GENERATED2026-10-08 21:50
FORTRESS REPAIRHP Roll-Down Analysis
Payback gate: 12mo (1.0yr)
SS = Max(LC+ND, (LC+SP+ND)/2)
TOTAL HEDGE (CURRENT)
$476,812/yr
TOTAL HEDGE (REPAIRED)
$94,255/yr
ANNUAL SAVINGS
$382,557/yr
ROLL CREDITS
$101,195
ADDITIONAL MAX LOSS
$7,000
PORTFOLIO ACTION SUMMARY · 41 positions
9 · ROLL NOW5 · REPAIR PLAN7 · LEAPS-ONLY20 · OK
Click any ticker row below to jump to its analysis section.
What do these actions mean? (legend)
NO HEDGE — No HP leg at all — naked synthetic long, no catastrophic protection.
ROLL IMMEDIATELY — Healthy fortress, HP expires ≤14d — roll the hedge out NOW (theta cliff).
REPAIR NOW — Structurally bad (HP ITM/tight or costly) AND ≤14d — roll HP DOWN today.
REPAIR SOON — Structurally bad AND ≤35d — roll HP DOWN this week.
ROLL NOW — Healthy fortress, HP ≤45d — roll the hedge OUT (maintain/raise strike).
REPAIR PLAN — Structurally bad but >35d runway — plan the roll-down, no rush.
LEAPS-ONLY — CSV-declared SP=0/HP=0 — intentional LC-only structure, no hedge to roll.
OK — Healthy structure with ample HP runway — no action.
REPAIR = roll HP down to a cheaper OTM strike (structure is hurting). ROLL = roll HP out/up to a later expiry (structure is healthy, hedge just expiring).

