100d 63.1% $0.50 $1.11 $810 1% $192,000 -$2,000 D $220
6 430 Dec 18 72d 60.4% $0.33 $0.80 $811 1% $186,000 -$8,000 D $158
7 440 Dec 18 72d 59.5% $0.22 $0.85 $862 1% $184,000 -$10,000 D $168
8 450 Dec 18 72d 58.5% $0.25 $0.86 $872 1% $182,000 -$12,000 D $170
9 390 Dec 18 72d 64.1% $0.14 $0.91 $923 1% $194,000 = D $180
10 410 Jan 15 100d 62.2% $0.41 $1.31 $956 1% $190,000 -$4,000 D $260
11 490 Dec 18 72d 54.9% $0.50 $1.00 $1,014 1% $174,000 -$20,000 D $198
12 430 Jan 15 100d 60.4% $0.50 $1.41 $1,029 1% $186,000 -$8,000 D $280
▶ 13 890 PROT Dec 18 72d 18.0% $17.95 $19.90 $20,176 24% $94,000 -$100,000 D $3,978
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $1,230 — assignment locks a loss · $1170, B $27.70 $66,480/yr $527/yr SELF-FUNDING
CC at MID $1170 0.6σ, B $27.70 $66,480/yr $527/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($1170, bid $27.70). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

SNDK: HP 810P Maintenance Roll-Out · exp Nov 20 '26, 44d

Stock: $1701.01 Current HP: 810P (44d, 52.4% OTM) Current hedge: $3,567/yr Current ML: $99,000 If HP lapses: ML $180,000 (+$81,000) Account: Neville (...0865) Contracts: 1 (100 sh) CC income: $252,822/yr Cost cap: 25% of CC = $63,205/yr IV: HIGH 147 qualifying ⚠ ER 2026-10-29 AMC (22d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 810 → 850P (Dec 18 '26, 72d, 50.0% OTM) | Cost: $1,267/yr (1% of CC) | New ML: $95,000 ↓ $4,000 | Roll DEBIT $250 | Margin (TIMS): $99,840
PROTECTIVE PICK (lowest ML within cost cap): HP 810 → 1380P (Jan 15 '27, 100d, 18.9% OTM) | Cost: $25,586/yr (10% of CC) | New ML: $42,000 ↓ $57,000 | Roll DEBIT $7,010 | Margin (TIMS): $54,128
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 850 CHEAP Dec 18 72d 50.0% $1.60 $2.50 $1,267 1% $95,000 -$4,000 D $250
2 820 Jan 15 100d 51.8% $1.65 $4.80 $1,752 1% $98,000 -$1,000 D $480
3 830 Jan 15 100d 51.2% $1.80 $4.90 $1,789 1% $97,000 -$2,000 D $490
4 840 Jan 15 100d 50.6% $2.60 $4.90 $1,789 1% $96,000 -$3,000 D $490
5 850 Jan 15 100d 50.0% $3.10 $5.10 $1,861 1% $95,000 -$4,000 D $510
6 880 Dec 18 72d 48.3% $1.00 $3.70 $1,876 1% $92,000 -$7,000 D $370
7 950 Dec 18 72d 44.2% $2.10 $4.00 $2,028 1% $85,000 -$14,000 D $400
8 860 Jan 15 100d 49.4% $3.10 $5.60 $2,044 1% $94,000 -$5,000 D $560
9 870 Jan 15 100d 48.9% $3.20 $5.60 $2,044 1% $93,000 -$6,000 D $560
10 900 Jan 15 100d 47.1% $4.30 $5.80 $2,117 1% $90,000 -$9,000 D $580
11 900 Dec 18 72d 47.1% $1.10 $4.30 $2,180 1% $90,000 -$9,000 D $430
12 880 Jan 15 100d 48.3% $3.00 $6.00 $2,190 1% $92,000 -$7,000 D $600
▶ 13 1380 PROT Jan 15 100d 18.9% $64.70 $70.10 $25,586 10% $42,000 -$57,000 D $7,010
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $1670, B $139.60 $167,520/yr $1,267/yr SELF-FUNDING
CC at MID $1765 0.2σ, B $99.70 $119,640/yr $1,267/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($1670, bid $139.60). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.
Joint (...1782)8 fortress(es) · 3 actionable · overview rows

