GENERATED2026-10-10 03:54
FORTRESS REPAIRHP Roll-Down Analysis
Payback gate: 12mo (1.0yr)
SS = Max(LC+ND, (LC+SP+ND)/2)
TOTAL HEDGE (CURRENT)
$501,695/yr
TOTAL HEDGE (REPAIRED)
$100,468/yr
ANNUAL SAVINGS
$401,227/yr
ROLL CREDITS
$100,665
ADDITIONAL MAX LOSS
$6,000
PORTFOLIO ACTION SUMMARY · 41 positions
9 · ROLL NOW6 · REPAIR PLAN7 · LEAPS-ONLY19 · OK
Click any ticker row below to jump to its analysis section.
What do these actions mean? (legend)
NO HEDGE — No HP leg at all — naked synthetic long, no catastrophic protection.
ROLL IMMEDIATELY — Healthy fortress, HP expires ≤14d — roll the hedge out NOW (theta cliff).
REPAIR NOW — Structurally bad (HP ITM/tight or costly) AND ≤14d — roll HP DOWN today.
REPAIR SOON — Structurally bad AND ≤35d — roll HP DOWN this week.
ROLL NOW — Healthy fortress, HP ≤45d — roll the hedge OUT (maintain/raise strike).
REPAIR PLAN — Structurally bad but >35d runway — plan the roll-down, no rush.
LEAPS-ONLY — CSV-declared SP=0/HP=0 — intentional LC-only structure, no hedge to roll.
OK — Healthy structure with ample HP runway — no action.
REPAIR = roll HP down to a cheaper OTM strike (structure is hurting). ROLL = roll HP out/up to a later expiry (structure is healthy, hedge just expiring).