Fortress Position Overview

FORTRESSSTOCKLCSPHPSC BE‑SS CC‑SS GAPRMHP OTM%STATUSCTRSICNOTIONALURGENCY
Main (...1299)14 fortress(es) · 4 actionable · IC $1,234,550 · notional $3,224,014
GLD →
+320C −450P +330P −409C
$378.38 320450 330409 $456.00 $470.89 1201.88x 12.8% SAFE 10 $136,000$378,380 ROLL NOW (43d)
MU (Main) →
+880C −1010P +340P −1150C
$1075.72 8801010 3401150 $1028.60 $1040.82 6705.51x 68.4% SAFE 5 $74,300$537,862 ROLL NOW (43d)
BMNR (Main) →
+25C −18P +45P
$23.84 2518 450 $65.83 $60.24 01.00x -88.7% ITM 50 $204,150$119,225 REPAIR PLAN (99d)
IREN (Main) →
+25C −47P +35P −49C
$37.03 2547 3549 $44.00 $48.42 121.75x 5.5% OK 20 $32,000$74,060 REPAIR PLAN (99d)
IGV
+70C −115C
$110.00 700 0115 $96.50 $87.83 01.00x 0.0% N/A 12 $31,800$131,994 LEAPS-ONLY
MARA (Main)
+13C
$9.93 130 00 $16.75 $11.33 01.00x 0.0% N/A 400 $150,000$397,000 LEAPS-ONLY
AMD
+410C −550P +470P −685C
$634.76 410550 470685 $649.20 $659.91 801.33x 26.0% SAFE 2 $47,840$126,952 OK
BMNR (Main)
+23C −18P +25P
$23.84 2318 250 $53.26 $47.30 01.00x -4.8% ITM 75 $226,950$178,838 OK
COIN (Main)
+165C −240P +90P −200C
$173.88 165240 90200 $210.90 $213.54 1509.93x 48.2% SAFE 8 $13,440$139,104 OK
COIN (Main)
+500C −330P +300P −200C
$173.88 500330 300200 $563.00 $381.06 301.48x -72.5% ITM 25 $157,500$434,700 OK
DELL
+310C −400P +320P −650C
$577.58 310400 320650 $562.50 $571.12 801.32x 44.6% SAFE 3 $75,750$173,274 OK
GLXY
+38C −38P +18P −23C
$20.43 3838 1823 $39.71 $35.33 2010.05x 14.3% SAFE 125 $27,625$255,375 OK
HIMS
+10C −20P +5P −32C
$28.67 1020 532 $17.47 $18.39 154.04x 82.6% SAFE 15 $7,395$43,005 OK
NVDA
+215C −225P +200P −250C
$234.25 215225 200250 $264.80 $229.91 251.50x 14.6% SAFE 10 $49,800$234,245 OK
Neville (...0865)10 fortress(es) · 4 actionable · IC $441,025 · notional $2,304,457
CRWV →
+105C −120P +40P −100C
$85.03 105120 40100 $125.45 $127.70 804.91x 53.0% SAFE 5 $10,225$42,515 ROLL NOW (43d)
IREN (Neville) →
+45C −65P +21P −49C
$37.03 4565 2149 $56.50 $57.80 4415.67x 43.3% SAFE 20 $6,000$74,060 ROLL NOW (43d)
MU (Neville) →
+970C −1110P +390P −1150C
$1075.72 9701110 3901150 $1220.00 $1228.79 7203.88x 63.7% SAFE 2 $50,000$215,145 ROLL NOW (43d)
SNDK →
+1200C −1380P +810P −1900C
$1652.60 12001380 8101900 $1620.00 $1627.09 5702.36x 51.0% SAFE 1 $42,000$165,260 ROLL NOW (43d)
SPY
+640C −800C
$775.03 6400 0800 $764.00 $703.74 01.00x 0.0% N/A 12 $148,800$930,036 LEAPS-ONLY
CRCL
+45C −65P +40P
$79.13 4565 400 $87.00 $90.06 251.60x 49.4% SAFE 5 $21,000$39,564 OK
GOOG (Neville)
+300C −345P +310P −360C
$350.03 300345 310360 $373.00 $346.75 351.48x 11.4% SAFE 15 $109,500$525,046 OK
GOOG (Neville)
+340C −405P +360P −360C
$350.03 340405 360360 $398.00 $386.50 451.88x -2.8% ITM 5 $25,500$175,015 OK
INTC
+85C −100P +35P −123C
$109.81 85100 35123 $114.00 $115.23 653.24x 68.1% SAFE 5 $14,500$54,902 OK
SPCX
+150C −195P +135P −195C
$165.82 150195 135195 $186.00 $189.73 603.22x 18.6% SAFE 5 $13,500$82,912 OK
Joint (...1782)8 fortress(es) · 3 actionable · IC $490,588 · notional $1,387,150
AMZN →
+200C −250P +215P −275C
$258.33 200250 215275 $267.92 $270.70 351.52x 16.8% SAFE 5 $33,960$129,165 REPAIR PLAN (43d)
HOOD →
+65C −95P +80P −120C
$105.42 6595 80120 $114.95 $119.35 151.30x 24.1% SAFE 10 $49,950$105,425 REPAIR PLAN (99d)
IREN (Joint) →
+25C −47P +35P −49C
$37.03 2547 3549 $44.00 $48.42 121.75x 5.5% OK 20 $32,000$74,060 REPAIR PLAN (99d)
GOOG (Joint)
+310C −355C
$350.03 3100 0355 $392.50 $350.23 01.00x 0.0% N/A 5 $41,250$175,015 LEAPS-ONLY
IBIT
+75C
$46.32 750 00 $70.58 $52.58 01.00x 0.0% N/A 50 $22,328$231,600 LEAPS-ONLY
MSTR (Joint)
+180C −200C
$148.45 1800 0200 $233.00 $174.36 01.00x 0.0% N/A 10 $53,000$148,450 LEAPS-ONLY
BMNR (Joint)
+23C −18P +25P
$23.84 2318 250 $36.42 $24.79 01.00x -4.8% ITM 150 $201,300$357,675 OK
COPX
+65C −90P +68P −89C
$82.88 6590 6889 $93.40 $96.31 221.77x 18.0% SAFE 20 $56,800$165,760 OK
RetireInc (...7291)9 fortress(es) · 3 actionable · IC $180,200 · notional $1,015,143
AAPL →
+240C −330P +285P −340C
$337.02 240330 285340 $334.64 $337.37 451.48x 15.4% SAFE 5 $47,320$168,510 ROLL NOW (43d)
APP →
+460C −540P +185P −300C
$274.68 460540 185300 $588.00 $613.21 3553.77x 32.6% SAFE 1 $12,800$27,468 ROLL NOW (43d)
IREN (RetireInc) →
+50C −70P +23P −49C
$37.03 5070 2349 $63.43 $66.43 477.86x 37.9% SAFE 20 $13,700$74,060 ROLL NOW (43d)
MARA (RetireInc)
+40C
$9.93 400 00 $41.04 $11.72 01.00x 0.0% N/A 500 $52,000$496,250 LEAPS-ONLY
CLSK
+17C −17P +10P
$10.96 1717 100 $20.74 $18.23 72.87x 8.8% OK 25 $9,350$27,412 OK
ENPH
+45C −60P +20P
$33.00 4560 200 $56.15 $59.07 406.48x 39.4% SAFE 10 $7,300$32,996 OK
MSTR (RetireInc)
+125C −185P +55P −170C
$148.45 125185 55170 $161.00 $162.61 13011.83x 63.0% SAFE 4 $4,800$59,380 OK
QCOM
+190C −210P +100P −220C
$174.19 190210 100220 $224.00 $227.29 1104.24x 42.6% SAFE 5 $17,000$87,092 OK
RKLB
+115C −135P +45P −90C
$69.95 115135 4590 $141.55 $147.53 904.39x 35.7% SAFE 6 $15,930$41,973 OK
Main (...1299)14 fortress(es) · 4 actionable · overview rows

GLD: HP 330P Maintenance Roll-Out · exp Nov 20 '26, 43d

RELAXED PASS — no candidate met the standard constraints. Widened cost cap 25% → 50% of CC to surface the best available option below. Treat as a guideline breach, not a clean repair.
Stock: $378.38 Current HP: 330P (43d, 12.8% OTM) Current hedge: $6,366/yr Current ML: $256,000 If HP lapses: ML $586,000 (+$330,000) Account: Main (...1299) Contracts: 10 (1,000 sh) CC income: $22,362/yr Cost cap: 50% of CC = $11,181/yr IV: MEDIUM 11 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 330 → 330P (Dec 18 '26, 71d, 12.8% OTM) | Cost: $7,763/yr (35% of CC) | New ML: $256,000 = ML | Roll DEBIT $810 | Margin (TIMS): $7,999
PROTECTIVE PICK (lowest ML within cost cap): HP 330 → 336P (Jan 15 '27, 99d, 11.2% OTM) | Cost: $10,913/yr (49% of CC) | New ML: $250,000 ↓ $6,000 | Roll DEBIT $2,260 | Margin (TIMS): $7,609
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 330 CHEAP Dec 18 71d 12.8% $1.45 $1.51 $7,763 35% $256,000 = D $810
2 330 Jan 15 99d 12.8% $2.20 $2.27 $8,369 37% $256,000 = D $1,570
3 330 Dec 31 84d 12.8% $1.70 $2.04 $8,864 40% $256,000 = D $1,340
4 331 Jan 15 99d 12.5% $2.18 $2.46 $9,070 41% $255,000 -$1,000 D $1,760
5 332 Jan 15 99d 12.3% $2.28 $2.55 $9,402 42% $254,000 -$2,000 D $1,850
6 335 Dec 18 71d 11.5% $1.80 $1.87 $9,613 43% $251,000 -$5,000 D $1,170
7 333 Jan 15 99d 12.0% $2.38 $2.64 $9,733 44% $253,000 -$3,000 D $1,940
8 334 Jan 15 99d 11.7% $2.49 $2.74 $10,102 45% $252,000 -$4,000 D $2,040
9 335 Jan 15 99d 11.5% $2.68 $2.85 $10,508 47% $251,000 -$5,000 D $2,150
10 335 Dec 31 84d 11.5% $2.11 $2.44 $10,602 47% $251,000 -$5,000 D $1,740
▶ 11 336 PROT Jan 15 99d 11.2% $2.72 $2.96 $10,913 49% $250,000 -$6,000 D $2,260
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (36d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $471 — assignment locks a loss · $390, B $5.75 $57,500/yr $7,763/yr SELF-FUNDING
CC at MID $390 0.5σ, B $5.75 $57,500/yr $7,763/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($390, bid $5.75). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

