FORTRESS REPAIRHP Roll-Down Analysis
Generated: 2026-06-27 10:42:28
Payback gate: 12mo (1.0yr)
SS = Max(LC+ND, (LC+SP+ND)/2)
TOTAL HEDGE (CURRENT)
$15,513/yr
TOTAL HEDGE (CHEAPEST)
$12,002/yr
Δ HEDGE (CHEAPEST vs CURRENT)
-$3,510/yr
ROLL DEBIT (CHEAPEST)
-$2,900
MAX LOSS REDUCTION (PROTECTIVE)
-$0

Fortress Position Overview

TICKERSTOCKLCSPHPSC SSGAPRMHP OTM%STATUSCTRSICNOTIONALURGENCY
ETHA → $11.90 1316 100 $17.33 62.39x 16.0% SAFE 50 $21,650$59,500 ROLL NOW (20d)

ETHA: HP 10P Maintenance Roll-Out · exp Jul 17 '26, 20d

RELAXED PASS — no candidate met the standard constraints. Widened cost cap 25% → 75% of CC to surface the best available option below. Treat as a guideline breach, not a clean repair.
Stock: $11.90 Current HP: 10P (20d, 16.0% OTM) Current hedge: $15,513/yr Current ML: $51,650 CC income: $18,352/yr Cost cap: 75% of CC = $13,764/yr IV: HIGH 1 qualifying
CHEAPEST PICK (lowest annual cost, ML preserved): HP 10 → 10P (Oct 16 '26, 111d, 16.0% OTM) | Cost: $12,002/yr (65% of CC) | New ML: $51,650 = ML | Roll DEBIT $2,900
PROTECTIVE PICK: same as CHEAPEST (no higher-strike candidate clears the cost cap).
#NEW HPEXPIRYDTEOTM% BIDASKHEDGE/YR%CC NEW MLΔMLROLL
1 10 CHEAP PROT Oct 16 111d 16.0% $0.66 $0.73 $12,002 65% $51,650 = D $2,900
POST-REPAIR SUSTAINABILITY CC chain Jul 31 (34d)
SCENARIO CC INCOME HEDGE COST VERDICT
CC at SS $17, B $0.03 $1,588/yr $12,002/yr DEFICIT $868/mo
CC at MID $14 0.6σ, B $0.28 $14,585/yr $12,002/yr SELF-FUNDING
FULLY SUSTAINABLE CC at MID covers hedge in normal + stress
CC WRITING STRATEGY
WRITE CCs at MID ($14, bid $0.28). Self-funds in BOTH normal and 0% drawdown. At SS the position bleeds, so don't drift too far OTM.

HP roll-downs do not change Safe Strike. SS = Max(LC+ND, (LC+SP+ND)/2). HP is not in the formula.

Monthly hedge cost prorated: (30/DTE) × (Ask × Shares). Payback = ML increase / Annual savings.

EST = ask price estimated as mid × 1.10 (10% safety buffer). Verify with live prices before executing.

Always prefer longest viable DTE for repair rolls (fewer rolls/yr = lower annual cost).