Fortress Position Overview

FORTRESSSTOCKLCSPHPSC BE‑SS CC‑SS GAPRMHP OTM%STATUSCTRSICNOTIONALURGENCY
Main (...1299)14 fortress(es) · 5 actionable · IC $1,234,550 · notional $3,212,289
GLD →
+320C −450P +330P −409C
$384.52 320450 330409 $456.00 $468.97 1201.88x 14.2% SAFE 10 $136,000$384,520 ROLL NOW (42d)
MU (Main) →
+880C −1010P +340P −1075C
$1026.38 8801010 3401075 $1028.60 $1041.58 6705.51x 66.9% SAFE 5 $74,300$513,191 ROLL NOW (42d)
AMD →
+410C −550P +470P −665C
$607.50 410550 470665 $649.20 $661.48 801.33x 22.6% SAFE 2 $47,840$121,501 REPAIR PLAN (98d)
BMNR (Main) →
+25C −18P +45P
$24.01 2518 450 $65.83 $60.57 01.00x -87.4% ITM 50 $204,150$120,050 REPAIR PLAN (98d)
IREN (Main) →
+25C −47P +35P −49C
$34.83 2547 3549 $44.00 $48.35 121.75x -0.5% ITM 20 $32,000$69,650 REPAIR PLAN (98d)
IGV
+70C −115C
$112.39 700 0115 $96.50 $87.96 01.00x 0.0% N/A 12 $31,800$134,868 LEAPS-ONLY
MARA (Main)
+13C
$9.61 130 00 $16.75 $11.51 01.00x 0.0% N/A 400 $150,000$384,200 LEAPS-ONLY
BMNR (Main)
+23C −18P +25P
$24.01 2318 250 $53.26 $47.61 01.00x -4.1% ITM 75 $226,950$180,075 OK
COIN (Main)
+165C −240P +90P −200C
$181.53 165240 90200 $210.90 $214.51 1509.93x 50.4% SAFE 8 $13,440$145,224 OK
COIN (Main)
+500C −330P +300P −200C
$181.53 500330 300200 $563.00 $382.72 301.48x -65.3% ITM 25 $157,500$453,825 OK
DELL
+310C −400P +320P −650C
$587.75 310400 320650 $562.50 $569.89 801.32x 45.6% SAFE 3 $75,750$176,325 OK
GLXY
+38C −38P +18P
$20.23 3838 180 $39.71 $35.38 2010.05x 13.5% SAFE 125 $27,625$252,875 OK
HIMS
+10C −20P +5P −32C
$31.02 1020 532 $17.47 $18.86 154.04x 83.9% SAFE 15 $7,395$46,530 OK
NVDA
+215C −225P +200P −250C
$229.46 215225 200250 $264.80 $230.44 251.50x 12.8% SAFE 10 $49,800$229,455 OK
Neville (...0865)10 fortress(es) · 4 actionable · IC $441,025 · notional $2,280,260
CRWV →
+105C −120P +40P −100C
$82.11 105120 40100 $125.45 $128.44 804.91x 51.3% SAFE 5 $10,225$41,052 ROLL NOW (42d)
IREN (Neville) →
+45C −65P +21P −49C
$34.83 4565 2149 $56.50 $58.01 4415.67x 39.7% SAFE 20 $6,000$69,650 ROLL NOW (42d)
MU (Neville) →
+970C −1110P +390P −1075C
$1026.38 9701110 3901075 $1220.00 $1228.58 7203.88x 62.0% SAFE 2 $50,000$205,276 ROLL NOW (42d)
SNDK →
+1200C −1380P +810P −1700C
$1584.12 12001380 8101700 $1620.00 $1627.13 5702.36x 48.9% SAFE 1 $42,000$158,412 ROLL NOW (42d)
SPY
+640C −785C
$778.41 6400 0785 $764.00 $703.77 01.00x 0.0% N/A 12 $148,800$934,093 LEAPS-ONLY
CRCL
+45C −65P +40P −98C
$85.03 4565 4098 $87.00 $91.20 251.60x 53.0% SAFE 5 $21,000$42,518 OK
GOOG (Neville)
+300C −345P +310P −360C
$348.20 300345 310360 $373.00 $345.80 351.48x 11.0% SAFE 15 $109,500$522,301 OK
GOOG (Neville)
+340C −405P +360P −360C
$348.20 340405 360360 $398.00 $386.50 451.88x -3.4% ITM 5 $25,500$174,100 OK
INTC
+85C −100P +35P −114C
$104.25 85100 35114 $114.00 $115.44 653.24x 66.4% SAFE 5 $14,500$52,125 OK
SPCX
+150C −195P +135P −195C
$161.47 150195 135195 $186.00 $189.84 603.22x 16.4% SAFE 5 $13,500$80,732 OK
Joint (...1782)8 fortress(es) · 3 actionable · IC $490,588 · notional $1,403,029
AMZN →
+200C −250P +215P −278C
$262.65 200250 215278 $267.92 $271.74 351.52x 18.1% SAFE 5 $33,960$131,325 REPAIR PLAN (42d)
HOOD →
+65C −95P +80P −120C
$109.36 6595 80120 $114.95 $119.27 151.30x 26.8% SAFE 10 $49,950$109,360 REPAIR PLAN (98d)
IREN (Joint) →
+25C −47P +35P −49C
$34.83 2547 3549 $44.00 $48.35 121.75x -0.5% ITM 20 $32,000$69,650 REPAIR PLAN (98d)
GOOG (Joint)
+310C −355C
$348.20 3100 0355 $392.50 $350.54 01.00x 0.0% N/A 5 $41,250$174,100 LEAPS-ONLY
IBIT
+75C
$46.53 750 00 $70.58 $52.71 01.00x 0.0% N/A 50 $22,328$232,650 LEAPS-ONLY
MSTR (Joint)
+180C −200C
$154.26 1800 0200 $233.00 $175.48 01.00x 0.0% N/A 10 $53,000$154,260 LEAPS-ONLY
BMNR (Joint)
+23C −18P +25P
$24.01 2318 250 $36.42 $25.25 01.00x -4.1% ITM 150 $201,300$360,150 OK
COPX
+65C −90P +68P
$85.77 6590 680 $93.40 $96.68 221.77x 20.7% SAFE 20 $56,800$171,534 OK
RetireInc (...7291)9 fortress(es) · 3 actionable · IC $180,200 · notional $995,428
AAPL →
+240C −330P +285P −350C
$336.85 240330 285350 $334.64 $338.27 451.48x 15.4% SAFE 5 $47,320$168,425 ROLL NOW (42d)
APP →
+460C −540P +185P
$276.03 460540 1850 $588.00 $607.25 3553.77x 33.0% SAFE 1 $12,800$27,603 ROLL NOW (42d)
IREN (RetireInc) →
+50C −70P +23P −49C
$34.83 5070 2349 $63.43 $66.68 477.86x 34.0% SAFE 20 $13,700$69,650 ROLL NOW (42d)
MARA (RetireInc)
+40C
$9.61 400 00 $41.04 $11.68 01.00x 0.0% N/A 500 $52,000$480,250 LEAPS-ONLY
CLSK
+17C −17P +10P
$10.49 1717 100 $20.74 $18.46 72.87x 4.7% TIGHT 25 $9,350$26,237 OK
ENPH
+45C −60P +20P
$32.62 4560 200 $56.15 $58.99 406.48x 38.7% SAFE 10 $7,300$32,620 OK
MSTR (RetireInc)
+125C −185P +55P −170C
$154.26 125185 55170 $161.00 $162.22 13011.83x 64.3% SAFE 4 $4,800$61,704 OK
QCOM
+190C −210P +100P −220C
$175.99 190210 100220 $224.00 $227.32 1104.24x 43.2% SAFE 5 $17,000$87,995 OK
RKLB
+115C −135P +45P −73C
$68.24 115135 4573 $141.55 $148.22 904.39x 34.1% SAFE 6 $15,930$40,944 OK
Main (...1299)14 fortress(es) · 5 actionable · overview rows

GLD: HP 330P Maintenance Roll-Out · exp Nov 20 '26, 42d

Stock: $384.52 Current HP: 330P (42d, 14.2% OTM) Current hedge: $4,171/yr Current ML: $256,000 If HP lapses: ML $586,000 (+$330,000) Account: Main (...1299) Contracts: 10 (1,000 sh) CC income: $25,864/yr Cost cap: 25% of CC = $6,466/yr IV: MEDIUM 2 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 330 → 330P (Dec 18 '26, 70d, 14.2% OTM) | Cost: $5,788/yr (22% of CC) | New ML: $256,000 = ML | Roll DEBIT $670 | Margin: n/a (RTH)
PROTECTIVE PICK: same as CHEAPEST (no higher-strike candidate clears the cost cap).
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 330 CHEAP PROT Dec 18 70d 14.2% $1.06 $1.11 $5,788 22% $256,000 = D $670
2 330 Dec 31 83d 14.2% $1.33 $1.41 $6,201 24% $256,000 = D $970
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $469 — assignment locks a loss · $396, B $5.85 $60,171/yr $5,788/yr SELF-FUNDING
CC at MID $396 0.5σ, B $5.85 $60,171/yr $5,788/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($396, bid $5.85). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