MU (Main): HP 340P Maintenance Roll-Out · exp Nov 20 '26, 43d

Stock: $1075.72 Current HP: 340P (43d, 68.4% OTM) Current hedge: $637/yr Current ML: $409,300 If HP lapses: ML $579,300 (+$170,000) Account: Main (...1299) Contracts: 5 (500 sh) CC income: $677,497/yr Cost cap: 25% of CC = $169,374/yr IV: HIGH 130 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 340 → 380P (Dec 18 '26, 71d, 64.7% OTM) | Cost: $1,362/yr (0% of CC) | New ML: $389,300 ↓ $20,000 | Roll DEBIT $260 | Margin (TIMS): $66,990
PROTECTIVE PICK (lowest ML within cost cap): HP 340 → 980P (Jan 15 '27, 99d, 8.9% OTM) | Cost: $110,422/yr (16% of CC) | New ML: $89,300 ↓ $320,000 | Roll DEBIT $29,945 | Margin (TIMS): $23,104
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 380 CHEAP Dec 18 71d 64.7% $0.25 $0.53 $1,362 0% $389,300 -$20,000 D $260
2 370 Jan 15 99d 65.6% $0.01 $0.80 $1,475 0% $394,300 -$15,000 D $395
3 360 Dec 18 71d 66.5% $0.20 $0.60 $1,542 0% $399,300 -$10,000 D $295
4 350 Jan 15 99d 67.5% $0.31 $0.88 $1,622 0% $404,300 -$5,000 D $435
5 420 Dec 18 71d 61.0% $0.33 $0.65 $1,671 0% $369,300 -$40,000 D $320
6 380 Jan 15 99d 64.7% $0.11 $0.91 $1,678 0% $389,300 -$20,000 D $450
7 340 Jan 15 99d 68.4% $0.03 $1.00 $1,843 0% $409,300 = D $495
8 400 Jan 15 99d 62.8% $0.50 $1.02 $1,880 0% $379,300 -$30,000 D $505
9 400 Dec 18 71d 62.8% $0.30 $0.80 $2,056 0% $379,300 -$30,000 D $395
10 430 Dec 18 71d 60.0% $0.04 $0.80 $2,056 0% $364,300 -$45,000 D $395
11 420 Jan 15 99d 61.0% $0.15 $1.14 $2,102 0% $369,300 -$40,000 D $565
12 440 Dec 18 71d 59.1% $0.03 $0.84 $2,159 0% $359,300 -$50,000 D $415
▶ 13 980 PROT Jan 15 99d 8.9% $55.40 $59.90 $110,422 16% $89,300 -$320,000 D $29,945
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (36d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $1055, B $71.85 $359,250/yr $1,362/yr SELF-FUNDING
CC at MID $1150 0.5σ, B $34.15 $170,750/yr $1,362/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($1055, bid $71.85). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

BMNR (Main): HP 45P Roll-Down · exp Jan 15 '27, 99d

Stock: $23.84 HP: ITM Current hedge: $393,573/yr Baseline: current hedge (no same-strike quote) SS: $65.83 (unchanged) Account: Main (...1299) Contracts: 50 (5,000 sh) CC income: $60,973/yr IV: HIGH OTM floor: 8% Stress: 23% DD Payback gate: 12mo (1.0yr) 5 PASS ⚠ ER 2026-11-20 INTRADAY (43d) inside new HP tenor
RECOMMENDED: Roll HP 45 → 21 (Jan 15, 99d) | Save $357,258/yr | Payback N/A hedge only, N/A w/income (gate: 12mo (1.0yr)) | HP moves to 11.9% OTM | RM 1.00x → 0.93x | Margin (TIMS): $301
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 21 Jan 15 99d 11.9% $1.97 $19.23 $96,150 $36,316 $40,463 $357,258 -3 $-15,000 N/A N/A 0.93x PASS
2 20 Jan 15 99d 16.1% $1.55 $19.65 $98,250 $28,573 $45,994 $365,000 -2 $-10,000 N/A N/A 0.95x PASS
3 19 Jan 15 99d 20.3% $1.28 $19.92 $99,600 $23,596 $52,446 $369,977 -1 $-5,000 N/A N/A 0.98x PASS
4 18 Jan 15 99d 24.5% $0.93 $20.27 $101,350 $17,144 $60,741 $376,429 0 $0 N/A N/A 1.00x PASS
5 17 Jan 15 99d 28.7% $0.79 $20.41 $102,050 $14,563 $47,929 $379,010 1 $5,000 0mo 0mo 1.02x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (36d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $60 — assignment locks a loss · $34, B $0.17 $8,500/yr $36,316/yr DEFICIT $2,318/mo
CC at MID $28 0.7σ, B $0.68 $34,000/yr $36,316/yr DEFICIT $193/mo
AT 23% DRAWDOWN (stock $23.84 → $18.27, hedge $40,463/yr)
CC at SS income stress-adjusted $8,500/yr $40,463/yr DEFICIT $2,664/mo
CC at MID income stress-adjusted $8,500/yr $40,463/yr DEFICIT $2,664/mo
NOT SELF-FUNDING Requires ongoing capital even at MID
CC WRITING STRATEGY
NO SAFE CC STRATEGY at the current chain. Hedge bleeds even at MID strike. Either restructure (deeper-OTM HP, smaller position) or commit to ongoing capital subsidy.
FIGHT no published plan for this fortress (seam as of 2026-10-08 21:45). Fight plans cover uncovered deep-drawdown fortresses; a covered or shallow slice deliberately has none.