AMZN: HP 215P Roll-Down · exp Nov 20 '26, 44d

RELAXED PASS — no candidate met the standard constraints. Widened gap-mult 2.0x → 8.0x; payback gate 1.0yr → 3.0yr to surface the best available option below. Treat as a guideline breach, not a clean repair.
Stock: $259.71 HP: 17.2% OTM Current hedge: $5,641/yr Baseline (roll-fwd, savings vs this): $5,840/yr SS: $267.92 (unchanged) Account: Joint (...1782) Contracts: 5 (500 sh) CC income: $22,756/yr IV: MEDIUM OTM floor: 10% Stress: 12% DD Payback gate: 12mo (1.0yr) 3 PASS ⚠ ER 2026-10-29 AMC (22d) inside new HP tenor
RECOMMENDED: Roll HP 215 → 205 (Jan 15, 100d) | Save $1,971/yr | Payback 30mo (2.54yr) hedge only, 2mo (0.20yr) w/income (gate: 12mo (1.0yr)) | HP moves to 21.1% OTM | RM 1.52x → 1.66x | Margin (TIMS): $4,598
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 205 Jan 15 100d 21.1% $2.12 $-0.80 $-400 $3,869 $8,395 $1,971 45 $5,000 30mo 2mo 1.66x PASS
2 210 Jan 15 100d 19.1% $2.66 $-1.34 $-670 $4,854 $13,231 $986 40 $2,500 30mo 1mo 1.59x PASS
3 200 Jan 15 100d 23.0% $1.75 $-0.43 $-215 $3,194 $6,752 $2,646 50 $7,500 34mo 4mo 1.74x PASS
4 185 Jan 15 100d 28.8% $1.04 $0.28 $140 $1,898 $3,303 $3,942 65 $15,000 46mo 7mo 1.96x FAIL
5 190 Jan 15 100d 26.8% $1.19 $0.13 $65 $2,172 $4,307 $3,668 60 $12,500 41mo 6mo 1.88x FAIL
6 195 Jan 15 100d 24.9% $1.45 $-0.13 $-65 $2,646 $5,311 $3,194 55 $10,000 38mo 5mo 1.81x FAIL
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $275, B $6.15 $36,900/yr $3,869/yr SELF-FUNDING
CC at MID $280 0.7σ, B $4.90 $29,400/yr $3,869/yr SELF-FUNDING
AT 12% DRAWDOWN (stock $259.71 → $229.20, hedge $8,395/yr)
CC at SS income stress-adjusted $5,280/yr $8,395/yr DEFICIT $260/mo
CC at MID income stress-adjusted $3,720/yr $8,395/yr DEFICIT $390/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($280, bid $4.90) in NORMAL markets. Self-funds today.
In 12% drawdown, even MID is short ~$390/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.

HOOD: HP 80P Roll-Down · exp Jan 15 '27, 100d (no viable candidates)

Stock: $109.27 Current HP: 80P (100d, 26.8% OTM) Current hedge: $8,140/yr Gap: 15 Account: Joint (...1782) Contracts: 10 (1,000 sh) IV: HIGH
No HP candidates passed all filters. Reasons:
  • 12 candidate(s) priced