MU (Main): HP 340P Maintenance Roll-Out · exp Nov 20 '26, 42d

Stock: $1026.38 Current HP: 340P (42d, 66.9% OTM) Current hedge: $565/yr Current ML: $409,300 If HP lapses: ML $579,300 (+$170,000) Account: Main (...1299) Contracts: 5 (500 sh) CC income: $316,902/yr Cost cap: 25% of CC = $79,225/yr IV: HIGH 114 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 340 → 350P (Dec 18 '26, 70d, 65.9% OTM) | Cost: $886/yr (0% of CC) | New ML: $404,300 ↓ $5,000 | Roll DEBIT $155 | Margin (TIMS): $63,097
PROTECTIVE PICK (lowest ML within cost cap): HP 340 → 900P (Dec 18 '26, 70d, 12.3% OTM) | Cost: $75,607/yr (24% of CC) | New ML: $129,300 ↓ $280,000 | Roll DEBIT $14,485 | Margin (TIMS): $23,405
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 350 CHEAP Dec 18 70d 65.9% $0.26 $0.34 $886 0% $404,300 -$5,000 D $155
2 360 Dec 18 70d 64.9% $0.31 $0.36 $939 0% $399,300 -$10,000 D $165
3 350 Jan 15 98d 65.9% $0.43 $0.55 $1,024 0% $404,300 -$5,000 D $260
4 380 Dec 18 70d 63.0% $0.18 $0.42 $1,095 0% $389,300 -$20,000 D $195
5 370 Jan 15 98d 64.0% $0.47 $0.62 $1,155 0% $394,300 -$15,000 D $295
6 400 Dec 18 70d 61.0% $0.39 $0.53 $1,382 0% $379,300 -$30,000 D $250
7 390 Jan 15 98d 62.0% $0.61 $0.76 $1,415 0% $384,300 -$25,000 D $365
8 360 Jan 15 98d 64.9% $0.32 $0.78 $1,453 0% $399,300 -$10,000 D $375
9 400 Jan 15 98d 61.0% $0.50 $0.78 $1,453 0% $379,300 -$30,000 D $375
10 340 Jan 15 98d 66.9% $0.13 $0.84 $1,564 0% $409,300 = D $405
11 410 Dec 18 70d 60.1% $0.22 $0.60 $1,564 0% $374,300 -$35,000 D $285
12 420 Dec 18 70d 59.1% $0.32 $0.60 $1,564 0% $369,300 -$40,000 D $285
▶ 13 900 PROT Dec 18 70d 12.3% $28.50 $29.00 $75,607 24% $129,300 -$280,000 D $14,485
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $1045, B $49.50 $254,571/yr $886/yr SELF-FUNDING
CC at MID $1105 0.5σ, B $28.10 $144,514/yr $886/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($1045, bid $49.50). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

AMD: HP 470P Roll-Down · exp Jan 15 '27, 98d

RELAXED PASS — no candidate met the standard constraints. Widened gap-mult 2.0x → 8.0x; payback gate 1.0yr → 2.0yr to surface the best available option below. Treat as a guideline breach, not a clean repair.
Stock: $607.50 HP: 22.6% OTM Current hedge: $8,604/yr Baseline (roll-fwd, savings vs this): $8,395/yr SS: $649.20 (unchanged) Account: Main (...1299) Contracts: 2 (200 sh) CC income: $49,821/yr IV: HIGH OTM floor: 8% Stress: 14% DD Payback gate: 12mo (1.0yr) 1 PASS ⚠ ER 2026-11-03 INTRADAY (25d) inside new HP tenor
RECOMMENDED: Roll HP 470 → 450 (Jan 15, 98d) | Save $2,063/yr | Payback 23mo (1.94yr) hedge only, 1mo (0.08yr) w/income (gate: 12mo (1.0yr)) | HP moves to 25.9% OTM | RM 1.33x → 1.42x | Margin (TIMS): $2,563
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 450 Jan 15 98d 25.9% $8.50 $2.25 $450 $6,332 $14,451 $2,063 100 $4,000 23mo 1mo 1.42x PASS
2 430 Jan 15 98d 29.2% $6.30 $4.45 $890 $4,693 $9,609 $3,702 120 $8,000 26mo 2mo 1.50x FAIL
3 440 Jan 15 98d 27.6% $7.30 $3.45 $690 $5,438 $11,173 $2,957 110 $6,000 24mo 1mo 1.46x FAIL
4 460 Jan 15 98d 24.3% $10.20 $0.55 $110 $7,598 $16,760 $797 90 $2,000 30mo 0mo 1.38x FAIL
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $665, B $19.40 $39,909/yr $6,332/yr SELF-FUNDING
CC at MID $670 0.6σ, B $16.70 $34,354/yr $6,332/yr SELF-FUNDING
AT 14% DRAWDOWN (stock $607.50 → $519.60, hedge $14,451/yr)
CC at SS income stress-adjusted $24,069/yr $14,451/yr SELF-FUNDING
CC at MID income stress-adjusted $24,069/yr $14,451/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($665, bid $19.40). Conservative far-OTM strike covers the hedge in BOTH normal and 14% drawdown — minimal assignment risk.