IREN (Main): HP 35P Roll-Down · exp Jan 15 '27, 99d

Stock: $37.03 HP: 5.5% OTM Current hedge: $33,919/yr Baseline (roll-fwd, savings vs this): $33,919/yr SS: $44.00 (unchanged) Account: Main (...1299) Contracts: 20 (2,000 sh) CC income: $59,321/yr IV: HIGH OTM floor: 8% Stress: 22% DD Payback gate: 12mo (1.0yr) 3 PASS ⚠ ER 2026-11-05 INTRADAY (28d) inside new HP tenor
RECOMMENDED: Roll HP 35 → 32 (Jan 15, 99d) | Save $10,323/yr | Payback 7mo (0.58yr) hedge only, 1mo (0.09yr) w/income (gate: 12mo (1.0yr)) | HP moves to 13.6% OTM | RM 1.75x → 1.94x | Margin: n/a (RTH)
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 32 Jan 15 99d 13.6% $3.20 $1.25 $2,500 $23,596 $26,029 $10,323 15 $6,000 7mo 1mo 1.94x PASS
2 30 Jan 15 99d 19.0% $2.39 $2.06 $4,120 $17,623 $33,772 $16,296 17 $10,000 7mo 2mo 2.06x PASS
3 27 Jan 15 99d 27.1% $1.49 $2.96 $5,920 $10,987 $28,389 $22,932 20 $16,000 8mo 2mo 2.25x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (36d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $49, B $0.76 $15,200/yr $23,596/yr DEFICIT $700/mo
CC at MID $43 0.7σ, B $1.62 $32,400/yr $23,596/yr SELF-FUNDING
AT 22% DRAWDOWN (stock $37.03 → $28.93, hedge $26,029/yr)
CC at SS income stress-adjusted $5,400/yr $26,029/yr DEFICIT $1,719/mo
CC at MID income stress-adjusted $5,400/yr $26,029/yr DEFICIT $1,719/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($43, bid $1.62) in NORMAL markets. Self-funds today.
In 22% drawdown, even MID is short ~$1,719/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.
Neville (...0865)10 fortress(es) · 4 actionable · overview rows

CRWV: HP 40P Maintenance Roll-Out · exp Nov 20 '26, 43d

Stock: $85.03 Current HP: 40P (43d, 53.0% OTM) Current hedge: $467/yr Current ML: $50,225 If HP lapses: ML $70,225 (+$20,000) Account: Neville (...0865) Contracts: 5 (500 sh) CC income: $30,689/yr Cost cap: 25% of CC = $7,672/yr IV: HIGH 20 qualifying ⚠ ER 2026-11-11 INTRADAY (34d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 40 → 40P (Dec 18 '26, 71d, 53.0% OTM) | Cost: $514/yr (2% of CC) | New ML: $50,225 = ML | Roll DEBIT $80 | Margin (TIMS): $2,180
PROTECTIVE PICK (lowest ML within cost cap): HP 40 → 65P (Jan 15 '27, 99d, 23.6% OTM) | Cost: $6,452/yr (21% of CC) | New ML: $37,725 ↓ $12,500 | Roll DEBIT $1,730 | Margin (TIMS): $2,101
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 40 CHEAP Dec 18 71d 53.0% $0.03 $0.20 $514 2% $50,225 = D $80
2 45 Dec 18 71d 47.1% $0.17 $0.29 $745 2% $47,725 -$2,500 D $125
3 40 Jan 15 99d 53.0% $0.17 $0.44 $811 3% $50,225 = D $200
4 42 Dec 18 71d 50.0% $0.09 $0.34 $874 3% $48,975 -$1,250 D $150
5 48 Dec 18 71d 44.1% $0.34 $0.40 $1,028 3% $46,475 -$3,750 D $180
6 42 Jan 15 99d 50.0% $0.25 $0.56 $1,032 3% $48,975 -$1,250 D $260
7 45 Jan 15 99d 47.1% $0.36 $0.71 $1,309 4% $47,725 -$2,500 D $335
8 48 Jan 15 99d 44.1% $0.51 $0.72 $1,327 4% $46,475 -$3,750 D $340
9 50 Dec 18 71d 41.2% $0.34 $0.54 $1,388 5% $45,225 -$5,000 D $250
10 50 Jan 15 99d 41.2% $0.71 $1.05 $1,936 6% $45,225 -$5,000 D $505
11 55 Dec 18 71d 35.3% $0.88 $0.95 $2,442 8% $42,725 -$7,500 D $455
12 52 Jan 15 99d 38.3% $0.94 $1.38 $2,544 8% $43,975 -$6,250 D $670
▶ 13 65 PROT Jan 15 99d 23.6% $3.30 $3.50 $6,452 21% $37,725 -$12,500 D $1,730
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (36d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $128 — assignment locks a loss · $115, B $1.46 $7,300/yr $514/yr SELF-FUNDING
CC at MID $98 0.6σ, B $3.85 $19,250/yr $514/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($115, bid $1.46). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