IREN (Joint): HP 35P Roll-Down · exp Jan 15 '27, 100d

Stock: $38.59 HP: 9.3% OTM Current hedge: $29,930/yr Baseline (roll-fwd, savings vs this): $29,930/yr SS: $44.00 (unchanged) Account: Joint (...1782) Contracts: 20 (2,000 sh) CC income: $58,745/yr IV: HIGH OTM floor: 8% Stress: 22% DD Payback gate: 12mo (1.0yr) 2 PASS ⚠ ER 2026-11-05 INTRADAY (29d) inside new HP tenor
RECOMMENDED: Roll HP 35 → 32 (Jan 15, 100d) | Save $9,271/yr | Payback 8mo (0.65yr) hedge only, 1mo (0.09yr) w/income (gate: 12mo (1.0yr)) | HP moves to 17.1% OTM | RM 1.75x → 1.94x | Margin (TIMS): $1,409
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 32 Jan 15 100d 17.1% $2.83 $1.17 $2,340 $20,659 $31,718 $9,271 15 $6,000 8mo 1mo 1.94x PASS
2 30 Jan 15 100d 22.3% $2.15 $1.85 $3,700 $15,695 $37,558 $14,235 17 $10,000 8mo 2mo 2.06x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $49, B $0.70 $16,800/yr $20,659/yr DEFICIT $322/mo
CC at MID $44 0.6σ, B $1.50 $36,000/yr $20,659/yr SELF-FUNDING
AT 22% DRAWDOWN (stock $38.59 → $30.04, hedge $31,718/yr)
CC at SS income stress-adjusted $3,840/yr $31,718/yr DEFICIT $2,323/mo
CC at MID income stress-adjusted $3,840/yr $31,718/yr DEFICIT $2,323/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($44, bid $1.50) in NORMAL markets. Self-funds today.
In 22% drawdown, even MID is short ~$2,323/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.
RetireInc (...7291)9 fortress(es) · 3 actionable · overview rows

AAPL: HP 285P Maintenance Roll-Out · exp Nov 20 '26, 44d

Stock: $336.19 Current HP: 285P (44d, 15.2% OTM) Current hedge: $4,231/yr Current ML: $69,820 If HP lapses: ML $212,320 (+$142,500) Account: RetireInc (...7291) Contracts: 5 (500 sh) CC income: $51,372/yr Cost cap: 25% of CC = $12,843/yr IV: MEDIUM 8 qualifying ⚠ ER 2026-11-02 INTRADAY (26d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 285 → 285P (Dec 18 '26, 72d, 15.2% OTM) | Cost: $4,841/yr (9% of CC) | New ML: $69,820 = ML | Roll DEBIT $550 | Margin (TIMS): $5,947
PROTECTIVE PICK (lowest ML within cost cap): HP 285 → 300P (Jan 15 '27, 100d, 10.8% OTM) | Cost: $8,760/yr (17% of CC) | New ML: $62,320 ↓ $7,500 | Roll DEBIT $1,995 | Margin (TIMS): $5,216
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 285 CHEAP Dec 18 72d 15.2% $1.75 $1.91 $4,841 9% $69,820 = D $550
2 285 Jan 15 100d 15.2% $2.63 $2.88 $5,256 10% $69,820 = D $1,035
3 290 Dec 18 72d 13.7% $2.19 $2.36 $5,982 12% $67,320 -$2,500 D $775
4 290 Jan 15 100d 13.7% $3.10 $3.45 $6,296 12% $67,320 -$2,500 D $1,320
5 295 Dec 18 72d 12.3% $2.73 $2.94 $7,452 15% $64,820 -$5,000 D $1,065
6 295 Jan 15 100d 12.3% $3.75 $4.15 $7,574 15% $64,820 -$5,000 D $1,670
▶ 7 300 PROT Jan 15 100d 10.8% $4.55 $4.80 $8,760 17% $62,320 -$7,500 D $1,995
8 300 Dec 18 72d 10.8% $3.30 $3.60 $9,125 18% $62,320 -$7,500 D $1,395
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $340, B $8.85 $53,100/yr $4,841/yr SELF-FUNDING
CC at MID $355 0.7σ, B $3.50 $21,000/yr $4,841/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($340, bid $8.85). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