BMNR (Main): HP 45P Roll-Down · exp Jan 15 '27, 98d

Stock: $24.01 HP: ITM Current hedge: $397,589/yr Baseline: current hedge (no same-strike quote) SS: $65.83 (unchanged) Account: Main (...1299) Contracts: 50 (5,000 sh) CC income: $57,536/yr IV: HIGH OTM floor: 8% Stress: 23% DD Payback gate: 12mo (1.0yr) 5 PASS ⚠ ER 2026-11-20 INTRADAY (42d) inside new HP tenor
RECOMMENDED: Roll HP 45 → 21 (Jan 15, 98d) | Save $364,441/yr | Payback N/A hedge only, N/A w/income (gate: 12mo (1.0yr)) | HP moves to 12.5% OTM | RM 1.00x → 0.93x | Margin (TIMS): $313
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 21 Jan 15 98d 12.5% $1.78 $18.97 $94,850 $33,148 $41,156 $364,441 -3 $-15,000 N/A N/A 0.93x PASS
2 20 Jan 15 98d 16.7% $1.41 $19.34 $96,700 $26,258 $46,742 $371,332 -2 $-10,000 N/A N/A 0.95x PASS
3 19 Jan 15 98d 20.9% $1.10 $19.65 $98,250 $20,485 $53,260 $377,105 -1 $-5,000 N/A N/A 0.98x PASS
4 18 Jan 15 98d 25.0% $0.85 $19.90 $99,500 $15,829 $60,523 $381,760 0 $0 N/A N/A 1.00x PASS
5 17 Jan 15 98d 29.2% $0.73 $20.02 $100,100 $13,594 $45,439 $383,995 1 $5,000 0mo 0mo 1.02x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $61 — assignment locks a loss · $35, B $0.13 $6,686/yr $33,148/yr DEFICIT $2,205/mo
CC at MID $27 0.6σ, B $0.89 $45,771/yr $33,148/yr SELF-FUNDING
AT 23% DRAWDOWN (stock $24.01 → $18.49, hedge $41,156/yr)
CC at SS income stress-adjusted $6,686/yr $41,156/yr DEFICIT $2,872/mo
CC at MID income stress-adjusted $6,686/yr $41,156/yr DEFICIT $2,872/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($27, bid $0.89) in NORMAL markets. Self-funds today.
In 23% drawdown, even MID is short ~$2,872/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.

IREN (Main): HP 35P Roll-Down · exp Jan 15 '27, 98d

Stock: $34.83 HP: ITM Current hedge: $40,969/yr Baseline: current hedge (no same-strike quote) SS: $44.00 (unchanged) Account: Main (...1299) Contracts: 20 (2,000 sh) CC income: $49,500/yr IV: HIGH OTM floor: 8% Stress: 22% DD Payback gate: 12mo (1.0yr) 4 PASS ⚠ ER 2026-11-05 INTRADAY (27d) inside new HP tenor
RECOMMENDED: Roll HP 35 → 32 (Jan 15, 98d) | Save $12,291/yr | Payback 6mo (0.49yr) hedge only, 1mo (0.10yr) w/income (gate: 12mo (1.0yr)) | HP moves to 8.1% OTM | RM 1.75x → 1.94x | Margin: n/a (RTH)
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 32 Jan 15 98d 8.1% $3.85 $1.45 $2,900 $28,679 $18,809 $12,291 15 $6,000 6mo 1mo 1.94x PASS
2 30 Jan 15 98d 13.9% $2.95 $2.35 $4,700 $21,974 $25,513 $18,995 17 $10,000 6mo 2mo 2.06x PASS
3 27 Jan 15 98d 22.5% $1.89 $3.41 $6,820 $14,079 $33,707 $26,891 20 $16,000 7mo 3mo 2.25x PASS
4 25 Jan 15 98d 28.2% $1.51 $3.79 $7,580 $11,248 $23,837 $29,721 22 $20,000 8mo 3mo 2.38x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $49, B $0.47 $9,669/yr $28,679/yr DEFICIT $1,584/mo
CC at MID $40 0.6σ, B $1.52 $31,269/yr $28,679/yr SELF-FUNDING
AT 22% DRAWDOWN (stock $34.83 → $27.16, hedge $18,809/yr)
CC at SS income stress-adjusted $6,583/yr $18,809/yr DEFICIT $1,019/mo
CC at MID income stress-adjusted $6,994/yr $18,809/yr DEFICIT $985/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($40, bid $1.52) in NORMAL markets. Self-funds today.
In 22% drawdown, even MID is short ~$985/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.
Neville (...0865)10 fortress(es) · 4 actionable · overview rows