IREN (Neville): HP 21P Maintenance Roll-Out · exp Nov 20 '26, 43d

Stock: $37.03 Current HP: 21P (43d, 43.3% OTM) Current hedge: $2,547/yr Current ML: $94,000 If HP lapses: ML $136,000 (+$42,000) Account: Neville (...0865) Contracts: 20 (2,000 sh) CC income: $59,321/yr Cost cap: 25% of CC = $14,830/yr IV: HIGH 6 qualifying ⚠ ER 2026-11-05 INTRADAY (28d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 21 → 22P (Dec 18 '26, 71d, 40.6% OTM) | Cost: $4,113/yr (7% of CC) | New ML: $92,000 ↓ $2,000 | Roll DEBIT $700 | Margin (TIMS): $1,860
PROTECTIVE PICK (lowest ML within cost cap): HP 21 → 27P (Dec 18 '26, 71d, 27.1% OTM) | Cost: $10,796/yr (18% of CC) | New ML: $82,000 ↓ $12,000 | Roll DEBIT $2,000 | Margin (TIMS): $1,584
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 22 CHEAP Dec 18 71d 40.6% $0.17 $0.40 $4,113 7% $92,000 -$2,000 D $700
2 22 Jan 15 99d 40.6% $0.53 $0.69 $5,088 9% $92,000 -$2,000 D $1,280
3 25 Dec 18 71d 32.5% $0.53 $0.66 $6,786 11% $86,000 -$8,000 D $1,220
4 25 Jan 15 99d 32.5% $0.75 $1.22 $8,996 15% $86,000 -$8,000 D $2,340
▶ 5 27 PROT Dec 18 71d 27.1% $0.77 $1.05 $10,796 18% $82,000 -$12,000 D $2,000
6 27 Jan 15 99d 27.1% $1.40 $1.49 $10,987 19% $82,000 -$12,000 D $2,880
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (36d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $58 — assignment locks a loss · $55, B $0.27 $5,400/yr $4,113/yr SELF-FUNDING
CC at MID $43 0.7σ, B $1.62 $32,400/yr $4,113/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($55, bid $0.27). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

MU (Neville): HP 390P Maintenance Roll-Out · exp Nov 20 '26, 43d

Stock: $1075.72 Current HP: 390P (43d, 63.7% OTM) Current hedge: $764/yr Current ML: $194,000 If HP lapses: ML $272,000 (+$78,000) Account: Neville (...0865) Contracts: 2 (200 sh) CC income: $86,247/yr Cost cap: 25% of CC = $21,562/yr IV: HIGH 100 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 390 → 420P (Dec 18 '26, 71d, 61.0% OTM) | Cost: $668/yr (1% of CC) | New ML: $188,000 ↓ $6,000 | Roll DEBIT $128 | Margin (TIMS): $60,664
PROTECTIVE PICK (lowest ML within cost cap): HP 390 → 880P (Dec 18 '26, 71d, 18.2% OTM) | Cost: $19,227/yr (22% of CC) | New ML: $96,000 ↓ $98,000 | Roll DEBIT $3,738 | Margin (TIMS): $24,339
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 420 CHEAP Dec 18 71d 61.0% $0.33 $0.65 $668 1% $188,000 -$6,000 D $128
2 400 Jan 15 99d 62.8% $0.50 $1.02 $752 1% $192,000 -$2,000 D $202
3 400 Dec 18 71d 62.8% $0.30 $0.80 $823 1% $192,000 -$2,000 D $158
4 430 Dec 18 71d 60.0% $0.04 $0.80 $823 1% $186,000 -$8,000 D $158
5 420 Jan 15 99d 61.0% $0.15 $1.14 $841 1% $188,000 -$6,000 D $226
6 440 Dec 18 71d 59.1% $0.03 $0.84 $864 1% $184,000 -$10,000 D $166
7 410 Dec 18 71d 61.9% $0.17 $0.85 $874 1% $190,000 -$4,000 D $168
8 430 Jan 15 99d 60.0% $0.50 $1.21 $892 1% $186,000 -$8,000 D $240
9 440 Jan 15 99d 59.1% $0.55 $1.28 $944 1% $184,000 -$10,000 D $254
10 450 Jan 15 99d 58.2% $0.81 $1.36 $1,003 1% $182,000 -$12,000 D $270
11 390 Dec 18 71d 63.7% $0.21 $0.99 $1,018 1% $194,000 = D $196
12 470 Jan 15 99d 56.3% $1.10 $1.46 $1,077 1% $178,000 -$16,000 D $290
▶ 13 880 PROT Dec 18 71d 18.2% $16.85 $18.70 $19,227 22% $96,000 -$98,000 D $3,738
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (36d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $1,229 — assignment locks a loss · $1150, B $34.15 $68,300/yr $668/yr SELF-FUNDING
CC at MID $1150 0.5σ, B $34.15 $68,300/yr $668/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($1150, bid $34.15). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