APP: HP 185P Maintenance Roll-Out · exp Nov 20 '26, 44d

Stock: $280.48 Current HP: 185P (44d, 34.0% OTM) Current hedge: $1,535/yr Current ML: $48,300 If HP lapses: ML $66,800 (+$18,500) Account: RetireInc (...7291) Contracts: 1 (100 sh) CC income: $17,439/yr Cost cap: 25% of CC = $4,360/yr IV: HIGH 11 qualifying ⚠ ER 2026-11-04 INTRADAY (28d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 185 → 185P (Dec 18 '26, 72d, 34.0% OTM) | Cost: $1,673/yr (10% of CC) | New ML: $48,300 = ML | Roll DEBIT $240 | Margin (TIMS): $9,627
PROTECTIVE PICK (lowest ML within cost cap): HP 185 → 220P (Jan 15 '27, 100d, 21.6% OTM) | Cost: $4,052/yr (23% of CC) | New ML: $44,800 ↓ $3,500 | Roll DEBIT $1,020 | Margin (TIMS): $8,686
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 185 CHEAP Dec 18 72d 34.0% $1.70 $3.30 $1,673 10% $48,300 = D $240
2 185 Jan 15 100d 34.0% $2.75 $5.50 $2,008 12% $48,300 = D $460
3 190 Dec 18 72d 32.3% $2.10 $4.10 $2,078 12% $47,800 -$500 D $320
4 190 Jan 15 100d 32.3% $3.40 $6.10 $2,226 13% $47,800 -$500 D $520
5 195 Dec 18 72d 30.5% $2.65 $4.50 $2,281 13% $47,300 -$1,000 D $360
6 200 Dec 18 72d 28.7% $4.00 $4.70 $2,383 14% $46,800 -$1,500 D $380
7 200 Jan 15 100d 28.7% $5.60 $6.70 $2,446 14% $46,800 -$1,500 D $580
8 195 Jan 15 100d 30.5% $4.20 $6.90 $2,518 14% $47,300 -$1,000 D $600
9 210 Jan 15 100d 25.1% $6.80 $10.00 $3,650 21% $45,800 -$2,500 D $910
10 210 Dec 18 72d 25.1% $5.00 $7.20 $3,650 21% $45,800 -$2,500 D $630
▶ 11 220 PROT Jan 15 100d 21.6% $9.40 $11.10 $4,052 23% $44,800 -$3,500 D $1,020
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $611 — assignment locks a loss · $370, B $0.45 $540/yr $1,673/yr DEFICIT $94/mo
CC at MID $315 0.6σ, B $10.70 $12,840/yr $1,673/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at MID ($315, bid $10.70). Self-funds in BOTH normal and 0% drawdown. At SS the position bleeds, so don't drift too far OTM.

IREN (RetireInc): HP 23P Maintenance Roll-Out · exp Nov 20 '26, 44d

Stock: $38.59 Current HP: 23P (44d, 40.4% OTM) Current hedge: $2,820/yr Current ML: $107,700 If HP lapses: ML $153,700 (+$46,000) Account: RetireInc (...7291) Contracts: 20 (2,000 sh) CC income: $58,745/yr Cost cap: 25% of CC = $14,686/yr IV: HIGH 4 qualifying ⚠ ER 2026-11-05 INTRADAY (29d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 23 → 25P (Dec 18 '26, 72d, 35.2% OTM) | Cost: $5,881/yr (10% of CC) | New ML: $103,700 ↓ $4,000 | Roll DEBIT $940 | Margin (TIMS): $1,841
PROTECTIVE PICK (lowest ML within cost cap): HP 23 → 27P (Dec 18 '26, 72d, 30.0% OTM) | Cost: $8,821/yr (15% of CC) | New ML: $99,700 ↓ $8,000 | Roll DEBIT $1,520 | Margin (TIMS): $1,727
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 25 CHEAP Dec 18 72d 35.2% $0.53 $0.58 $5,881 10% $103,700 -$4,000 D $940
2 25 Jan 15 100d 35.2% $0.90 $0.93 $6,789 12% $103,700 -$4,000 D $1,640
▶ 3 27 PROT Dec 18 72d 30.0% $0.78 $0.87 $8,821 15% $99,700 -$8,000 D $1,520
4 27 Jan 15 100d 30.0% $1.29 $1.65 $12,045 21% $99,700 -$8,000 D $3,080
POST-REPAIR SUSTAINABILITY CC chain Nov 06 (30d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $66 — assignment locks a loss · $57, B $0.16 $3,840/yr $5,881/yr DEFICIT $170/mo
CC at MID $44 0.6σ, B $1.50 $36,000/yr $5,881/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at MID ($44, bid $1.50). Self-funds in BOTH normal and 0% drawdown. At SS the position bleeds, so don't drift too far OTM.

HP roll-downs do not change Safe Strike. SS = Max(LC+ND, (LC+SP+ND)/2). HP is not in the formula.

Monthly hedge cost prorated: (30/DTE) × (Ask × Shares). Payback = ML increase / Annual savings.

EST = ask price estimated as mid × 1.10 (10% safety buffer). Verify with live prices before executing.

Always prefer longest viable DTE for repair rolls (fewer rolls/yr = lower annual cost).