CRWV: HP 40P Maintenance Roll-Out · exp Nov 20 '26, 42d

Stock: $82.11 Current HP: 40P (42d, 51.3% OTM) Current hedge: $521/yr Current ML: $50,225 If HP lapses: ML $70,225 (+$20,000) Account: Neville (...0865) Contracts: 5 (500 sh) CC income: $26,507/yr Cost cap: 25% of CC = $6,627/yr IV: HIGH 18 qualifying ⚠ ER 2026-11-11 INTRADAY (33d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 40 → 40P (Dec 18 '26, 70d, 51.3% OTM) | Cost: $521/yr (2% of CC) | New ML: $50,225 = ML | Roll DEBIT $80 | Margin (TIMS): $2,127
PROTECTIVE PICK (lowest ML within cost cap): HP 40 → 62P (Jan 15 '27, 98d, 23.9% OTM) | Cost: $5,866/yr (22% of CC) | New ML: $38,975 ↓ $11,250 | Roll DEBIT $1,555 | Margin (TIMS): $2,066
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 40 CHEAP Dec 18 70d 51.3% $0.13 $0.20 $521 2% $50,225 = D $80
2 42 Dec 18 70d 48.2% $0.20 $0.31 $808 3% $48,975 -$1,250 D $135
3 40 Jan 15 98d 51.3% $0.28 $0.44 $819 3% $50,225 = D $200
4 45 Dec 18 70d 45.2% $0.30 $0.40 $1,043 4% $47,725 -$2,500 D $180
5 42 Jan 15 98d 48.2% $0.41 $0.57 $1,061 4% $48,975 -$1,250 D $265
6 45 Jan 15 98d 45.2% $0.61 $0.73 $1,359 5% $47,725 -$2,500 D $345
7 48 Dec 18 70d 42.1% $0.42 $0.53 $1,382 5% $46,475 -$3,750 D $245
8 48 Jan 15 98d 42.1% $0.71 $0.93 $1,732 7% $46,475 -$3,750 D $445
9 50 Dec 18 70d 39.1% $0.57 $0.69 $1,799 7% $45,225 -$5,000 D $325
10 50 Jan 15 98d 39.1% $0.99 $1.13 $2,104 8% $45,225 -$5,000 D $545
11 52 Jan 15 98d 36.1% $1.21 $1.49 $2,775 10% $43,975 -$6,250 D $725
12 55 Dec 18 70d 33.0% $1.06 $1.15 $2,998 11% $42,725 -$7,500 D $555
▶ 13 62 PROT Jan 15 98d 23.9% $3.10 $3.15 $5,866 22% $38,975 -$11,250 D $1,555
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $128 — assignment locks a loss · $100, B $2.49 $12,806/yr $521/yr SELF-FUNDING
CC at MID $95 0.7σ, B $3.40 $17,486/yr $521/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($100, bid $2.49). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

IREN (Neville): HP 21P Maintenance Roll-Out · exp Nov 20 '26, 42d

Stock: $34.83 Current HP: 21P (42d, 39.7% OTM) Current hedge: $3,650/yr Current ML: $94,000 If HP lapses: ML $136,000 (+$42,000) Account: Neville (...0865) Contracts: 20 (2,000 sh) CC income: $49,500/yr Cost cap: 25% of CC = $12,375/yr IV: HIGH 4 qualifying ⚠ ER 2026-11-05 INTRADAY (27d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 21 → 22P (Dec 18 '26, 70d, 36.8% OTM) | Cost: $5,110/yr (10% of CC) | New ML: $92,000 ↓ $2,000 | Roll DEBIT $760 | Margin (TIMS): $1,748
PROTECTIVE PICK (lowest ML within cost cap): HP 21 → 25P (Dec 18 '26, 70d, 28.2% OTM) | Cost: $9,594/yr (19% of CC) | New ML: $86,000 ↓ $8,000 | Roll DEBIT $1,620 | Margin (TIMS): $1,573
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 22 CHEAP Dec 18 70d 36.8% $0.46 $0.49 $5,110 10% $92,000 -$2,000 D $760
2 22 Jan 15 98d 36.8% $0.74 $0.79 $5,885 12% $92,000 -$2,000 D $1,360
▶ 3 25 PROT Dec 18 70d 28.2% $0.88 $0.92 $9,594 19% $86,000 -$8,000 D $1,620
4 25 Jan 15 98d 28.2% $1.29 $1.51 $11,248 23% $86,000 -$8,000 D $2,800
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $58 — assignment locks a loss · $52, B $0.32 $6,583/yr $5,110/yr SELF-FUNDING
CC at MID $40 0.6σ, B $1.52 $31,269/yr $5,110/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($52, bid $0.32). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

MU (Neville): HP 390P Maintenance Roll-Out · exp Nov 20 '26, 42d

Stock: $1026.38 Current HP: 390P (42d, 62.0% OTM) Current hedge: $782/yr Current ML: $194,000 If HP lapses: ML $272,000 (+$78,000) Account: Neville (...0865) Contracts: 2 (200 sh) CC income: $75,514/yr Cost cap: 25% of CC = $18,879/yr IV: HIGH 91 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 390 → 400P (Dec 18 '26, 70d, 61.0% OTM) | Cost: $553/yr (1% of CC) | New ML: $192,000 ↓ $2,000 | Roll DEBIT $98 | Margin (TIMS): $41,063
PROTECTIVE PICK (lowest ML within cost cap): HP 390 → 840P (Dec 18 '26, 70d, 18.2% OTM) | Cost: $18,094/yr (24% of CC) | New ML: $104,000 ↓ $90,000 | Roll DEBIT $3,462 | Margin (TIMS): $20,735
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 400 CHEAP Dec 18 70d 61.0% $0.39 $0.53 $553 1% $192,000 -$2,000 D $98
2 390 Jan 15 98d 62.0% $0.61 $0.76 $566 1% $194,000 = D $144
3 400 Jan 15 98d 61.0% $0.50 $0.78 $581 1% $192,000 -$2,000 D $148
4 410 Dec 18 70d 60.1% $0.22 $0.60 $626 1% $190,000 -$4,000 D $112
5 420 Dec 18 70d 59.1% $0.32 $0.60 $626 1% $188,000 -$6,000 D $112
6 390 Dec 18 70d 62.0% $0.24 $0.63 $657 1% $194,000 = D $118
7 430 Jan 15 98d 58.1% $0.81 $0.93 $693 1% $186,000 -$8,000 D $178
8 410 Jan 15 98d 60.1% $0.45 $0.95 $708 1% $190,000 -$4,000 D $182
9 430 Dec 18 70d 58.1% $0.49 $0.72 $751 1% $186,000 -$8,000 D $136
10 460 Dec 18 70d 55.2% $0.51 $0.75 $782 1% $180,000 -$14,000 D $142
11 450 Jan 15 98d 56.2% $0.95 $1.07 $797 1% $182,000 -$12,000 D $206
12 440 Dec 18 70d 57.1% $0.56 $0.77 $803 1% $184,000 -$10,000 D $146
▶ 13 840 PROT Dec 18 70d 18.2% $15.75 $17.35 $18,094 24% $104,000 -$90,000 D $3,462
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $1,229 — assignment locks a loss · $1105, B $28.10 $57,806/yr $553/yr SELF-FUNDING
CC at MID $1105 0.5σ, B $28.10 $57,806/yr $553/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($1105, bid $28.10). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