SNDK: HP 810P Maintenance Roll-Out · exp Nov 20 '26, 43d

Stock: $1652.60 Current HP: 810P (43d, 51.0% OTM) Current hedge: $2,547/yr Current ML: $99,000 If HP lapses: ML $180,000 (+$81,000) Account: Neville (...0865) Contracts: 1 (100 sh) CC income: $199,018/yr Cost cap: 25% of CC = $49,755/yr IV: HIGH 136 qualifying ⚠ ER 2026-10-29 AMC (21d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 810 → 840P (Jan 15 '27, 99d, 49.2% OTM) | Cost: $2,065/yr (1% of CC) | New ML: $96,000 ↓ $3,000 | Roll DEBIT $560 | Margin (TIMS): $89,082
PROTECTIVE PICK (lowest ML within cost cap): HP 810 → 1380P (Jan 15 '27, 99d, 16.5% OTM) | Cost: $29,347/yr (15% of CC) | New ML: $42,000 ↓ $57,000 | Roll DEBIT $7,960 | Margin (TIMS): $43,528
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 840 CHEAP Jan 15 99d 49.2% $2.50 $5.60 $2,065 1% $96,000 -$3,000 D $560
2 900 Jan 15 99d 45.5% $3.20 $6.00 $2,212 1% $90,000 -$9,000 D $600
3 850 Jan 15 99d 48.6% $2.60 $6.10 $2,249 1% $95,000 -$4,000 D $610
4 850 Dec 18 71d 48.6% $1.95 $4.50 $2,313 1% $95,000 -$4,000 D $450
5 810 Jan 15 99d 51.0% $0.10 $6.40 $2,360 1% $99,000 = D $640
6 830 Jan 15 99d 49.8% $1.40 $6.70 $2,470 1% $97,000 -$2,000 D $670
7 820 Jan 15 99d 50.4% $0.05 $6.80 $2,507 1% $98,000 -$1,000 D $680
8 870 Dec 18 71d 47.4% $0.05 $4.90 $2,519 1% $93,000 -$6,000 D $490
9 830 Dec 18 71d 49.8% $0.05 $5.20 $2,673 1% $97,000 -$2,000 D $520
10 900 Dec 18 71d 45.5% $1.00 $5.30 $2,725 1% $90,000 -$9,000 D $530
11 930 Dec 18 71d 43.7% $1.45 $5.30 $2,725 1% $87,000 -$12,000 D $530
12 890 Jan 15 99d 46.1% $3.00 $7.40 $2,728 1% $91,000 -$8,000 D $740
▶ 13 1380 PROT Jan 15 99d 16.5% $74.40 $79.60 $29,347 15% $42,000 -$57,000 D $7,960
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (36d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $1630, B $140.10 $140,100/yr $2,065/yr SELF-FUNDING
CC at MID $1715 0.2σ, B $103.90 $103,900/yr $2,065/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($1630, bid $140.10). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.
Joint (...1782)8 fortress(es) · 3 actionable · overview rows

AMZN: HP 215P Roll-Down · exp Nov 20 '26, 43d

RELAXED PASS — no candidate met the standard constraints. Widened gap-mult 2.0x → 8.0x; payback gate 1.0yr → 3.0yr to surface the best available option below. Treat as a guideline breach, not a clean repair.
Stock: $258.33 HP: 16.8% OTM Current hedge: $5,815/yr Baseline (roll-fwd, savings vs this): $6,195/yr SS: $267.92 (unchanged) Account: Joint (...1782) Contracts: 5 (500 sh) CC income: $21,357/yr IV: MEDIUM OTM floor: 10% Stress: 12% DD Payback gate: 12mo (1.0yr) 4 PASS ⚠ ER 2026-10-29 AMC (21d) inside new HP tenor
RECOMMENDED: Roll HP 215 → 205 (Jan 15, 99d) | Save $2,084/yr | Payback 29mo (2.40yr) hedge only, 3mo (0.21yr) w/income (gate: 12mo (1.0yr)) | HP moves to 20.6% OTM | RM 1.52x → 1.66x | Margin (TIMS): $4,571
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 205 Jan 15 99d 20.6% $2.23 $-0.93 $-465 $4,111 $8,848 $2,084 45 $5,000 29mo 3mo 1.66x PASS
2 210 Jan 15 99d 18.7% $2.80 $-1.50 $-750 $5,162 $13,734 $1,033 40 $2,500 29mo 1mo 1.59x PASS
3 200 Jan 15 99d 22.6% $1.84 $-0.54 $-270 $3,392 $7,097 $2,803 50 $7,500 32mo 4mo 1.74x PASS
4 195 Jan 15 99d 24.5% $1.55 $-0.25 $-125 $2,857 $5,622 $3,337 55 $10,000 36mo 5mo 1.81x PASS
5 185 Jan 15 99d 28.4% $1.10 $0.20 $100 $2,028 $3,503 $4,167 65 $15,000 43mo 7mo 1.96x FAIL
6 190 Jan 15 99d 26.5% $1.26 $0.04 $20 $2,323 $4,443 $3,872 60 $12,500 39mo 6mo 1.88x FAIL
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (36d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $275, B $6.45 $32,250/yr $4,111/yr SELF-FUNDING
CC at MID $280 0.7σ, B $5.00 $25,000/yr $4,111/yr SELF-FUNDING
AT 12% DRAWDOWN (stock $258.33 → $228.17, hedge $8,848/yr)
CC at SS income stress-adjusted $5,100/yr $8,848/yr DEFICIT $312/mo
CC at MID income stress-adjusted $3,350/yr $8,848/yr DEFICIT $458/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($280, bid $5.00) in NORMAL markets. Self-funds today.
In 12% drawdown, even MID is short ~$458/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.

HOOD: HP 80P Roll-Down · exp Jan 15 '27, 99d

RELAXED PASS — no candidate met the standard constraints. Widened gap-mult 2.0x → 8.0x; payback gate 1.0yr → 3.0yr to surface the best available option below. Treat as a guideline breach, not a clean repair.
Stock: $105.42 HP: 24.1% OTM Current hedge: $9,586/yr Baseline (roll-fwd, savings vs this): $8,945/yr SS: $114.95 (unchanged) Account: Joint (...1782) Contracts: 10 (1,000 sh) CC income: $40,261/yr IV: HIGH OTM floor: 8% Stress: 17% DD Payback gate: 12mo (1.0yr) 1 PASS ⚠ ER 2026-10-27 AMC (19d) inside new HP tenor
RECOMMENDED: Roll HP 80 → 75 (Jan 15, 99d) | Save $2,309/yr | Payback 26mo (2.17yr) hedge only, 1mo (0.12yr) w/income (gate: 12mo (1.0yr)) | HP moves to 28.9% OTM | RM 1.30x → 1.40x | Margin (TIMS): $2,580
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 75 Jan 15 99d 28.9% $1.80 $0.51 $510 $6,636 $14,747 $2,309 20 $5,000 26mo 1mo 1.40x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (36d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $120, B $3.40 $34,000/yr $6,636/yr SELF-FUNDING
CC at MID $119 0.7σ, B $3.65 $36,500/yr $6,636/yr SELF-FUNDING
AT 17% DRAWDOWN (stock $105.42 → $87.77, hedge $14,747/yr)
CC at SS income stress-adjusted $28,100/yr $14,747/yr SELF-FUNDING
CC at MID income stress-adjusted $28,100/yr $14,747/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($120, bid $3.40). Conservative far-OTM strike covers the hedge in BOTH normal and 17% drawdown — minimal assignment risk.

IREN (Joint): HP 35P Roll-Down · exp Jan 15 '27, 99d

Stock: $37.03 HP: 5.5% OTM Current hedge: $33,919/yr Baseline (roll-fwd, savings vs this): $33,919/yr SS: $44.00 (unchanged) Account: Joint (...1782) Contracts: 20 (2,000 sh) CC income: $59,321/yr IV: HIGH OTM floor: 8% Stress: 22% DD Payback gate: 12mo (1.0yr) 3 PASS ⚠ ER 2026-11-05 INTRADAY (28d) inside new HP tenor
RECOMMENDED: Roll HP 35 → 32 (Jan 15, 99d) | Save $10,323/yr | Payback 7mo (0.58yr) hedge only, 1mo (0.09yr) w/income (gate: 12mo (1.0yr)) | HP moves to 13.6% OTM | RM 1.75x → 1.94x | Margin (TIMS): $1,297
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 32 Jan 15 99d 13.6% $3.20 $1.25 $2,500 $23,596 $26,029 $10,323 15 $6,000 7mo 1mo 1.94x PASS
2 30 Jan 15 99d 19.0% $2.39 $2.06 $4,120 $17,623 $33,772 $16,296 17 $10,000 7mo 2mo 2.06x PASS
3 27 Jan 15 99d 27.1% $1.49 $2.96 $5,920 $10,987 $28,389 $22,932 20 $16,000 8mo 2mo 2.25x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (36d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $49, B $0.76 $15,200/yr $23,596/yr DEFICIT $700/mo
CC at MID $43 0.7σ, B $1.62 $32,400/yr $23,596/yr SELF-FUNDING
AT 22% DRAWDOWN (stock $37.03 → $28.93, hedge $26,029/yr)
CC at SS income stress-adjusted $5,400/yr $26,029/yr DEFICIT $1,719/mo
CC at MID income stress-adjusted $5,400/yr $26,029/yr DEFICIT $1,719/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($43, bid $1.62) in NORMAL markets. Self-funds today.
In 22% drawdown, even MID is short ~$1,719/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.
RetireInc (...7291)9 fortress(es) · 3 actionable · overview rows

AAPL: HP 285P Maintenance Roll-Out · exp Nov 20 '26, 43d

Stock: $337.02 Current HP: 285P (43d, 15.4% OTM) Current hedge: $4,244/yr Current ML: $69,820 If HP lapses: ML $212,320 (+$142,500) Account: RetireInc (...7291) Contracts: 5 (500 sh) CC income: $58,477/yr Cost cap: 25% of CC = $14,619/yr IV: MEDIUM 8 qualifying ⚠ ER 2026-11-02 INTRADAY (25d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 285 → 285P (Dec 18 '26, 71d, 15.4% OTM) | Cost: $4,935/yr (8% of CC) | New ML: $69,820 = ML | Roll DEBIT $530 | Margin (TIMS): $5,978
PROTECTIVE PICK (lowest ML within cost cap): HP 285 → 300P (Jan 15 '27, 99d, 11.0% OTM) | Cost: $8,756/yr (15% of CC) | New ML: $62,320 ↓ $7,500 | Roll DEBIT $1,945 | Margin (TIMS): $5,255
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 285 CHEAP Dec 18 71d 15.4% $1.71 $1.92 $4,935 8% $69,820 = D $530
2 285 Jan 15 99d 15.4% $2.53 $2.82 $5,198 9% $69,820 = D $980
3 290 Dec 18 71d 14.0% $2.10 $2.33 $5,989 10% $67,320 -$2,500 D $735
4 290 Jan 15 99d 14.0% $3.10 $3.25 $5,991 10% $67,320 -$2,500 D $1,195
5 295 Dec 18 71d 12.5% $2.65 $2.84 $7,300 12% $64,820 -$5,000 D $990
6 295 Jan 15 99d 12.5% $3.70 $4.00 $7,374 13% $64,820 -$5,000 D $1,570
▶ 7 300 PROT Jan 15 99d 11.0% $4.50 $4.75 $8,756 15% $62,320 -$7,500 D $1,945
8 300 Dec 18 71d 11.0% $3.20 $3.45 $8,868 15% $62,320 -$7,500 D $1,295
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (36d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $340, B $9.95 $49,750/yr $4,935/yr SELF-FUNDING
CC at MID $355 0.6σ, B $4.50 $22,500/yr $4,935/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($340, bid $9.95). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