SNDK: HP 810P Maintenance Roll-Out · exp Nov 20 '26, 42d

Stock: $1584.12 Current HP: 810P (42d, 48.9% OTM) Current hedge: $3,563/yr Current ML: $99,000 If HP lapses: ML $180,000 (+$81,000) Account: Neville (...0865) Contracts: 1 (100 sh) CC income: $120,846/yr Cost cap: 25% of CC = $30,212/yr IV: HIGH 104 qualifying ⚠ ER 2026-10-29 AMC (20d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 810 → 830P (Dec 18 '26, 70d, 47.6% OTM) | Cost: $1,825/yr (2% of CC) | New ML: $97,000 ↓ $2,000 | Roll DEBIT $350 | Margin (TIMS): $67,640
PROTECTIVE PICK (lowest ML within cost cap): HP 810 → 1330P (Jan 15 '27, 98d, 16.0% OTM) | Cost: $28,902/yr (24% of CC) | New ML: $47,000 ↓ $52,000 | Roll DEBIT $7,760 | Margin (TIMS): $33,285
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 830 CHEAP Dec 18 70d 47.6% $1.40 $3.50 $1,825 2% $97,000 -$2,000 D $350
2 840 Jan 15 98d 47.0% $2.50 $5.60 $2,086 2% $96,000 -$3,000 D $560
3 850 Jan 15 98d 46.3% $4.30 $5.60 $2,086 2% $95,000 -$4,000 D $560
4 820 Dec 18 70d 48.2% $0.60 $4.00 $2,086 2% $98,000 -$1,000 D $400
5 850 Dec 18 70d 46.3% $1.65 $4.00 $2,086 2% $95,000 -$4,000 D $400
6 840 Dec 18 70d 47.0% $0.70 $4.50 $2,346 2% $96,000 -$3,000 D $450
7 860 Dec 18 70d 45.7% $1.10 $4.60 $2,399 2% $94,000 -$5,000 D $460
8 890 Dec 18 70d 43.8% $2.45 $4.80 $2,503 2% $91,000 -$8,000 D $480
9 860 Jan 15 98d 45.7% $3.60 $6.90 $2,570 2% $94,000 -$5,000 D $690
10 890 Jan 15 98d 43.8% $5.40 $6.90 $2,570 2% $91,000 -$8,000 D $690
11 810 Jan 15 98d 48.9% $0.70 $7.10 $2,644 2% $99,000 = D $710
12 870 Jan 15 98d 45.1% $4.20 $7.10 $2,644 2% $93,000 -$6,000 D $710
▶ 13 1330 PROT Jan 15 98d 16.0% $74.30 $77.60 $28,902 24% $47,000 -$52,000 D $7,760
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $1630, B $103.70 $106,663/yr $1,825/yr SELF-FUNDING
CC at MID $1650 0.2σ, B $96.40 $99,154/yr $1,825/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($1630, bid $103.70). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.
Joint (...1782)8 fortress(es) · 3 actionable · overview rows

AMZN: HP 215P Roll-Down · exp Nov 20 '26, 42d

RELAXED PASS — no candidate met the standard constraints. Widened gap-mult 2.0x → 8.0x; payback gate 1.0yr → 5.0yr to surface the best available option below. Treat as a guideline breach, not a clean repair.
Stock: $262.65 HP: 18.1% OTM Current hedge: $4,997/yr Baseline (roll-fwd, savings vs this): $5,292/yr SS: $267.92 (unchanged) Account: Joint (...1782) Contracts: 5 (500 sh) CC income: $29,293/yr IV: MEDIUM OTM floor: 10% Stress: 12% DD Payback gate: 12mo (1.0yr) 6 PASS ⚠ ER 2026-10-29 AMC (20d) inside new HP tenor
RECOMMENDED: Roll HP 215 → 205 (Jan 15, 98d) | Save $1,661/yr | Payback 36mo (3.01yr) hedge only, 2mo (0.16yr) w/income (gate: 12mo (1.0yr)) | HP moves to 21.9% OTM | RM 1.52x → 1.66x | Margin (TIMS): $4,617
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 205 Jan 15 98d 21.9% $1.95 $-0.87 $-435 $3,631 $9,777 $1,661 45 $5,000 36mo 2mo 1.66x PASS
2 210 Jan 15 98d 20.0% $2.41 $-1.33 $-665 $4,488 $11,825 $804 40 $2,500 37mo 1mo 1.59x PASS
3 200 Jan 15 98d 23.9% $1.63 $-0.55 $-275 $3,035 $6,239 $2,257 50 $7,500 40mo 3mo 1.74x PASS
4 195 Jan 15 98d 25.8% $1.33 $-0.25 $-125 $2,477 $4,786 $2,816 55 $10,000 43mo 4mo 1.81x PASS
5 190 Jan 15 98d 27.7% $1.18 $-0.10 $-50 $2,197 $3,780 $3,095 60 $12,500 48mo 5mo 1.88x PASS
6 185 Jan 15 98d 29.6% $0.91 $0.17 $85 $1,695 $3,054 $3,598 65 $15,000 50mo 5mo 1.96x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $275, B $7.50 $38,571/yr $3,631/yr SELF-FUNDING
CC at MID $285 0.7σ, B $4.60 $23,657/yr $3,631/yr SELF-FUNDING
AT 12% DRAWDOWN (stock $262.65 → $231.23, hedge $9,777/yr)
CC at SS income stress-adjusted $6,531/yr $9,777/yr DEFICIT $270/mo
CC at MID income stress-adjusted $2,571/yr $9,777/yr DEFICIT $600/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($285, bid $4.60) in NORMAL markets. Self-funds today.
In 12% drawdown, even MID is short ~$600/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.