APP: HP 185P Maintenance Roll-Out · exp Nov 20 '26, 43d

Stock: $274.68 Current HP: 185P (43d, 32.6% OTM) Current hedge: $1,401/yr Current ML: $48,300 If HP lapses: ML $66,800 (+$18,500) Account: RetireInc (...7291) Contracts: 1 (100 sh) CC income: $16,087/yr Cost cap: 25% of CC = $4,022/yr IV: HIGH 10 qualifying ⚠ ER 2026-11-04 INTRADAY (27d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 185 → 185P (Dec 18 '26, 71d, 32.6% OTM) | Cost: $1,799/yr (11% of CC) | New ML: $48,300 = ML | Roll DEBIT $230 | Margin (TIMS): $9,227
PROTECTIVE PICK (lowest ML within cost cap): HP 185 → 210P (Jan 15 '27, 99d, 23.5% OTM) | Cost: $3,650/yr (23% of CC) | New ML: $45,800 ↓ $2,500 | Roll DEBIT $870 | Margin (TIMS): $8,590
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 185 CHEAP Dec 18 71d 32.6% $2.45 $3.50 $1,799 11% $48,300 = D $230
2 185 Jan 15 99d 32.6% $3.50 $5.30 $1,954 12% $48,300 = D $410
3 190 Dec 18 71d 30.8% $3.00 $4.00 $2,056 13% $47,800 -$500 D $280
4 190 Jan 15 99d 30.8% $4.20 $6.00 $2,212 14% $47,800 -$500 D $480
5 195 Jan 15 99d 29.0% $5.00 $6.60 $2,433 15% $47,300 -$1,000 D $540
6 195 Dec 18 71d 29.0% $3.00 $4.80 $2,468 15% $47,300 -$1,000 D $360
7 200 Dec 18 71d 27.2% $4.60 $5.30 $2,725 17% $46,800 -$1,500 D $410
8 200 Jan 15 99d 27.2% $6.40 $7.80 $2,876 18% $46,800 -$1,500 D $660
▶ 9 210 PROT Jan 15 99d 23.5% $8.60 $9.90 $3,650 23% $45,800 -$2,500 D $870
10 210 Dec 18 71d 23.5% $5.30 $7.20 $3,701 23% $45,800 -$2,500 D $600
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (36d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $613 — assignment locks a loss · $365, B $2.90 $2,900/yr $1,799/yr SELF-FUNDING
CC at MID $315 0.7σ, B $10.40 $10,400/yr $1,799/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($365, bid $2.90). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

IREN (RetireInc): HP 23P Maintenance Roll-Out · exp Nov 20 '26, 43d

Stock: $37.03 Current HP: 23P (43d, 37.9% OTM) Current hedge: $3,735/yr Current ML: $107,700 If HP lapses: ML $153,700 (+$46,000) Account: RetireInc (...7291) Contracts: 20 (2,000 sh) CC income: $59,321/yr Cost cap: 25% of CC = $14,830/yr IV: HIGH 4 qualifying ⚠ ER 2026-11-05 INTRADAY (28d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 23 → 25P (Dec 18 '26, 71d, 32.5% OTM) | Cost: $6,786/yr (11% of CC) | New ML: $103,700 ↓ $4,000 | Roll DEBIT $1,100 | Margin (TIMS): $1,710
PROTECTIVE PICK (lowest ML within cost cap): HP 23 → 27P (Dec 18 '26, 71d, 27.1% OTM) | Cost: $10,796/yr (18% of CC) | New ML: $99,700 ↓ $8,000 | Roll DEBIT $1,880 | Margin (TIMS): $1,582
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 25 CHEAP Dec 18 71d 32.5% $0.53 $0.66 $6,786 11% $103,700 -$4,000 D $1,100
2 25 Jan 15 99d 32.5% $0.75 $1.22 $8,996 15% $103,700 -$4,000 D $2,220
▶ 3 27 PROT Dec 18 71d 27.1% $0.77 $1.05 $10,796 18% $99,700 -$8,000 D $1,880
4 27 Jan 15 99d 27.1% $1.40 $1.49 $10,987 19% $99,700 -$8,000 D $2,760
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (36d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $66 — assignment locks a loss · $55, B $0.27 $5,400/yr $6,786/yr DEFICIT $115/mo
CC at MID $43 0.7σ, B $1.62 $32,400/yr $6,786/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at MID ($43, bid $1.62). Self-funds in BOTH normal and 0% drawdown. At SS the position bleeds, so don't drift too far OTM.

HP roll-downs do not change Safe Strike. SS = Max(LC+ND, (LC+SP+ND)/2). HP is not in the formula.

Monthly hedge cost prorated: (30/DTE) × (Ask × Shares). Payback = ML increase / Annual savings.

EST = ask price estimated as mid × 1.10 (10% safety buffer). Verify with live prices before executing.

Always prefer longest viable DTE for repair rolls (fewer rolls/yr = lower annual cost).