HOOD: HP 80P Roll-Down · exp Jan 15 '27, 98d (no viable candidates)

Stock: $109.36 Current HP: 80P (98d, 26.8% OTM) Current hedge: $8,566/yr Gap: 15 Account: Joint (...1782) Contracts: 10 (1,000 sh) IV: HIGH
No HP candidates passed all filters. Reasons:
  • 12 candidate(s) priced

IREN (Joint): HP 35P Roll-Down · exp Jan 15 '27, 98d

Stock: $34.83 HP: ITM Current hedge: $40,969/yr Baseline: current hedge (no same-strike quote) SS: $44.00 (unchanged) Account: Joint (...1782) Contracts: 20 (2,000 sh) CC income: $49,500/yr IV: HIGH OTM floor: 8% Stress: 22% DD Payback gate: 12mo (1.0yr) 4 PASS ⚠ ER 2026-11-05 INTRADAY (27d) inside new HP tenor
RECOMMENDED: Roll HP 35 → 32 (Jan 15, 98d) | Save $12,291/yr | Payback 6mo (0.49yr) hedge only, 1mo (0.10yr) w/income (gate: 12mo (1.0yr)) | HP moves to 8.1% OTM | RM 1.75x → 1.94x | Margin (TIMS): $1,188
#NEW HPEXPIRYDTEOTM%ASK ROLL CR/SHROLL TOTALHEDGE/YRSTRESS/YRSAVED/YR GAPML+PAYBACKPB+INCNEW RM
1 32 Jan 15 98d 8.1% $3.85 $1.45 $2,900 $28,679 $18,809 $12,291 15 $6,000 6mo 1mo 1.94x PASS
2 30 Jan 15 98d 13.9% $2.95 $2.35 $4,700 $21,974 $25,513 $18,995 17 $10,000 6mo 2mo 2.06x PASS
3 27 Jan 15 98d 22.5% $1.89 $3.41 $6,820 $14,079 $33,707 $26,891 20 $16,000 7mo 3mo 2.25x PASS
4 25 Jan 15 98d 28.2% $1.51 $3.79 $7,580 $11,248 $23,837 $29,721 22 $20,000 8mo 3mo 2.38x PASS
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $49, B $0.47 $9,669/yr $28,679/yr DEFICIT $1,584/mo
CC at MID $40 0.6σ, B $1.52 $31,269/yr $28,679/yr SELF-FUNDING
AT 22% DRAWDOWN (stock $34.83 → $27.16, hedge $18,809/yr)
CC at SS income stress-adjusted $6,583/yr $18,809/yr DEFICIT $1,019/mo
CC at MID income stress-adjusted $6,994/yr $18,809/yr DEFICIT $985/mo
SUSTAINABLE (NORMAL) Stress requires MID+ CC or capital
CC WRITING STRATEGY
WRITE CCs at MID ($40, bid $1.52) in NORMAL markets. Self-funds today.
In 22% drawdown, even MID is short ~$985/mo — tighten CCs above MID (closer to ATM) OR plan to inject capital.
RetireInc (...7291)9 fortress(es) · 3 actionable · overview rows

AAPL: HP 285P Maintenance Roll-Out · exp Nov 20 '26, 42d

Stock: $336.85 Current HP: 285P (42d, 15.4% OTM) Current hedge: $3,563/yr Current ML: $69,820 If HP lapses: ML $212,320 (+$142,500) Account: RetireInc (...7291) Contracts: 5 (500 sh) CC income: $57,718/yr Cost cap: 25% of CC = $14,429/yr IV: MEDIUM 8 qualifying ⚠ ER 2026-11-02 INTRADAY (24d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 285 → 285P (Dec 18 '26, 70d, 15.4% OTM) | Cost: $4,380/yr (8% of CC) | New ML: $69,820 = ML | Roll DEBIT $470 | Margin (TIMS): $5,942
PROTECTIVE PICK (lowest ML within cost cap): HP 285 → 300P (Jan 15 '27, 98d, 10.9% OTM) | Cost: $8,473/yr (15% of CC) | New ML: $62,320 ↓ $7,500 | Roll DEBIT $1,905 | Margin (TIMS): $5,223
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 285 CHEAP Dec 18 70d 15.4% $1.61 $1.68 $4,380 8% $69,820 = D $470
2 285 Jan 15 98d 15.4% $2.45 $2.56 $4,767 8% $69,820 = D $910
3 290 Dec 18 70d 13.9% $1.92 $2.10 $5,475 9% $67,320 -$2,500 D $680
4 290 Jan 15 98d 13.9% $3.00 $3.20 $5,959 10% $67,320 -$2,500 D $1,230
5 295 Dec 18 70d 12.4% $2.51 $2.63 $6,857 12% $64,820 -$5,000 D $945
6 295 Jan 15 98d 12.4% $3.60 $3.80 $7,077 12% $64,820 -$5,000 D $1,530
▶ 7 300 PROT Jan 15 98d 10.9% $4.35 $4.55 $8,473 15% $62,320 -$7,500 D $1,905
8 300 Dec 18 70d 10.9% $3.10 $3.25 $8,473 15% $62,320 -$7,500 D $1,255
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $340, B $9.45 $48,600/yr $4,380/yr SELF-FUNDING
CC at MID $355 0.7σ, B $3.95 $20,314/yr $4,380/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($340, bid $9.45). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

APP: HP 185P Maintenance Roll-Out · exp Nov 20 '26, 42d

Stock: $276.03 Current HP: 185P (42d, 33.0% OTM) Current hedge: $1,608/yr Current ML: $48,300 If HP lapses: ML $66,800 (+$18,500) Account: RetireInc (...7291) Contracts: 1 (100 sh) CC income: $16,318/yr Cost cap: 25% of CC = $4,079/yr IV: HIGH 10 qualifying ⚠ ER 2026-11-04 INTRADAY (26d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 185 → 185P (Dec 18 '26, 70d, 33.0% OTM) | Cost: $1,434/yr (9% of CC) | New ML: $48,300 = ML | Roll DEBIT $205 | Margin (TIMS): $9,240
PROTECTIVE PICK (lowest ML within cost cap): HP 185 → 210P (Jan 15 '27, 98d, 23.9% OTM) | Cost: $3,427/yr (21% of CC) | New ML: $45,800 ↓ $2,500 | Roll DEBIT $850 | Margin (TIMS): $8,650
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 185 CHEAP Dec 18 70d 33.0% $2.30 $2.75 $1,434 9% $48,300 = D $205
2 185 Jan 15 98d 33.0% $3.50 $4.60 $1,713 10% $48,300 = D $390
3 190 Dec 18 70d 31.2% $2.70 $3.40 $1,773 11% $47,800 -$500 D $270
4 190 Jan 15 98d 31.2% $4.40 $5.40 $2,011 12% $47,800 -$500 D $470
5 195 Dec 18 70d 29.4% $3.30 $4.10 $2,138 13% $47,300 -$1,000 D $340
6 195 Jan 15 98d 29.4% $5.10 $6.30 $2,346 14% $47,300 -$1,000 D $560
7 200 Dec 18 70d 27.5% $3.90 $4.70 $2,451 15% $46,800 -$1,500 D $400
8 200 Jan 15 98d 27.5% $6.00 $7.30 $2,719 17% $46,800 -$1,500 D $660
▶ 9 210 PROT Jan 15 98d 23.9% $8.10 $9.20 $3,427 21% $45,800 -$2,500 D $850
10 210 Dec 18 70d 23.9% $5.80 $6.60 $3,441 21% $45,800 -$2,500 D $590
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $607 — assignment locks a loss · $370, B $2.55 $2,623/yr $1,434/yr SELF-FUNDING
CC at MID $315 0.6σ, B $9.20 $9,463/yr $1,434/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at SS ($370, bid $2.55). Conservative far-OTM strike covers the hedge in BOTH normal and 0% drawdown — minimal assignment risk.

IREN (RetireInc): HP 23P Maintenance Roll-Out · exp Nov 20 '26, 42d

Stock: $34.83 Current HP: 23P (42d, 34.0% OTM) Current hedge: $5,562/yr Current ML: $107,700 If HP lapses: ML $153,700 (+$46,000) Account: RetireInc (...7291) Contracts: 20 (2,000 sh) CC income: $49,500/yr Cost cap: 25% of CC = $12,375/yr IV: HIGH 2 qualifying ⚠ ER 2026-11-05 INTRADAY (27d) inside new HP tenor
CHEAPEST PICK (lowest annual cost, ML preserved): HP 23 → 25P (Dec 18 '26, 70d, 28.2% OTM) | Cost: $9,594/yr (19% of CC) | New ML: $103,700 ↓ $4,000 | Roll DEBIT $1,320 | Margin (TIMS): $1,581
PROTECTIVE PICK: same as CHEAPEST (no higher-strike candidate clears the cost cap).
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
▶ 1 25 CHEAP PROT Dec 18 70d 28.2% $0.88 $0.92 $9,594 19% $103,700 -$4,000 D $1,320
2 25 Jan 15 98d 28.2% $1.29 $1.51 $11,248 23% $103,700 -$4,000 D $2,500
POST-REPAIR SUSTAINABILITY CC chain Nov 13 (35d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS BELOW SS $67 — assignment locks a loss · $52, B $0.32 $6,583/yr $9,594/yr DEFICIT $251/mo
CC at MID $40 0.6σ, B $1.52 $31,269/yr $9,594/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at MID ($40, bid $1.52). Self-funds in BOTH normal and 0% drawdown. At SS the position bleeds, so don't drift too far OTM.

HP roll-downs do not change Safe Strike. SS = Max(LC+ND, (LC+SP+ND)/2). HP is not in the formula.

Monthly hedge cost prorated: (30/DTE) × (Ask × Shares). Payback = ML increase / Annual savings.

EST = ask price estimated as mid × 1.10 (10% safety buffer). Verify with live prices before executing.

Always prefer longest viable DTE for repair rolls (fewer rolls/yr = lower annual cost).